To get air bubbles out of already laid concrete it is best to __________.
Vibrate
How close can your string line be to the cinder block wall you are building?
1/16 inch
What is the height from the first floor to the landing?
61 1/2 inches
What is the screw spacing for 1/2 inch gypsum on a non-load-bearing wood stud wall?
12 inches
The “Total Run” of a stairway is ___________.
The sum of the tread run
How close to a plastic or canvas tarpaulin can you place a portable heat source?
10 feet
A bank on an excavation site has a 3 to 1; How many inches per foot will the bank rise
4 inches per foot
What is the minimum footing width on solid rock?
12 inches
Why are cabinets scribed to the wall?
To make cabinets flush to the wall and eliminate gaps
Osha requires 2 guards (top 2 bottom) on which of the following saws?
Portable Circular Saw
Curing in concrete continues until the relative humidity in the concrete drops below _________ Percent.
80
What types of door offers the best fire protection?
Solid Core
Which is the best method to compact sand and gravel?
Puddling and Vibration
What is the maximum temperature allowed from a constant heat source behind drywall?
125
What type of gypsum board is recommended for a base for an interior veneer plaster finish?
Blue Board
Using a superplasticizer admixture to increase the workability of concrete has a short-lived time of?
30-60 minutes
The “Total Run” of a stairway is ________.
Sum of the thread run
What is the actual size of 2x4 surfaced dry piece of framing lumber?
1-1/2 by 3-1/2
What is the minimum width perpendicular to the length of a k-series for a steel bearing plate anchored in a concrete or masonry wall?
6 inches
Where is a roof most likely to leak?
Valley
What is the height of the foyer in inches
203 inches
Asphalt Shingles installed in warmer climates with a slope of 4 in 12 or more should have a minimum underlayment of:
1 layer of #15
The proper compaction of soil is best achieved by:
Using the right amount of moisture
How much siding is needed on the rear of the house?
1,087 sq ft
Allow 10 % for starter and waste. Slope multiplier factor 1.3.
17
If the blueprint does not disclose exterior doors rough opening, then the standard practice would be to frame the width________.
2 inches