Roofing IL - Day 1 Flashcards

1
Q

What provides the weatherproofing in a built up roof system?

A

Bitmen

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

A roof with a slope of 5/12 is considered?

A

Steep Slope

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

A rafter that extends diagonally from an outside corner of a building to the ridge board is called?

A

Hip rafter

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

The temperature in which heated bitumen is at proper viscosity is?

A

560*

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

The projecting edge of a roof extending beyond the supporting wall is called?

A

Eave

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What provides the waterproofing and reinforcement in single-ply membrane?

A

Polymers

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What can lead to the splitting, buckling and ridging of roof membranes?

A

Poor installation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Bitmen is also known as?

A

Tar

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Built-up roof systems are?

A

Resistant to wind up-lift

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What should be installed on the same plane and line as the building’s structural expansion?

A

Roof expansion joint

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

In asphalt shingle construction, the natural-colored mineral granules are primarily added for?

A

Providing ultra-violet & weathering protection

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

How many nails in a high wind areas may be required per shingle?

A

6

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

How many types of valley construction is in asphalt shingle?

A

3

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What is the absorption rates of clay tile?

A

2-10

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

How much can 100 to 700 slate pieces weigh?

A

2 ton

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Preferred number of nails to fasten a roof slate is?

A

2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

Preferred material for nail in slate is?

A

Copper

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

Bitumen becomes what with heat?

A

Fluid

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

A square measures?

A

10 foot by 10 foot

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

The recommended spacing for plywood sheathing at the butt end is?

A

1/8

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

The recommended thickness for OSB with a rafter spacing of 16” is?

A

15/32

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

The dead load of a roof is the weight of the roof deck, shingles and?

A

Underlayment

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

Underlayment in roofs of 4:12 or more, the upper courses of felt should overlap the lower courses by at least how many inches?

A

2”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

Which type of single-ply membrane which are field applied using only one layer of membrane material is vulcanized during manufacturing ?

A

Thermoset

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
A single-ply roof membrane has two basic principal components.
Water proof + reinforcement
26
Name the three primary parts of a membrane roof system?
Insulation, roof membrane, surfesing
27
A roof with a slope of 4: 12 (chart 1.054) has a run of 24 feet. what is the length of the rafter?
25.30 (24 x 1.054)
28
Convert 7 inches into decimals
.58 (7 divided by 12)
29
True or false: Underlayment adds to the fire rating of the roof system?
True
30
What are the non-stationary loads a roof deck must carry?
Mobile installation equipment and labor
31
Composition for structural lightweight concrete?
Cement, water, shale, clay or slate aggregates
32
Which is the weatherproofing component in BUR membranes?
Bitumen or cold-applied adhesives
33
What is the best way to install BUR membranes?
Sandwiched between layers of hot bitumen or cold-applied adhesives
34
Which adds the most fire resistance in low slope membranes?
Aggregates, pea gravel or similar materials (rocks don't burn)
35
Whats recommended when heating bitumen during installation?
Circulate bitumen while heating
36
Whats the best way to lay BUR plies?
Lay in a single, complete membrane, all on the same day
37
Whats the most accurate regarding the best roofing system?
A roof matched closely to building specifications and requirements
38
Which is not the purpose of a roof deck?
Waterproofing
39
What is the minimum recommendation for replacement of expansion joints in a roof final assembly?
Same plane or line as a buildings structural expansion joints
40
Whats the main purpose of expansion joints in low-slope system?
To minimize the effects of stresses and movements
41
What provides the reinforcement in non-reinforced thermoset or thermoplastic membranes?
Polymers making up thermoset or thermoplastics
42
How high can EVT rise for heated bitumen?
560 degrees
43
What is the movement of water vapor?
Vapor drive moves from inside to outside in cooling weather
44
In vaulted ceilings , which would most likely lead to rapid deterioration of a roof?
Insulated, not vented decks
45
Why does the NRCA not recommend OSB?
OSB retains more moisture which can dislodge fasteners
46
What size water and ice dam protection should be used on a roof with a slope less than 4:12?
Minimum of 36 from the inside the exterior wall
47
What type of valley would need to be enlarged when ice and snow are present?
Open valleys
48
Which would be the most appropriate when installing downslope side chimney flashing?
Apron flashing
49
How should crickets in the upslope side of a chimney be constructed?
Wood framing
50
What does the NRCA recommend when installing drip edge , or eave edge metal flashing?
Extend underlayment over the flange
51
What can be used in place of a water and ice dam protection in a tile roofing system?
Two-ply underlayment with interply of asphalt roof cement adhesive.
52
Proper low-slope drainage with dry weather.
48 hours following moisture related weather
53
Which would least likely result from poor drainage?
Immediate changes to slope and structural integrity of the roof deck.
54
Why are pitch-pockets not recommended?
They need frequent repair
55
Whats the purpose of eave closures in a tile roof?
To prevent birds, insects etc from entering the ends of the first tile course.
56
Which is the most common pattern in a wood roof?
Straight line
57
Which is the purpose of a batten system in a tile roof?
To straighten the bond between the tiles and roof
58
What does the NrCA recommend when installing an asphalt shingle roof?
Minimum of 6 nails per shingle in high wind areas
59
What slope does the NRCA recommend slate roofing have a waterproof membrane under slate?
All slopes
60
What fasteners should be used to attach slate to roof decks?
Copper nails
61
Which would not likely create interior damage?
Built-in gutter at eave
62
What is used for moisture control in low-slope roofs?
Vapor retarders
63
Moisture in the air, takes form of?
Vapor
64
Vapor drive can be characterized by the phrase:
Warm chasing cold
65
Reduces the flow of water vapor and prevents warm humid air from contracting a cold surface and is called a?
Vapor retarder
66
How many mopping of hot asphalt over two plies of fiberglass ply felt are required to give a perm rating of 0?
2-3
67
The recommended spacing for hangers for gutters is?
3'
68
the recomended distance the ice and water shield should run upslope a roof with a slope LESS THAN 4:12 in a heavy snowfall area is?
36"
69
What do you call a second roof built on top of the primary roof to increase the slope of a roof or valley or chimney or penetration wider than 24"?
Cricket
70