Responsibilities of a craftsman at a FMA
Perform all maintenance IAW the FWP.
If the guidance is incorrect/incomplete/unclear, stop and seek clarification from the work center or shift supervisor.
Ensure qa forms are completed correctly
Sign print date on all qa forms
Ensure TMDE is used properly
Fundamental Rule for all maintenance performed by a QA craftsman
Technical specifications must be met at all times
C
Cleanliness inspection
Q
Critical quality control point
V
Verification by craftsman
I
QAI/NDT
S
Ships force
You are performing a controlled job and notice the technical specifications for performing the work cannot be followed. What action do you take?
Stop work and notify the LPO/WCS
When is a revision required on a CWP
- Scope of work changes
- Boundary of work changes
- Changes in test requirements unless authorized by a DFS
- Any change in material requirements which result in a change in testing requirements
What do you record when using TMDE in the in-process control documentation
Type of tool
Range
Serial number
Calibration
Before using a calibrated tool, what do you need to do?
Verify calibration is within date
Serial number
Range falls within 20-90% in direction of torque
Who can make non-technical pen and ink changes to a FWP
Lpo/lws supervisor or division officer is responsible for the affective step in FWP
Maintenance procedures may be fully usable in their existing form. The minimum requirements to perform work are
Valid MP
Permission to conduct work
What FME cannot be used
Tape
What are two min qualifications to do work
Qas, craftsman