Review Questions Flashcards

1
Q

What is the difference between RNAV and RNP specifications

A

RNP specifications have a requirement for on board performance monitoring and alerting

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

In the PBN specifications, the number included in the specification name refers to ?

A

The required accuracy, in Nm, of the navigation system

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Which of the following is not a basic function required in all PBN navigation specifications

A

Facility to operate offset parallel tracks

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Which of the navigation aids may be used in PBN

A

GNSS, VOR, DME and INS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Which of the following statements regarding PBN model is true

A

Navigation system error is usually negligible

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

A requirement of PBN is that the total system error is …

A

Is equal or less than the required accuracy of the navigation specification for at least 95% of the time

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

The navigation database …

A

Is valid for 28 days and must be confirmed valid prior to operating

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

When completing a flight plan for a flight which is intended to include operations in PBN airspace

A

Block 18 contains information on the aircraft PBN capabilities relevant to the flight, and is limited to 8 entries

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

When considering a notified RAIM outage that affects a planned flight…

A

A RAIM outage of more than 5 minutes will require a re routing or re timing of the flight

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

When planning for an RNP APCH arrival at destination, it is necessary to ensure

A

Sufficient means are available to permit either the destination or alternate in the event of a loss of the RNP

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

In order to operate on PBN routes and procedures

A

. The aircraft must be certified to the required navigation specification
. The pilot must be approved for PBN operations

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

When operating in PBN airspace, if a system failure results in loss of PBN capability…

A

ATC must be notified using the phrase, unable RNP due…”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

The radius to fix leg……?

A

Is useable in terminal airspace by aircraft certified specifically to perform RF legs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Why must a SID or STAR be selected by name from the database rather than be created manually by insertion of the waypoints

A

The database coding of the procedure includes additional information such as the RNP value for alerting

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What modifications are allowed to a SID or STAR once it has been selected from database

A

Direct to .. actions may be performed, at the request of ATC

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Approach operations are classified either 2D or 3D. A 3D approach operation…

A

Is performed to DA, allowing for height loss after the commencement of a missed approach

17
Q

Which statement is correct regarding approach operations to LNAV/VNAV minima?

A

Either Baro-VNAV or SBAS may be used to operate these approaches

18
Q

Missed approaches based on PBN navigation specifications ….

A

May be used, provided the reason for the missed approach was not the loss of PBN capability on the aircraft

19
Q

Verification of the approach procedure prior to operation…

A

Should be performed by comparison with the appropriate chart

20
Q

For RNP APCH approaches using Baro-VNAV, the temperature published on the chart….

A

Is the minimum temperature at which the use of the procedure is authorised

21
Q

Vertical deviation is displayed to the pilot using a deviation scale. These scales ….

A

Will be calibrated such that full scale deflection represents the maximum allowed deviation from the vertical path

22
Q

What are the requirements of PBN

A

Accuracy
Integrity
Continuity
Functionality

23
Q

GNSS stands for

A

Global Navigation Satellite System