Risk Management Best Practices Flashcards
Tangible assets
buildings, furniture, equipment, data,
paper documents
Intangible assets
Ideas, commercial reputation, brand
Procedures
Supply chains, critical procedures, standard operating procedures
Disaster Recovery
Plan for both small disasters and large disasters
Can be managed through a 3rd-party
Cold spare
in the box, turned off
Warm spare
may be racked and powered, but not connected
Hot spare
powered on, always updated
Cold site
no hardware, no data, no people
Warm site
hardware is waiting, you bring the data
Hot site
an exact replica, stocked with hardware and software
Raid 0
Striping without parity
High performance,
no fault tolerance
Raid 1
Mirroring
Duplicates data for fault tolerance, but requires twice the disk space
Raid 5
Striping with parity
Fault Tolerant,
only requires an additional disk for redundancy