Regulatory & Reliability Flashcards

1
Q

What is the significance of FERC order 888?

A

Implemented the OPEN ACCESS RULE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What year was Open Access Rule (order 888) implemented?

A

2007

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What are the categories that DWR is registered under with NERC?

A

GO - Generation Owner
GOP - Generation Operator
TO - Transmission Owner
RP - Resource Planner (the power desk)

note: we are not TOP yet

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What happened to make the NERC standards mandatory and enforceable

A

The 2003 North Eastern Blackout

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What year did NERC standards become mandatory and enforceable?

A

2007

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What year was NERC established?

A

It was established in 1968

in response to the 1965 blackout

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What are the ancillary services that DWR bids on the market?

A

Reg Up
Reg Down
Spin Reserve
Non-Spin Reserve

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Spin Reserve is when:

Generator is _____ and available to provide energy in ______, with a _________ that can respond to frequency excursion.

A

Online ; 10 mins ; governor

the Answer is most likely C

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Describe the difference between “energy” and “capacity” when referring to a Generator

A

energy - is the megawatts that the generator is moving

capacity - is the max amount that the generator is capable of.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What is the another name for the “15 minute market”?

A

Energy Imbalance Market

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

The ADS is used for what?

A

Dispatch generation to match load

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What are the 3 inputs to LMP?

A
  • losses
  • load/energy
  • congestion
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What are the 2 main ISO power trading markets?

A
  • day ahead

- real time

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What is the “Market Clearing Price” ?

A

The point at which the “Demand Bid” and “Supply Bid” intersect (are equal).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Congestion is the component of the LMP that is caused by a lack of transmission capability and outages?

T or F

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What are the 3 zones in the state of California?

A

ZP-26
NP-15
SP-15

17
Q

Name 3 DWR plants that have Generation in the BES

A

Hyatt, Thermolito, Gianelli, Warne, Devil Canyon

18
Q

What is used to ensure that you stay within the capability of a Generating unit?

A

A capability curve (aka “D Curve” )

19
Q

Overgeneration leads to frequencies higher or lower than 60 HZ?

20
Q

Undergeneration leads to frequencies higher or lower than 60 HZ?

21
Q

How long do we have to comply with load drops?

22
Q

How long do we have before we must report that a running generating unit has no AVR in service?

A

30 mins after becoming aware

23
Q

What year did NERC change its name from
North American Electric Reliability Council
to
North American Electric Reliability Corporation ?

24
Q

What is the name of the entity responsible for monitoring compliance with reliability standards?

A

WECC (our reliability entity)

25
Energy is produced and consumed at the speed of light? T or F
True
26
In order to register as a "Generator Owner" with NERC what must true?
- a single generator with an output of 20MVA or greater - a plant with a generation out of 75MVA or greater - the ability to perform a "blackstart" - any generator, regardless of size, that is deemed to be vital to the Bulk Electric System
27
Which DWR Field Division has no electrical components that are considered part of the BES?
San Joaquin - no generation and no owned lines over 100kV
28
Name 2 transmission lines that DWR owns that are part of the BES. (use full name)/
Midway Wheeler Ridge #1 - 230kV Midway Wheeler Ridge #2 - 230kV Oroville - Thermalto - Table Mountain Line 1 -230kV Oroville -Table Mountain Line 2 - 230kV Oroville - Thermailto -Table Mountain Line 3 - 230kV
29
Spinning Reserve is....... blah blah blah
True
30
Generations owners must comply with operating instructions unless what is true?
- violates safety | - violates equipment, or regulatory, or statutory requirements
31
What OP do we refer to when we cannot comply with an operating instruction?
OP-25
32
Describe 3-way communication
1. (sender) clearly state operating instrcution 2. (receiver) repeats the operating instruction back to sender - not necessarily verbatim 3. (sender) confirms that receivers response was correct -If at any time there is confusion the persons must ask for the other to repeat their dialogue
33
What is FERC responsibile for?
- regulating the interstate transportation of natural gas, oil, and electricity - regulating the wholesale sales of electricity and oil - licensing and inspecting hydroelectric projects - approving construction of intestate natural gas pipelines, storage facilities, and Liquified Natural Gas (LNG) terminals - monitoring energy markets and companies to protect customers from market manipulation and higher prices; and resolving disputes between energy companies, and public
34
Name the 4 Interconnections in North America
1. Eastern - 625,000 MW 2. Western - 160,000 MW 3. Texas - 70,000 MW 4. Quebec 35,000 MW