PSDC CT2 Flashcards

1
Q

Precast planks have the advantages of smooth soffit finish, no _________ and rapid
assembly at site

A

formwork

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Most precast concrete columns are_____________ conventionally.

A

Reinforced

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

The usage of L-shapes and inverted tee beams allow lower overall____________ than resting floor
and roof units on top of rectangular beams

A

height

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

The hollow-core floor slab, the voids are primarily a means of reducing______________ and reducing
concrete and steel quantities.

A

Weight

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Which of the following is NOT a specific advantage of precasting?

A

Reduction of creep
Better quality control
High cost of setting up the plant

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Double tees and single tees are commonly cast with a rough surface on top because:

A

Better bondage for concrete topping

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Which of the following is FALSE about precast concrete wall panels:

A

Panels with openings can be prestressed.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Double-tee slab is highly functional because:

A

it meets structural requirements
it provides a flat useful surface
All of the options

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

The in-situ topping up of concrete of precast planks may vary between _________

A

50 to 200 mm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Joint may be accomplished by ____, bolting or post-tensioning, or by cast-in- place
concrete connections.

A

welding

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

. Circular precast columns are commonly used in construction projects.

A

false

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Precast segments are suitable for composite construction and may be combined with castin-place concrete to act in composite action

A

TRUE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Prestressed beams ________

A

should not be lifted upside down.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

It is not safe to stand directly _______ the tendons when one way stressing work is in
progress

A

Below

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

A tower crane is chosen for erecting precast prestressed components_____

A

whenever the lift heights are extreme

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Which of the following is NOT the properties of connections between precast members:
Accommodate volume changes due to creep, shrinkage and temperature in the member, its
support and the connection assembly itself.

A

Transmit bearing, shear, moment, axial tension and axial compression as required by the
design.

17
Q

The sequence of precast prestressed concrete components’ erection procedure are
rigging

A

planning

18
Q

Temporary bracing is necessary to______precast members during the erection until final
connections can be made.

A

Support

19
Q

. The erection procedure should include plans to maintain the___________ end equilibrium of the
structure during construction as well as after the structure is completed.

A

stability

20
Q

Bearings are mostly used in prestressed concrete bridge construction to allow for the
rotations at the supports that will accompany _______of the loaded structure, in the case of
longer spans.

A

Deflection

21
Q

. For preparation during the_____________any turning or rotation of the precast concrete until
should be done while it is on the ground or truck.

A

erection

22
Q

The joints occur in buildings between precast concrete and cast-in-place concrete, or
between precast units, are usually caulked for_____________

A

watertightness

23
Q

. It is necessary to move a large precast member some distance with one or more crane, the
ground over which the cranes move must be very level and____________

A

firm.

24
Q

When hand signals are used during the erection of precast units, it must ensure that the
signals are standardized and understood by all

A

operators and riggers.

25
Q

The T-shaped or inverted L shaped beam which are subjected to eccentric loading. causes
structural instability during the assembly of structure.

A

FALSE

26
Q

During the rigging process, prestressed members can be lifted by their centre only. and they
cannot be lifted or stored upside down.

A

true