Regs & IFR Flashcards
Part 91 Flights
Training, Reposition & Maintenance
Weight & Balance Trim
Aft of 236’: Diamond (R)
Fwd of 236’ Square (L)
What does sterile flight means?
Pax went through TSA
Va (Maneuvering Speed)
5,730 lbs : 120 kts
9,921 lbs : 158 kts
10450 lbs : 163 | PC 12 - 47 |
What is Operational Control Definition?
Authority over initiating, conducting, or terminating a flight.
Who has operational control?
- Director of Operation (DOO)
- ^ ^ Maintenance (DOM)
- Chief Pilot
- Dispatch
Letter of investigation to FAA?
3 days & notify chief pilot
Name the following:
- Director of Safety
- Director of Maintenance
- Chief Pilot
- Director of Operation
- Agent for Service
- DOS: Bryan Wakelin
- DOM: Michael Acosta
- CP: Bryan Wakelin
- DOP: Nadim El Khoury
- AFS: Shawn Simpson
A061?
Certifies of use of an electronic flight bag
C052C: What’s the reduced precision CAT I ILS Landing?
- 200 ft DH & 1800RVR
- Flight crew must use FD or AP to DA or initiation of MAP.
- If single pilot, both FD & AP must be used.
When do you need an alternate for Pt. 135?
• +/- 1 hour eta
• Get the approach plate to the destination, add 1500 to the circling MDA -or- If there’s no circling, 1500 above lowest minimums (ILS) or 2,000 ft above the airport elevation, whichever is higher.
• Visibility: Forecast to be at-least 3 miles or 2 miles more than the lowest applicable visibility minimums.
What do you need to do when you need an alternate?
• If you go to nontowered airport & only have 1 nav system (ex. ONLY GPS) then you need to add 400 to MDA/DA & 1SM. With 2 systems, (ex. GPS & VOR) then add 200 & 1/2 SM.
(C057) IFR Takeoff Minimums:
Allows us to depart with the lowest approach minimums we could use to come back to departure airport.
On a circling approach, Minimums can’t be lower than?
• CAT B (91-120 kts)
• 450’ & 1SM
MEL maximum times between deferral & repair
• Category A: must be repaired “specific it em”
• B: must be repaired 3 consecutive cal. days.
• C: must be repaired 10 consecutive cal. days.
• D: must be repaired 120 consecutive cal days.
- B & C - obtain a single authorization extension to repair interval
(ex. B - 6, C - 20)