Pre Plan Flashcards
A hazard that rise from the operation or process that I peculiar to the individual occupancy.(ex; pinging ,welding,dust)
Special hazard
Establish a _______month cycle for updating all pre-fire plans on file.
6 months
An actual on scene visit/surveys shall be done and identified on all identified targets during the months of___________and____________
September and October
Phone surveys to update keyhole ear info and any other quick fix changes shall be made
During the month of _________and_________
March and April
NFPA quick ground fire calculation
Fire flow = (length x width )3
If other floors in the building are not yet involved but being threatened by possible extension of the fire they should be considered an exposure and _______% of the required fire flow should be added for exposure protection
25 %
Ex. (50 X 30) =500gpm3 exposure 500gpm x(25% x2) =250 gpm
Total fire flow required =750 gpm
Facility or process which could produce or stimulate a fire that could cause a large loss of life or property(ex; lumberyard,bulk oil storage,hospitals,restaurants,schools, jiffy mart, daycare.
Target hazard