Quiz - 1 Flashcards
Name at least 3 phases of project delivery:
Programming
Schematic Design
Development
2 parts that the construction documents are divided into:
Construction Drawings
Specifications
What happens in the programming phase:
They figure out the design plans
2 consultants an architect usually works with:
Structural Engineer
Electrical Engineer
Is the architects greater responsibility to the owner or the G.C:
The owner
In project delivery what does DD stand for:
Design Development
What does MEP stand for:
Mechanical
Electrical
Plumbing
Which member of the construction team is responsible for preparing the specifications:
Architect
In project delivery what is the G.C’s responsibility:
To hire subs and make sure the work gets done correctly
Name 5 typical stakeholders in most building construction projects:
Owner Architect Engineer G.C Sub Contractors