Rx S/U Flashcards

1
Q

What determines critical count rate?

A

Initial Count Rate X 5-7 doublings (initial CR X 25 to 27)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Basis for 561°F

A

(1) the moderator temperature coefficient is within its analyzed temperature range,
(2) the trip instrumentation is within its normal operating range,
(3) the pressurizer is capable of being in an OPERABLE status with a steam bubble, and
(4) the reactor vessel is above its minimum RTNDT temperature.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What determines critical rod height?

A

Reactivity balance such that it is the rod height where core total reactivity is 0, based on a constant temperature and equilibrium xenon and samarium and a critical boron concentration that we have established.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Reasons for ECC < Critical Rod Height

A

Something added negative reactivity to the core that we have not accounted for.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Why take critical data?

A

To verify that the reactor is behaving IAW with the predicted physics parameters.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Are extended range NI’s required to be operable?

A

Yes in modes 3,4,5. 2 SR, 2 IR, 3 PR, 2XR

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What is your biggest concern when performing a RX S/U?

A

Criticality

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

If S/U commences at 100 cps what would you expect it to be at criticality?

A

5 - 7 doublings 3200-12800 cps

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What would CB A rod position read when CB B starts to move out?

A

137 steps

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Reactor Trip Requirements

A

Not critical and < 561F, trip.

Critical and < 561F, 15 minutes to recover, if not, trip.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

IF both Source Range Channel count rates rise unexpectedly by a factor of two (doubles) or more during Reactor Startup, THEN ….

A

immediately INSERT all Control Rods fully into the core AND NOTIFY Reactor Engineering to evaluate the unexpected rise in counts.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Let’s say you add enough reactivity to double counts, what would be the status of the reactor if you added the same amount of reactivity you added to double counts?

A

You would be slightly supercritical. CR1/1-keff2 = CR2/1-keff1

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What are the DRPI accuracy requirements?

A

±12 steps

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

During the evaluations, do you expect everyone to call criticality at the same rod height?

A

No, because core reactivity could be different due to boron and temperature, changing CRH.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

When would we have rod withdrawal limits?

A

If the MTC had the possibility to be positive.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Assume an initial count rate of 200 CPS. When do you expect the reactor to be critical?

A

6400 – 25600 cps

17
Q

What do you do if two control rods fall into the core?

A

Trip the reactor

18
Q

What do you do if the RX was predicted to go critical < C at 65 steps?

A

IF ICRR data from three consecutive rod withdrawals predict criticality below Rod Insertion Limit of 65 steps on Bank C, Immediately manually INSERT all Control Banks into core, AND NOTIFY Reactor Engineering to evaluate the unexpected situation, AND NOTIFY Unit Operations Manager.

19
Q

What power level would you be at if a S/G Safety fails open?

A

6% - the entire bank of safeties (20 valves) is rated for 120% steam flow. 120% / 20 = 6% per safety valve

20
Q

What power level would you be at if a Steam Dump fails open?

A

5.5% per Steam Dump

21
Q

What power level would you be at if a S/G PORV fails open?

A

6.3% per PORV

22
Q

What are the minimum NIS requirements for a reactor startup?

A

2 SR, 2 IR, 3 PR

23
Q

How do you determine when the reactor is critical?

A

Constant positive startup rate with no rod motion

24
Q

When is criticality anticipated?

A

Criticality SHALL be anticipated at any time during AND after positive reactivity is added to reactor using control rod movement, temperature changes, or boron dilution.

25
Q

What are the NIS overlap requirements?

A

One half decade SR to IR and IR to PR

26
Q

What will your actions be if the reactor is predicted to go critical before the minimum rod height is reached (>500 pcm below ECP)?

A

IF ICRR data from previous rod withdrawals consistently AND unexpectedly predicts criticality at a Control Bank position outside ECP - 500 pcm band AND above the Minimum Insertion limit of 65 steps on Control Bank C, THEN PERFORM the following:

STOP the Reactor Startup.

NOTIFY Unit Operations Manager.

Reactor Engineering and the Shift Manager SHALL evaluate and DETERMINE the cause of exceeding the -500 pcm position.

IF cause can NOT be determined within one hour, THEN manually INSERT all Control Banks into the core.

WHEN cause is determined AND resolved, THEN Reactor Startup may recommence.

27
Q

What will your actions be if the reactor is not critical when the ECP is reached?

A

Continue to criticality until the reactor is critical or the +500 pcm limit is reached.

28
Q

What will your actions be if the maximum rod height is reached (>500 pcm above ECP)?

A

IF ICRR data from previous rod withdrawals consistently AND unexpectedly predicts criticality at a Control Bank position outside ECP +500 pcm band OR All Rods Out condition WITHOUT attaining criticality as determined by the STA or Reactor Engineer, THEN PERFORM the following:

STOP the Reactor Startup.

NOTIFY Unit Operations Manager.

Reactor Engineering and the Shift Manager SHALL evaluate and DETERMINE the cause of exceeding the +500 pcm position.

IF cause can NOT be determined within one hour, THEN manually INSERT all Control Banks into the core.

WHEN cause is determined AND resolved, THEN Reactor Startup may recommence.

29
Q

Explain the basis for maximum and minimum rod heights.

A

Minimum rod height – (Group C at 65 steps) – Shutdown Margin Maximum rod height – positive MTC

30
Q

Why is the reactor leveled at 10-8 amps?

A

To record Critical Data. Date, Time, Unit, Rod Position, RCS Tave, RCS Boron

31
Q

How can you identify the POAH?

A

Lowering startup rate, rising temperature, rising pressurizer level,

32
Q

What if a Source Range Channel Fails during startup?

A

Applicable in Mode 2 below P-6 

With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, suspend all operations involving positive reactivity changes. Limited plant cooldown or boron dilution is allowed provided the change is accounted for in the calculated SHUTDOWN MARGIN.

33
Q

What if an Intermediate Range channel fails during startup?

A

Below the P-6 (Intermediate Range Neutron Flux Interlock) Setpoint:

restore the inoperable channel to OPERABLE status prior to increasing THERMAL POWER above the P-6 Setpoint.

Above the P-6 (Intermediate Range Neutron Flux Interlock) Setpoint but below 10% of RATED THERMAL POWER:

restore the inoperable channel to OPERABLE status prior to increasing THERMAL POWER above 10% of RATED THERMAL POWER.