RB and AB Ventilation Flashcards
What’s the purpose of the backdraft dampers?
Prevent reverse flow through idle RB cooling fan.
What is the purpose of the bypass damper?
Used to bypass the chill water coil during ESAS and is cooled via SW.
What is the difference in the ‘E’ RB Cooling fan?
Does not have SW cooling coil. Has a 2 stage fan and was added to aid in RB heat load.
Can not be in service when Purge fan is running.
How do the RB cooling fan SW MOVs operate? What is the normal position of the solenoid bypass valve and its purpose?
When HS is taken to open, inlet valve travels 25 - 40% open and outlet will start to travel open. When closed, outlet valve begins to close and when 80 - 90% closed, inlet valve will close.
The solenoid bypass valve is normally open to keep system filled and avoid hydraulic lock in the header caused by warming and expansion of cold water when coolers are isolated.
What actuates the RB coolers and what is the time delay for start?
VSF-1A-D receive a start signal from ES 5 or 6. VSF-1A/B are powered from B-5 and C/D from B-6.
Cooling fans will start after 50 seconds due to EDG load sequence.
Chill water closes, SW opens and cooler bypass dampers unlatch to pass air flow across SW coils.
What is the TS required RB pressure?
-1 to 3 psig modes 1 - 4 and restore within 1 hour per TS 3.6.4.
Per limits and precautions if average of all 4 RB pressure indicators is > 2.64 psig or < -0.64 psig modes 1 - 4.
What TS is associated with RB cooling system?
TS 3.6.5 requires both RB cooling trains operable (only one train required modes 3/4) in modes 1/2. If one is inoperable then restore in 7 days.
Both RB cooling trains provide 100% cooling capacity. 1 train of RB cooling and 1 train RB spray provides 100% capacity.
What is the start sequence for the RB purge dampers based on RB pressure?
If RB pressure positive - open outlet dampers first, then inlets
If RB pressure negative - open inlets first, the outlets
What ES signal will close purge dampers?
ES 3 or 4 will close purge isolations.
What interlock is present between RB purge exhaust and supply fan?
VEF-15 is interlocked with supply fan to start upon VSF-2 start. If VEF-15 fails to start then VSF-2 will trip after 10 seconds.
What is required prior to placing RB purge in service?
Gaseous release permit
When will Hydrogen Recombiners be placed in service? What are their power supplies?
When hydrogen sampler reading of 3% concentration. They operate at 1150 - 1400 deg F to combine hydrogen with O2 to form water.
Powered from B-53 and B-61
What are source of H2 generation in RB?
- Radiolytic decomposition of water
- Metal-to-water reaction (Zirc-water rx)
- Reactor coolant water
- Corrosion of aluminum
- Zinc base paint
What are TS requirements for RB leak detector?
TS 3.4.15 for RCS leakage detection instrumentation One RB sump monitor and One RB atmosphere monitor (gaseous or particulate) are required in modes 1 - 4.
What ES channels will isolate the RB leak detector?
ES 3 or 4.