Which of the following have helped reduce stratospheric ozone depletion? (choose two)
Group of answer choices
Not using CFC-based refrigerants in new equipment
Installing halon-based fire suppression systems
Implementing a phase-out of CFC-based refrigerants in existing equipment
Replacing HFC-based refrigerants with HCFC-based refrigerants in existing equipment
Not using CFC-based refrigerants in new equipment
Implementing a phase-out of CFC-based refrigerants in existing equipment
What is the primary difference between LEED for Existing Buildings: Operations & Maintenance and the other LEED rating systems?
Group of answer choices
Can be applied to only part of a building
Required a LEED AP to be on the building maintenance staff
Measures building performance over a period of time
Applies to any type of building project
Measures building performance over a period of time
What factor impacts the cost of earning LEED building certification?
Group of answer choices
The number of Full Time Equivalents (FTEs) that will occupy the finished building
The type of land the building was built on
The number of stories the building has
Square footage of the building
Square footage of the building
A project team is removing cisterns from a project design and will install a green roof instead. What project area would this change impact?
Group of answer choices
Stormwater Management
Heat Island Effect
Onsite Renewable Energy
Construction Waste Management
Stormwater Management
Heat Island Effect
Reducing the heat island effect by installing paving materials with a high SRI can have an impact on credits in what LEED categories? (choose 2)
Group of answer choices
Indoor Environmental Quality
Energy and Atmosphere
Materials and Resources
Sustainable Sites
Water Efficiency
Energy and Atmosphere
Sustainable Sites
Performance periods are part of which LEED rating system?
Group of answer choices
LEED for New Construction
LEED for Schools
LEED for Existing Buildings: Operations & Maintenance
LEED for Core & Shell
LEED for Existing Buildings: Operations & Maintenance
To be classified as fuel-efficient, a vehicle might meet which of the following standards?
Group of answer choices
ACEEE Green score
Green Seal score
Green Label
Green-e
ACEEE Green score
Potable water comes from what sources? (Choose two)
Group of answer choices
Cooling towers
Stormwater cisterns
Municipal water supply
Wells
Municipal water supply
Wells
What would a project team use to compare different product’s abilities to reject solar heat?
Group of answer choices
Emissivity
Perviousness
Solar Reflectance Index (SRI)
Albedo
Solar Reflectance Index (SRI)
At a minimum, a project team must successfully do which of the following to obtain LEED certification? (Choose two)
Group of answer choices
Gather documentation for 40 points of the 110 points available
Record all vendors used on the project
Hire a USGBC approved consultant
Gather documentation for the prerequisites
Gather documentation for 40 points of the 110 points available
Gather documentation for the prerequisites
What organization is responsible for qualifying sources of off-site renewable energy acceptable by LEED?
Group of answer choices
Green-e
ASHRAE
EPA
Center for Resource Solutions
Center for Resource Solutions
EPAct 1992 does NOT address what type of water consuming devices? (Select all that apply)
Group of answer choices
Cooling towers
Kitchen faucets
Boilers
Urinals
Cooling towers
Boilers
What strategy for improving water efficiency can be applied to all areas of water use: indoor, outdoor, and process water systems?
Group of answer choices
Using non-potable water
Reducing the number of fixtures
Decreasing flow rates
Increasing energy efficiency
Using non-potable water
What items would NOT be included in comingled recycling?
Group of answer choices
Cardboard
Stone
Plastic
Aluminum cans
Stone
Which of the following can reduce the volume of recycled materials sent to recycling facilities?
Group of answer choices
Purchasing materials with recycled content
Installing recycling chutes
Using comingled recycling
Reusing materials
Reusing materials
A project team submitted a Credit Interpretation Request (CIR) regarding a particular strategy to meet a credit’s requirements and was notified the strategy is acceptable. What is true regarding this scenario?
Group of answer choices
The project team will earn an Innovation in Design for an innovative approach due to the use of a different strategy to achieve the credit
The project has met the requirements for the credit and will achieve the credit
The project team will not be allowed to earn exemplary performance for the credit if exemplary performance is available
The project team must still demonstrate that the requirements for the credit were met
The project team must still demonstrate that the requirements for the credit were met
What is source reduction?
