Exec summary:
Big change since csr - exhaust scope change
To hit power and sound
Exec summary - timing
We are on track for c-build 6/26
Spec are finalizing and designs progressing
Program risk summary number 1
- Risk for power target w harrier engine
Prof risk summary design
On track need to hustle for fuel
Connected
Chin fairing
This summer. Fuel tko 9/25.
KPC slider ready?
Fuel fill looks like 45 seconds are very possible as long as we can source the right components.
Scope of vehicle Since csr follow up
Major change is the muffler direction
Additionally finalized saddlebag spec based on our architectural capabilities
Scope risks / details
Target and focus
Key target to hit 135 hp
Focus on optimizing power and sound
Key risks connected
Packaging the added modules challenging
Design refinement in process
Driving new overflow bottle
Focus and hard work
Engine sub system - cooling
New overflow bottle
On track
Engine
Yellow - top risk from vehicle is hitting power and sound.
Not forgetting EU5 emissions - looking good with SAI
Intake
Volume flow optimization
Investigating every design level we have
Updated for sai
Exhaust
Big win to reuse current muffler
Scope change focuses resources where we have the best chance to hit targets
Electrical slide
Resources have been limited
Team needs to double down this summer to lock in designs
Body
Green - focus on chin gaining area
Fuel
Yellow - nnb approval for vendor
On track for 14.5L volume
On track for 60s fill time
Behind schedule - but anticipate Bering able to catch up