Random Shit Flashcards
Who’s brings 1st saw to cellar fire in taxpayer?
2nd due roof also throws up own portable
Who is responsible to shut down utilities at cellar/store fires?
1st due inside team
Does 1st due roof bring saw at a store / cockloft fire?
Yes 2nd due will take a second saw
1st due LCC
Taxpayer- store/cockloft fire
Join FE team, if fire extends to cockloft proceed to the roof to assist roof ff
2nd due OV
Taxpayer-store/cockloft fire
Team up with 1st due to VEIS rear
Proceed to roof or other position as directed
2nd due LCC
Taxpayer - store/cockloft fire
Position TL for most effective position
Join FE team if not directed otherwise
Where was core construction used extensively in HROB?
Buildings built after 1968
HVAC systems shall be put into non-circulating mode but?
Open all outside dampers
Closing all mixing dampers
Opening all exhaust dampers
Manuel fire pumps are required in buildings over _______ ft for 1968 building code and ______ft for 1938 building code
300ft
250ft
A loss of 25% can be expected in an _______ riser and 45% in a _________ riser
8”- eng 258
6”- eng 456
10-76 transmitted when?
Report of fire confirmed
Any stretching and operating of one hoseline will necessitate the use of “All Hands”
Transmit a 10-76 second alarm when?
Any visible fire or smoke emanation through exterior of skin of np building or when a serious fire is verified
5th Ladder at a 10-76?
FAST Unit
4th ladder at 10-76?
Operate upper floors, search of attack stairway
Not undertake roof ops until ordered by IC
Primary of top five floors
Logical assignment after roof ops would be upper floors of elevator bank serving fire floor
3rd ladder at HROB
Upon arrival at floe below fire, obtain info from 1st or 2nd due or by rapid survey of this floor
Determine number of stairs serving fire floor and floor above
Proceed to floor above fire via stairway other than attack stairway
Determine best stairway to use for evacuation and advise ICP
Remove all occupants from attack stairway for a reasonable distance above fire floor
Difficulty encountered clearing attack stairway notify 1st due ladder or fire branch director or fire sector supervisor
In HROB who selects stairway for attack of fire?
1st due ladder and stairway needs to have standpipe
Stack Effect is more noticeable in buildings over?
60ft
1st due and 2nd due LCC
TAXPAYERS - Cellar Fire
If tower ladder position in front of building
If building covers more than one street additional TL needed to cover other streets
Aerial place away from fire building
Join FE team if not directed otherwise
When is Possitive stack effect likely?
When outside air temp decreases in relation to inside air temp
Negative stack effect is greatest when?
Outside air temp is above 90 degrees
T/F 2nd due ladder at HROB can use same elevator as first due
True
What is 2nd hose line at HROB used for?
Reinforce first line
Protect position of first line
Protect search and evacuation of the fire floor
Contain and confine spread of fire or prevent fire from wrapping around the core and endangering operation of first line
In PD’s, windows with sills that are approximately chest height may require a drop of how many feet to floor level?
5-6 feet
1st hose line in PD cellar fire shall be stretched where?
Entrance that provides the quickest access to cellar in order to extinguish the fire
Reposting of 1st hose line to a secondary entrance can be ordered by who?
Acting chief officer or chief officer
If fire is on first floor of PD’s, what should we do before placing hose line in service?
Ensure fire did not start in cellar before committing first HL
For exposure protection, how should hose line be operated at a PD?
Sweep stream across face of building starting at the top so water will cascade down the exterior
When can 1st due LCC (aerial) enter dwelling to assist company with searches and overhauling?
Once fire has been controlled and members inside the building are not in immediate danger that would require use of aerial
What is preferable for Roof access at a peaked roof PD?
Tower Ladder
Aerial Ladder
Portable Ladder
What is size of roof opening at a peaked roof PD?
2’ x 3’
What size hooks should be brought to Peaked roof PD.
6’ 10’(Queen Anne) to push down ceilings
What is access to roof for flat roof PD?
Aerial
Tower ladder
Portable
At a flat roof PD, If rescue is needed who helps?
LCC
In older type PD’s, how long until collapse occurs?
Generally estimated to be an hour
No ceiling protection and structural components are exposed, failure can occur in 20mins
PD’s constructed of LW materials will collapse in_________ when fire extends to structural components
5-10 mins
Areas unsupported by columns with spans greater than how many feet, will generally indicate LW construction present?
Greater than 25’
Most important factor to safe operation at PD’s with LW construction is what?
Identifying the presence of LW construction
NYC Building code requires LW constructed spaces between the ceiling and floor above or the ceiling and roof above to be divided into approximately equal areas of?
500sq ft or less unless building equipped with automatic sprinklers
How far to nails in gusset plates penetrate into the wood truss?
1/4” to 1/2”
Laminated wood ibeams may span lengths over_______ft.
60 ft
What is the primary emphasis for a fire in a LW building under construction?
Exterior attack unless minor or confined to a small area
Presence of smok pushing at the floor line on the outside of building is indication of what?
Fire in a truss loft
First arriving ladder company shall do what immediately upon arrival if A fire is in a PD suspected of being LW construction?
Make inspection hole in ceiling from a safe area in order to determine type of support system present
What engine companies should be used to seal off the ends of street at a collapse?
Two of the SECOND ALARM ENGINES
Who ensures supply line is stretched to the first TL at a collapse?
2nd arriving engine
Who can perform CFR-D duties at collapse?
2nd arriving if necessary
Third and subsequent arriving engines
What engine companies can assist with the removal of lightly buried victims?
3rd and subsequent arriving engines
Which ladder company shuts utilities down at a collapse?
Second arriving ladder