Group of answer choices
Decreasing the materials used for manufacturing products
Reducing the amount of stormwater runoff
Reducing energy use in a building
Reducing the heat island effect
Decreasing the materials used for manufacturing products
What are the attributes of native plants? (choose two)
Group of answer choices
Require less pruning
Require less sunlight
Require less pesticides
Require less fertilizer
Require less pesticides
Require less fertilizer
Why should a project team aim to achieve more points than are required for the target certification level?
Group of answer choices
In case extra points are achieved during the construction process, the next certification level can be achieved
To earn regional priority credits
Achieving more points will increase the energy efficiency of the building
If some credits are denied, the project may still earn enough points for the target certification
If some credits are denied, the project may still earn enough points for the target certification
What provides a volume certification path to enable owners to integrate LEED across the board as a standard feature of their design, construction and operations?
Group of answer choices
LEED for Neighborhood Development
Local green initiatives
USGBC Portfolio Program
LEED Online
USGBC Portfolio Program
How can the heat island effect on the roof of a building be reduced?
Group of answer choices
Painting the surface with dark colored coatings
Installing a cistern on the roof
Installing a green roof
Covering the roof with high VOC materials
Installing a green roof
A project team wishes to get a Credit Interpretation Request on a credit and prerequisite that are unrelated. What needs to happen?
Group of answer choices
Submit one CIR covering both the credit and prerequisite
Submit one CIR only, for the prerequisite
Submit one CIR only, for the credit
Submit two CIRs - one each for the credit and prerequisite
Submit two CIRs - one each for the credit and prerequisite
Which of the following statements are true?
Group of answer choices
Installing salvaged bicycle racks will help with community connectivity
Installing salvaged windows will help save energy
Using reflective materials on parking areas will help reduce the heat island effect
Using regional materials will help with construction waste management
Using reflective materials on parking areas will help reduce the heat island effect
Why does the USGBC outline rules on use of its trademarks and logos?
Group of answer choices
USGBC wants to make sure its message is spread accurately
USGBC wants to be able to charge a fee for logo use
USGBC wants customers to be directed to its website for clear information
USGBC wants to make sure it retains control over what is said about LEED
USGBC wants to make sure its message is spread accurately
The use of native plants on the project site can most assist projects teams with what other sustainable intents?
Using sustainable materials
Construction waste management
Protecting existing local habitat
Reducing stormwater quantity
Protecting existing local habitat
What standard applies to natural ventilation?
Group of answer choices
SMACNA
ASHRAE 62.1-2007
Green-e
ASHRAE 55-2004
ASHRAE 62.1-2007
A potential LEED project could be certified under either LEED for Existing Buildings or LEED for New Construction. How should the project team decide which rating system to use? (Choose two)
Group of answer choices
The project team must independently decide which rating system to use
Use the 40/60 rule
The rating system that could earn the most points should always be selected
The rating system that could earn the least points should always be selected
LEED for New Construction always has priority since it is the most popular rating system
The project team must independently decide which rating system to use
Use the 40/60 rule
What is true about a project that uses a Halon based fire suppression system?
Group of answer choices
The system must be installed to meet local fire codes
The system must have a leakage rate of 5% or less annually
The project would not meet the Minimum Program Requirements
The project could not earn LEED Platinum
The system must be installed to meet local fire codes
Which of the following are not required to be identified in writing to achieve an Innovation in Design (ID) credit for innovative performance?
Group of answer choices
Regional variations for the credit
The strategies used to meet the requirements
The intent of the proposed credit
The proposed requirements for compliance
Regional variations for the credit
Cabinetry made from walnut shells would help contribute toward earning what LEED credit?
Group of answer choices
Construction Waste Management
Regional Materials
Building Reuse
Recycled Materials
Recycled Materials
What tool would a project team use to set the project’s green design criteria?
Group of answer choices
Project schedule
Construction bids
LEED Score Card
Vision statement
LEED Score Card