pmbok4 Flashcards

Learn the terms, and acronyms

1
Q

Terms and Acronyms

Accept / Acceptance

A

Begins with A: The act of formally receiving or acknowledging something and regarding it as being true, sound, suitable, or complete.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Terms and Acronyms

Acceptance Criteria

A

Begins with A: Those criteria, including performance requirements and essential conditions, which must be met before project deliverables are accepted.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Terms and Acronyms

Acquire Project Team [Process]

A

Begins with A: The process of obtaining the human resources needed to complete the project.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Terms and Acronyms

Activity

A

Begins with A: A component of work performed during the course of a project. See also schedule activity.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Terms and Acronyms

Activity Attributes [Output/Input]

A

Begins with A: Multiple attributes associated with each schedule activity that can be included within the activity list. Activity attributes include activity codes, predecessor activities, successor activities, logical relationships, leads and lags, resource requirements, unposed dates, constraints, and assumptions.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Terms and Acronyms

Activity Code

A

Begins with A: One or more numerical or text values that identify characteristics of the work or in some way categorize the schedule activity that allows filtering and ordering of activities within reports.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Terms and Acronyms

Activity Definition [Process]

A

Begins with A: The process of identifying the specific schedule activities that need to be performed to produce the various project deliverables.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Terms and Acronyms

Activity Description (AD)

A

Begins with A: A short phrase or label for each schedule activity used in conjunction with an activity identifier to differentiate that project schedule activity from other schedule activities. The activity description normally describes the scope of work of the schedule activity.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Terms and Acronyms

Activity Duration

A

Begins with A: The time in calendar units between the start and Finish of a schedule activity. See also actual durcrtiatt original duration, and remaining duration.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Terms and Acronyms

Activity Duration Estimating [Process]

A

Begins with A: The process of estimating the number of work periods that will be needed to complete individual schedule activities.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Terms and Acronyms

Activity Identifier

A

Begins with A: A short unique numeric or text identification assigned to each schedule activity to differentiate that project activity* from other activities. Typically unique within any one project schedule network diagram.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Terms and Acronyms

Activity, List [Output/Input]

A

Begins with A: A documented tabulation of schedule activities that shows the activity description, activity identifier, and a sufficiently detailed scope of work description so project team members understand what work is to be performed.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Terms and Acronyms

Activity-on-Arrovv (AOA)

A

Begins with A: See arrow diagramming method. Activity-on-Node (AON). See precedence diagramming method.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Terms and Acronyms

Activity Resource Estimating [Process]

A

Begins with A: The process of estimating the types and quantities of resources required to perform each schedule activity.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Terms and Acronyms

Activity Sequencing [Process]

A

Begins with A: The process of identifying and documenting dependencies among schedule activities.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Terms and Acronyms

Actual Cost (AC)

A

Begins with A: Total costs actually incurred and recorded in accomplishing work performed during a given time period for a schedule activity or work breakdown structure component. Actual cost can sometimes be direct labor hours alone, direct costs alone, or all costs including indirect costs. Also referred to as the actual cost of work performed (ACWP). See also earned value management and earned value technique.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

Terms and Acronyms

Actual Cost of Work Performed (ACWP)

A

Begins with A: See actual cost (AC).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

Terms and Acronyms

Actual Duration

A

Begins with A: The time in calendar units between the actual start date of the schedule activity and either the data date of the project schedule if the schedule activity is in progress or the actual finish date iFthe schedule activity is complete.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

Terms and Acronyms

Actual Finish Date (AF)

A

Begins with A: The point in time that work actually ended on a schedule activity. (Note: In some application areas, the schedule activity is considered finished” when work is “substantially complete.”)”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

Terms and Acronyms

Actual Start Date (AS)

A

Begins with A: The point in time that work actually started on a schedule activity.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

Terms and Acronyms

Analogous Estimating [Technique]

A

Begins with A: An estimating technique that uses the values of parameters, such as scope, cost, budget, and duration or measures of scale such as size, weight, and complexity from a previous, similar activity as the basis for estimating the same parameter or measure for a future activity. It is frequently used to estimate a parameter when there is a limited amount of detailed information about the project (e.g., in the early phases). Analogous estimating is a form of expert judgment. Analogous estimating is most reliable when the previous activities are similar in fact and not just in appearance, and the project team members preparing the estimates have the needed expertise.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

