Program Measures Training Workbook (2019) Flashcards
Steam Trap Testing - Eligibility
Building is eligible for testing every 3 years. Building ownership does not impact this.
Steam Trap Testing - Requirements
Requires an approved tester. Testing must take place between September 15 and March 15.
Steam Trap Testing - Pre-Approval
Pre-Approval required for every project
Steam Trap Testing - Pre-Inspection
We must be on site for all steam trap testing
Steam Trap Testing - Rebate documents and requirements
Steam Trap Survey and Tally Sheet. Contractor must apply to replace minimum of 50% of the approved failed open traps to qualify for testing rebate
Steam Trap Replacement - Eligibility
Following testing- we can approve the replacement of failed open traps in sequential years until all failed open traps are replaced. This quantity must not exceed the 20% AGU of the building. New testing can occur every 3 years.
Steam Trap Replacement - Requirements
Must replace failed open traps. Failed close traps are not covered by the program.
Steam Trap Replacement - Pre-Approval
Pre-Approval is required for every project.
Steam Trap Replacement - Post-Inspection
All projects over $2500.
Steam Trap Replacement - Documentation
Survey must be submitted before the work begins
Steam Pipe Insulation - Eligibility
Must be bare pipe prior to installation. Must be on steam boilers.
Steam Pipe Insulation - Requirements
Installed Insulation must be greater than or equal to an R3
Steam Pipe Insulation - Pre-Approval
Capped at 250 linear feet.
Steam Pipe Insulation - Pre-Inspection
All projects exceeding $2500.
Steam Pipe Insulation - Post-Inspection
All projects exceeding $2500.
Tank Insulation - Eligibility
Must be uninsulated prior to installation
Tank Insulation - Requirements
Installed Insulation must be greater than or equal to an R6. Insulation must be installed on the top and sides of the tank.
Tank Insulation - Pre-Approval
All projects exceeding $2500.
Tank Insulation - Pre-Inspection
All projects exceeding $2500.