PROJECT PHASES Flashcards

1
Q

defines the wants and requirements

A

Project definition phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

comes from the defined spaces of the project definition phase.

A

Schematic design phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

upon approval of the client (input and revision). Probably construction cost. Detailed version of what the client wants. Almost last part. Almost perfect idea. Finalize the drawing and documents.

A

Design development phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

complete documents: architectural, structural, electrical, mechanical, plumbing and sanitary, electronics and communication. Architect service is almost complete (90%)

A

Contract document phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

bidding: for big project delivery. Negotiation: if they have their own contractor.

A

Bidding or negotiation phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

for big project delivery

A

bidding

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

: if they have their own contractor.

A

Negotiation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Architects conduct periodic visit.

A

Construction phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Pre-Design services

A

(SPP Doc. 201)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Regular Design Services

A

(SPP Doc. 202)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Specialized Architectural Services

A

(SPP Doc. 203)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q
  • Not regular service of architects. Needs allied professionals (i.e interior designer, landscape architects) as consultants
A

Specialized Architectural Services

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Full-Time Construction Supervision Services

A

(SPP Doc. 204-A)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Construction Management Services

A

(SPP Doc. 204-B)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q
  • Controls time and cost of construction. Civil liabilities lie under the architect of record and architectural manager.
A

Construction Management Services

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q
  1. Post-Construction Services
A

(SPP Doc. 205)

17
Q
  1. Comprehensive Architectural Services
A

(SPP Doc. 206)

18
Q
  • Pre-design to post-construction. Architect is involved. Each has different service fee with different methods of compensation, different service agreement.
A
  1. Comprehensive Architectural Services
19
Q
  1. Design-Build Services
A

(SPP Doc. 207)

20
Q

7%. The bigger the maximum cost of client, the bigger the architects’ fee. Flexible.

A
  1. Design Build by Administration
21
Q

10%. Same as maximum cost conditions but the whole principle is broken. Savings from estimate is split between architect and client (because the architect made the effort to save expenses).

A
  1. Design Build by Guaranteed Maximum Cost
22
Q

Architect’s estimate is ________ accurate

A

85-89%

23
Q
  • First put into the organization. Legal competition submitted to consultant and judges. Needs to choose one winner who is not allowed to adopt the design to another project. There will be prize for the winner.
A
  1. Architectural Design Competition
24
Q
  1. Architectural Design Competition
A

(SPP Doc. 208)

25
Q
  1. Professional Architectural Consulting Services
A

(SPP Doc. 209)

26
Q

DECISION TO BUILD by the Owner

A

o Purpose
o Size
o Cost
o Location

27
Q

DESIGN CONCEPT by the Architect-Engineer Consultants

A

o Space
o Function
o Stability
o Environment
o Aesthetics

28
Q

DELIVERY SYSTEM by the Contractor

A

o Men
o Material
o Equipment

29
Q

 Cost and Finance is covered by:

A

by project manager

30
Q

Time Control Viability

A

by construction manager

31
Q

Quality

A

full-time construction supervisor

32
Q

Control

A

full-time construction supervisor

33
Q

Basis of RA 9266 and SPP

A

CODE OF ETHICS