Random Shit Flashcards
Vertex flue
300mm from insulation
Riddor report time
14 Days
Carport is open on… side
2
Smoke pellet requirements
5m3 / 30 seconds
Electric spacings
150mm main services
25mm cables/ switches
Working pressure @ meter
21 mbar +2 -2.5
Terminal guard, gap
50mm from any point of terminal
Timed purge
<0.02m3
Source of ignition purge
> 0.02m3
Smelly additive
Tetrahydrothiophene
Service side is …
Upstream
Installation side is …
Downstream
Heat shield air gap
5mm
Fire spigot
15 mm- no closer than 50mm to wall
Terminal opening size (2)
6-16mm
Or > 170mm
Flue damper needs to be
Mechanically fixed/ removed
Starter blocks needed on pre cast
3
Cover blocks required pre cast
1
Open flue minimum before bend
600mm
Hearth size requirements (4)
Back of fire to hearth 300mm
Min from burner 150mm
Min 50mm thick, 12mm non combustible
50mm upstand
Single wall orientation
W bottom - M top (guttering)
Twin wall orientation
M bottom - W top
Inspection hatch size
300 x 300mm
Inspection hatch distance
1.5m max from any joints/ COD