Terms and Acronyms

Application Area

A

Begins with A: A category of projects that have common components significant in such projects, but are not needed or present in all projects. Application areas are usually defined in terms of either the product (i.e., by similar technologies or production methods) or the type of customer (i.e., internal versus external, government versus commercial) or industry sector (i.e., utilities, automotive, aerospace, information technologies). Application areas can overlap.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

Terms and Acronyms

Apportioned Effort (AE)

A

Begins with A: Effort applied to project work that is not readily divisible into discrete efforts for that work, but which is related in direct proportion to measurable discrete work efforts. Contrast with discrete effort.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

Terms and Acronyms

Approval

A

Begins with A: See approve.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
Q

Terms and Acronyms

Approve

A

Begins with A: The act of formally confirming, sanctioning, ratifying, or agreeing to something.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
26
Q

Terms and Acronyms

Approved Change Request [Output/Input]

A

Begins with A: A change request that has been processed through the integrated change control process and approved. Contrast with requested change.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
27
Q

Terms and Acronyms

Arrow

A

Begins with A: The graphic presentation of a schedule activity in the arrow diagramming method or a logical relationship between schedule activities in the precedence diagramming method.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
28
Q

Terms and Acronyms

Arrow Diagramming Method (ADM [Technique]

A

Begins with A: A schedule network diagramming technique in which schedule activities are represented by arrows. The tail of the arrow represents the start, and the head represents the finish of the schedule activity. (The length of the amlow does not represent the expected duration of the schedule activity.) Schedule activities are connected at points called nodes (usually drawn as small circles) to illustrate the sequence in which the schedule activities are expected to be performed. See also precedence diagramming method.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
29
Q

Terms and Acronyms

As-of Date

A

Begins with A: See data date.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
30
Q

Terms and Acronyms

Assumptions [Output/Input]

A

Begins with A: Assumptions are factors that, for planning purposes, are considered to be true, real, or certain without proof or demonstration. Assumptions affect all aspects of project planning, and are part of the progressive elaboration of the project. Project teams frequently identify, document, and validate assumptions as part of their planning process. Assumptions generally involve a degree of risk.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
31
Q

Terms and Acronyms

Assumptions Analysis [Technique]

A

Begins with A: A technique that explores the accuracy of assumptions and identifies risks to the project from inaccuracy, inconsistency, or incompleteness of assumptions.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
32
Q

Terms and Acronyms

Authority

A

Begins with A: The right to apply project resources*, expend fluids, make decisions, or give approvals.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
33
Q

Terms and Acronyms

Backward Pass

A

Begins with B: The calculation of late finish dates and late start dates for the uncompleted portions of all schedule activities. Determined by working backwards through the schedule network logic from the project’s end date. The end date may be calculated in a forward pass or set by the customer or sponsor. See also schedule network analysis.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
34
Q

Terms and Acronyms

Bar Chart [Tool]

A

Begins with B: A graphic display of schedule-related information. In the typical bar chart, schedule activities or work breakdown structure components are listed down the left side of the chart, dales are shown across the top, and activity durations are shown as date-placed horizontal bars. Also called a Gantt chart.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
35
Q

Terms and Acronyms

Baseline

A

Begins with B: The approved time phased plan (for a project, a work breakdown structure component, a work package, or a schedule activity), plus or minus approved project scope, cost, schedule, and technical changes. Generally refers to the current baseline, but may refer to the original or some other baseline. Usually used with a modifier (e.g., cost baseline, schedule baseline, performance measurement baseline, technical baseline). See also performance measurement baseline.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
36
Q

Terms and Acronyms

Baseline Finish Date

A

Begins with B: The finish date of a schedule activity in the approved schedule baseline. Sec also scheduled finish elate.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
37
Q

Terms and Acronyms

Baseline Start Date

A

Begins with B: The start date of a schedule activity in the approved schedule baseline. See also scheduled strut date.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
38
Q

Terms and Acronyms

Bill of Materials (BOM)

A

Begins with B: A documented formal hierarchical tabulation of the physical assemblies, subassemblies, and components needed to fabricate a product.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
39
Q

