QUIZ 2 FRESH PROPERTIES Flashcards
Workability
Contains two main components
Property determining the effort required to mix, place, compact, and finish concrete.
Consistency and Cohesiveness
Workability Factors
Water, time, temperature, admixture type, aggregate, concrete temp
Slump Test
- 3 layers of concrete individually placed and compacted in a steel cone
- Cone is removed, and downward movement of concrete measured
- Cone must retain shape to be valid
- invalid if collapses
- Normal slump 80 to 120 mm
Segregation, how to avoid
- Separation of aggregate from mortar
- Avoid high slump
- Need good placing techniques to avoid segregation, place as close to finishing position as possible
Inadequate consolidation leads too…
honeycombing,rock pockets
Bleeding Concrete
- bleed water accumulates on surface due to gravity forces
- not an issue but need to wait for bleed
Curing Concrete
Maintenace of concrete after placing and finishing to obtain a satisfactory moisture content and temperature in a given time
- time, temp, moisture
Curing methods
Fog spray, continuous moist cure, curing compounds
Effects of curing on strength Development…. graph
Slide 31 Lcture 7
Chemical Admixtures
Air Entrainer, Water Reducer, Retardant, Accelerating
Air Entrainer
- causes very small bubbles
- provide durability to freeze/thaw
- improve workability
- lowers compressive strength
Water Reducer
Increase workability by not decreasing strength