Preventative maintenance Flashcards
____ is a calculated approximation. however before you can do any estimating you must have a detailed plan of what is required. a cost estimate and time estimate are typically included in the overall project
an estimate
a _____ is a calculated approximation using experience or suggesting expected prices. it is an estimate describing expected costs for the item you are working with
cost estimate
a ____is a calculated approximation of how long a job will take to complete.todays computer maintenance program keep track of how long the job took previously or have a data entry for the expected time allotment.
time estimate
sensors for temperature and vibration permanently mounted on a machine can provide a ______ the benchmark established at the beginning serves as a ____ as to whether the performance is deteriorating or not.
continuous monitoring system
reference
_____, also known as _____, is a method of repairing machinery once it no longer functions properly.
reactive maintenance
breakdown maintenance
you may not run into the term ____ in the industrial plant, as there are too many variables
flat rate
_____ is the activity of buying something.
purchasing
a _____ is usually a guaranteed purchase price.
price quote
a _____ is a price quote which means you pay the exact amount. a firm price quote is time bound often for 30 days.
firm quote
when planning a repair, a new installation or replacing a machine ask for _____, whichmeans price and delivery.
delivery means the length of time neccessary for the parts to arrive
p&d
once you know the part you want make a requisition in the form of a paper copy or computer requisition.
there is usually a place for the______ in the requisition
purchase order (PO)number
the supplier begins to fill the order upon receiving the ____.
a purchase order is a legal ______
PO
offer to purchase.
if the supplier does not have the part in stock, they order it from their supplier and the part is then considered to be on _____.
back order
the _____ explain what is inside the package. it also makes reference to the PO
delivery slips or packing slip
the company sending the parts also sends a request for payment, which is called an ______
invoice
the purchaser needs to ensure the parts are not only suitably priced with a reasonable delivery date, but they need to meet the specifications of the machine on which you will be working. when you buy parts from international sources, make sure they are approved by the ______
canadain standards association (CSA- approved).
the three types of sourcing are ____.
sole, multiple and single
Sole sourcing implies that only one supplier is available because of ______
patents, technical specifications, raw material and location.
_____ is the use of more than one supplier for an item. the potential advantages of multiple sourcing are the competition results in lower prices and better service and there be a continuity of supply.
Multiple sourcing
______is a planned decision by the organization to select one supplier for an item when several sources are available. it is intended to produce a long-term partnership.
single sourcing
there are three options of maintenance programs to identify and each option may or may not be correct for your industry. these three types are:
types are:
preventive
predictive
reactive
the primary purpose of preventive maintenance is to _____
the goals of preventive maintenance are to improve:___
increase production time between overhauls.
machinery uptime and production
maintenance labour productivity
product qulity
safety
spare parts
identify equipment that is crucial to production or the requires a high level of maintenance activity. usually ____% of the equipment requires ____% of the attention.
20%
80%
predictive maintenance is a program of _____ to predict the wear rate and expected repair schedule for machinery
monitoring, measuring and analyzing results
the difference between preventive and predictive maintenance is____
when maintenance is performed
the estimated time to do the job may become more realistic once you have some____
experience with the machinery.
the machine may be performing over its design capacity
machine overload
a ______ (CMMS) is a software program that maintains and manages a data base of information about an organizations maintenance operation.
computerized maintenance management system
You need to do a ______ to the impact on the safety of the machine and the product if the work is not done and see what the potential costs will be if the work is done or not
impact analysis
. take the failed parts and examine them to determine the cause of failure. inspect the parts to see if there has been some overload, excess wear or design flaw
Failure analysis
_____ you must look at why the failure occurred. if you can determine the root cuase of failure, take steps to improve the machines longevity so that the problem does not return
Root cause
Free on board (FOB)
free on board or freight on board
planning shutdown jobs
bar charts and arrow diagrams can be used for scheduling and planning.
why is Cost coding necessary
in maintenance in order to determine costs associated with a particular machine, area or plant
planning for machine dependability
the inspection of a machine should be recorded on an inspection sheet, not on a checklist. checklists have the connotation of using a checkmark. an inspection should be developed in such a way that no question on the inspection sheet can be checked or answered with yes, no, ok, good or bad
_______ is a necessary form of problem solving when a machine or process does not operate normally or when a component fails
Analytical troubleshooting
diagnose and correct
to diagnose and resolve problems, use a process called cause and correct
what is Root cause
the true contributor to a problem