Q&A2 Flashcards
Is TOI Next a process improvement for specification? Execution? Environment?
- strategy
- metrics
- tools
- environment
In test strategy procedd, , which is predetermined set of test conditions quality standard?
ISO 25000 replacing ISO 9126
What model, When test codes are all
completed when phase activities should ge completed before the bextnphase starts
Sequential:
V-model
Waterfall
W-model
After developing the test tool, what shall be done next?
Test the tool
In Defining and Using Test Metrics
, which testing metrics category measures the DEFECT DENSITY
PRODUCT METRICS:
extent if testing the product
and defect density
What is the Key characteristic of audits
- Lead auditor
- Evidence
- Documented results
What is the Key characteristic of mgmt reviews
- Conducted by:
Managers
Stakeholders - Check consistency with and deviations from
Plans - Check adequacy of mgmt procedures
- Assess project risks
- Evaluate impact of actions and ways to measure these impacts
- Produce list of action items
Open Source tool, what is the key characteristic ?
Can make chg and changes need to ve available to external users follow the same term applied as received
Handed over defects fixed and assigned report to maintenance: what sdlc process?
Test Closure
Test tool /lifecycle
Acquisition, Support and Maintenance, Evolution, Retirement____
IDEAL , what step where test process improvement is fully deployed?
ACTING to implement improvement: Training Mentoring Piloting of processes Full deployment
Which defect information needs to support process improvement initiatives which the largest number of defects are introduced to enable targeted improvements to reduce the total number of defects?
Pareto analysis
Who is generally responsible for managing the reported defects for a given project?
Cross functional team
What are the existing standards and docs tongelp
Test mgr determine which info to gather defect reporting?
Orthogonal Defect Classification
Standards
ISO 25000 replced ISO 9126
IEEE829
IEEE 1044
Testing Tools capabilities should test mgr consider
Analysis
Design
Data and test selection
Execution Evaluation
What should test mgr hire?
Proper MIX of skills
What Test Mgr should maintain in a high pressure fast paced environment?
Maintain Set of skills
What shld test mgr do when hiring? What skills if inherited a team with tech skills in auto tool, scripting tests?
mix of strong testing skills and domain skills
What shld test mgr do?
Team cross-train each other
Requirement-based technique
Cause-effect graphing
When Sys performance is high risk, what shall be done?
Performance testing shall be run during unit and integration testing.
If serious defect found in design specs
Addl static testing reviews of design specs should be done
Risk based test strategy, what is used to guide in mitigating activities to reduce the product risk to gelp in contingency planning?
Risk Analysis
Reactive strategy (dynamic testing)
Exploratory testing - test charters and tools
Risk Assessment - used for quality categorization
ISO 9136 replaced by ISO25000
If test execution is shortened due to a delay in starting testing
Risk analysis and the plan must be revised
Whom should test mgr work with to coordinate delivery of test objects content and dates of each test release
Development Mgrs
Whom should test mgr work with to coordinate delivery of test objects content and dates of each test release
Development Mgrs
Whom should test mgr work with to coordinate delivery processes and mechanism , BUILD VERSION
Config Mgmt Release Mgmt Chg Mgmt
After developing a custom-tool, what should be done next?
Test the tool
Before releasing the tool for other project,
impt to review its purpose, aim, ROI / benefits, possible downsides
Risk analysis is done when?
Major milestones of project
If serious defects were found in production 3 months after release, what lesson should had been done?
Cross-section of user representatives should participate in the ridk analysis sessions
Defects logged against the test conditions but lots of test cases are still not yet executed? What is not done:
test tool is not updated after completion of test case and status do not reflect the report,
- When larger defects in the code module were found after review, what should be done?
Static Analysis
Inspections - discovery and removal of defects
Requirements passed/failed”, what test type?
Reactive Testing/Exploratory Testing
Model-based
Operational profiling
- Lots of testing completion/cycle: (spiral, incremental/iterative, agil, v, waterfall)
Sequential: V-Model
defect mngt or committee meet to determine if valid defect, to be fixed ir deferred.
Defect Triage
Test then code
STEP
REQUIREMENTS-BASED