PN 633 High Rise Firefighting Flashcards

1
Q

What is the flow rate of a dry rising main (DRM)?

A

1500 litres per minute

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What is the flow rate of a wet rising main?

A

1500 litres per minute for 45 minutes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Where should the bridgehead be located?

A

two floors below fire floor (unless pre-planning/specific design features allows for safe air)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Who can be a fire sector commander?

A

minimum CM

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What is the minimum staff required for starting a bridgehead?

A

The fire sector commander will take three firefighters to the bridgehead (two BA, one BAECO)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What equipment is required at the bridgehead?

A
x2 lengths 45 and carrying straps
Immediate Emergency Care (IEC) pack
x2 BA sets
Long line
Breaking in gear
BA board
Thermal imaging camera
F.I.R.E bag
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What is required within the F.I.R.E. bag?

A
Controlled dividing breeching
x3 hose identification sleeves
DeltaFire quick attack branch
Set of lift access keys
F.I.R.E. tool roll
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

When can the message “high-rise procedure implemented” be sent?

A

When:

  1. Location of bridgehead has been risk assessed
  2. access and egress has been secured and maintained to/from the bridgehead
  3. The bridgehead is established with x2 charged jets deployed
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Where should the initial BA team’s charged branch be supplied from?

A

Rising main outlet one floor below the fire

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

How many lengths should the second jet be?

A

at least one hose length longer than the first

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What are door marker tags/crayons used for?

A

Designate rooms/flats that have been cleared by crews

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What should a safety officer, working outside, check for?

A
  1. Falling debris
  2. Cordon maintenance for personnel, other agencies and public
  3. External fire spread
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What equipment can be used following communication difficulties at a high rise incident?

A

Radio repeaters, leaky feeders and hand held digital main scheme radios

How well did you know this?
1
Not at all
2
3
4
5
Perfectly