When was it restored
A
1994-96
2
Q
What were the aims
A
Water course back to a more natural state, improve water quality, manage bank side vegetation and habitats
3
Q
Why did they allow flooding here
A
It affected no one here (as they created a more natural channel) because it was away from Coleshill and decreased the chances of flooding downstream in Oxford
4
Q
What were the 4 main strategies used
A
- Mill Leaf ‘by pass’
- Introduction of meanders
- Mature willows retained along old course- take up a lot of water and decrease soil erosion