Which robot application type is the most common one?
Handling
Which part of a robot system is the most costly?
System, such as program and installation
Which robot supplier has most installations worldwide?
Fanuc
What is particular for a arc welding robot application?
Many times the robot has a manipulator to orient the product
What is particular about the painting robot?
It has a longer arm to reach but is not so rigid
What does IFR mean by “Democratizing” robotics?
Low-cost robotics opens up new customer segments
What does IFR mean with by the trending human-robot collaboration?
Ease of use is a driver for the use of cobots
What technology is involved in a robot simulation system?
Mathematically detect clearances and collisions (+more)
What is enabled through a PLM system-based robot simulation system?
Several persons can work on the same data set in realtime
Who are the two major robot simulation providers in the world?
Siemens and Dassault Systémes
What does Object-oriented programming use?
Object-oriented programming uses features from the product to program the robot
A TagGroup contains what information?
Coordinate location objects
In Teach-in programming use what?
The robot is used physically to do the programming
Professor Bolmsjö states two classifications of programming. Which is the correct statement?
Where relates to on-line and off-line programming. How is related to abstraction level.
Which three main phases are involved in the design of a robot system according to Professor Bolmsjö?
Pre-study > Procurement > Implementation
Virtual Commissioning is…
The process of using simulation technology to validate PLC logic before making changes to the actual plant
The reason for using Virtual Commissioning is…
to unlike the traditional approach enable concurrent engineering in the commissioning of your plant
Why did Airbus decide to use Virtual Commissioning for the building of all their new factories?
It is a way to make sure their Tier-1 suppliers test all their logic programming on the equipment to be deployed in the Airbus factories.