PPP Flashcards

1
Q

Smoke proof tower

A

Enclosure allowing safe exit without encountering the hazard of rising smoke. Required by building codes in structures over a certain height

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Critical path

A

The path in a network diagram that requires the greatest amount of total time to complete the activities

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

On a tall building an entrance plaza is best protected from wind by

A

Relocating the entrance. Wind breaks don’t help because wind flows down the face creating a vortex

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

ANSI standards usually refer to what?

A

Accessibility

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Elevator car Ada requirements

A

36” wide door
54” high controls
Tactile control indicators

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Indoor design temps are based on what?

A

The range of conditions under which most people feel comfortable usually a little higher in hotter months

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Soul bearing values as it relates to programming

A

Unimportant as this is not part of a clients programming considerations as are financing, and operations

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Project overhead costs

A

All expenses attributable to a specific project that are not included in labor, materials, or equipment

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

During programming. Space needs should be expressed in terms of…

A

Square feet and floor area

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What is the main difference between an axial pattern versus a linear pattern

A

The focus of an axial pattern is its orientation to fixed objects at its ends whereas a linear pattern is generally open ended

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

A two dimensional form does not possess

A

Mass and or volume

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

How does touch relate to the perception of space

A

Even though touch can help understand texture and shape. It does not help define space

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

According to Ada what disabilities must be accommodated on accessible routes

A

All disabilities

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Epa identified sound pressure level max to protect against hearing loss

A

70 db

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Sound pressure level of normal conversation

A

40-60 db

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Organic feedstock

A

Organic matter that mold can eat. Mold cannot eat inorganic matter such as concrete

17
Q

Cpm dummy activity

A

Shown with a dotted line it represents an activity with zero duration. It is used to show that the next activity cannot be done without it but does not occur as a result or in sequence with the previous activities

18
Q

When in the architectural process is the best time to make changes

A

As soon as possible

19
Q

If there is a user group when should they be involved in the architectural process?

A

During programming

20
Q

Minimum clear path for a wheelchair is what? And what dimension can it be reduced to (for an opening)?

A

36”

32”

21
Q

What does SPL stand for

A

Sound pressure level. Usually represented in terms of decibels starting from 0 which is the threshold for human audibility

22
Q

What is the contractual relationship between the owner and the architects consultants

A

There is no contractual relationship. The consultant has a contract only with the architect and only looks to the architect for authorization and direction

23
Q

Explain the contractual relationship between the architect and consultant as it relates to the owner.

A

The contractual obligations the arch has to the owner should be the same as those that the consultant has to the architect

24
Q

A specific plan is usually developed by…

A

The city. Though in many cases it has specific owners and uses in mind

25
Q

What is secondary space?

A

Also called unassigned area it is area in a building not including the net area (area for assigned activities) including electrical rooms, shafts, circulation space, mechanical rooms, structure and walls

26
Q

Explain how a construction trailer must comply with Ada

A

It does not. Temporary facilities not accessible to the public and not for public use are not required to need Ada

27
Q

Exculpatory clause

A

part of an agreement which relieves one party from liability. It is a provision in a contract which is intended to protect one party from being sued for their wrongdoing or

28
Q

Who pays for mediation fees based on B101?

A

Both parties share mediation fees equally

29
Q

Gray water

A

Gently used water originating from in home water sources other than toilets and kitchen sinks

30
Q

U-Factor

A

A measure of heat transmission through a material or assembly. Low values indicate slow transmission and high values indicate rapid transmission

31
Q

Spot zoning

A

The designation of a parcel of land for a use classification different from that of the surrounding area to favor a particular owner. If the property was existing and made inconsistent from the surrounding area by a later law this would be a nonconforming use

32
Q

Discount fee

A

Also known as origination fee this is paid to the lender for the privilege of borrowing the loan. The borrower for example will only receive $9 per $10 borrowed but still pay back the $10

33
Q

Float

A

The difference in time duration between the critical path and any other path

34
Q

What activities can be delayed based on the critical path method

A

Any activity not on the critical path so long as float time is not exceeded. By definition activities on the critical path do not have float and therefore may not be delayed without impact to the project

35
Q

How many square feet in an acre?

A

43,560 sf

36
Q

When does the south wall of a building received the most solar radiation?

A

In the winter. Less sun is received by the east and west due to shorter days

37
Q

When do the east and west walls receive the most solar radiation.

A

In the summer. Due to the longer days these two walls receive more. The south receives less due to the higher sun altitude