Hearing protection is used when the work environment noise level exceeds
85dhA over an 8 hour period
MUTCD stand for
Manual of uniform Traffic Control Devices
Flammable class 1 flashpoint below?
Class 2? Class 3?
1: flammable, Below 100 F (37.8C) ie gasoline
2: combustion liquids, flashpoint above 100 F (37.8) ie diesel
3: jet fuel & motor oil
Large cylinders should be checked for?
Safe design
If an atmosphere is tested and found to be combustible, what can be done to create a non combustible atmosphere?
Use a non-flammable gas to create an inert atmosphere
What sort of nomenclature would usually be found on stakes and markers?
Pipeline stationing, direction changes, additional ditch depth, changes in pipe wall thickness
An action to eliminate the cause of a detected nonconformity or other undesirable situation is a
Corrective action
Which of the following terms indicating a resectable condition? A)defect B) imperfections c)indication d) all the above
A) defect
Plowing, discing or dragging the RoW shall be done
To dress the land and REMEDIATE excessively compact areas
In cathodic protection the ___ corrodes sacrificially to protect the pipe
Anode
What is the maximum open ditch in daylight hours
2 miles or less during daylight and 1/2 mile at night
When stringing pipe what does the inspector responsible for?
Pipe handling and placement
What type of test do you perform with hydro-test
Spike, strength and leak
How do you determine what PPE is required
Jsa
When bends are made in longitudinal
At or near the neutral axis of the bend
Unknown line strike during excavation, who does the inspector report to?
One call and utility owner
What does the term grubbing mean?
Removal and disposal of all roots and stumps
What do you find in a line list agreement
All measures and agreements made my land agents and landowners / tenants on how to minimize disruption concerns land owners and tenants and damage to surrounding properties
Compaction of a residential drive
98%
Ensure ditch breakers are installed where
At the edge of wetlands
Wall thinking do not be below
Minimum Wall thickness
White flag
Proposed excavation
Yellow flag
Gas and oil petroleum
Depth of trench is specified
In pre-job documentation
How far away does a ladder have to be from a 45KV power line?
3m
Excavation, trenching and boring safety. Egress / access of ?
Wishing 25 ft
Who is responsible for JSA
Contractor
Each transmission line must be installed with at least ___ inches or clearance from any other underground structure not associated with transmission line
12