Terms and Acronyms

Bottom-up Estimating [Technique]

A

Begins with B: A method of estimating a component of work. The work is decomposed into more detail. An estimate is prepared of what is needed to meet the requirements of each of the lower, more detailed pieces of work, and these estimates are then aggregated into a total quantity for the component of work. The accuracy of bottom-up estimating is driven by the size and complexity of the work identified at the lower levels. Generally smaller work scopes increase the accuracy of the estimates.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
40
Q

Terms and Acronyms

Brainstorming [Technique]

A

Begins with B: A general data gathering and creativity technique that can be used to identify risks, ideas, or solutions to issues by using a group of team members or subject-matter experts. Typically, a brainstorming session is structured so that each participant’s ideas are recorded for later analysis.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
41
Q

Terms and Acronyms

Budget

A

Begins with B: The approved estimate for the project or any work breakdown structure component or any schedule activity. See also estimate.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
42
Q

Terms and Acronyms

Budget at Completion (BAC)

A

Begins with B: The sum of all the budgets established for the work to be performed on a project or a work breakdown structure component or a schedule activity. The total planned value for the project.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
43
Q

Terms and Acronyms

Budgeted Cost of Work Performed (BCWP)

A

Begins with B: See earned value (Elf). Budgeted Cost of Work Scheduled (BCWS). See planned value (P V). Buffer. See reserve.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
44
Q

Terms and Acronyms

Buyer

A

Begins with B: The acquirer of products, services, or results for an organization.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
45
Q

Terms and Acronyms

Calendar Unit

A

Begins with C: The smallest unit of time used in scheduling the project, Calendar units are generally in hours, days, or weeks, but can also be in quarter years, months, shifts, or even in minutes.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
46
Q

Terms and Acronyms

Change Control

A

Begins with C: Identifying, documenting, approving or rejecting, and controlling changes to the project baselines *.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
47
Q

Terms and Acronyms

Change Control Board (CCB)

A

Begins with C: A formally constituted group of stakeholders responsible for reviewing, evaluating, approving, delaying, or rejecting changes to the project, with all decisions and recommendations being recorded.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
48
Q

Terms and Acronyms

Change Control System [Tool]

A

Begins with C: A collection of formal documented procedures that define how project deliverables and documentation will be controlled, changed, and approved. In most application areas the change control system is a subset of the configuration management system.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
49
Q

Terms and Acronyms

Change Request

A

Begins with C: Requests to expand or reduce the project scope, modify policies, processes, plans, or procedures, modify costs or budgets, or revise schedules. Requests for a change can be direct or indirect, externally or internally initiated, and legally or contractually mandated or optional. Only formally documented requested changes are processed and only approved change requests are implemented.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
50
Q

Terms and Acronyms

Chart of Accounts [Tool]

A

Begins with C: Any numbering system used to monitor project costs* by category (e.g., labor, supplies, materials, and equipment). The project chart of accounts is usually based upon the corporate chart of accounts of the primary performing organization. Contrast with code of accounts.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
51
Q

Terms and Acronyms

Charter

A

Begins with C: See project charter.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
52
Q

Terms and Acronyms

Checklist [Outputllnput]

A

Begins with C: Items listed together for convenience of comparison, or to ensure the actions associated with them are managed appropriately and not forgotten. An example is a list of items to be inspected that is created during quality planning and applied during quality control.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
53
Q

Terms and Acronyms

Claim

A

Begins with C: A request, demand, or assertion of rights by a seller against a buyer, or vice versa, for consideration, compensation, or payment under the terms of a legally binding contract, such as for a disputed change.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
54
Q

Terms and Acronyms

Close Project [Process]

A

Begins with C: The process of finalizing all activities across all of the project process groups to formally close the project or phase.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
55
Q

Terms and Acronyms

Closing Processes [Process Group]

A

Begins with C: Those processes performed to formally terminate all activities of a project or phase, and transfer the completed product to others or close a cancelled project.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
56
Q

Terms and Acronyms

Code of Accounts [Tool]

A

Begins with C: Any numbering system used to uniquely identify each component of the work breakdown structure. Contrast with chart of accounts.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
57
Q

Terms and Acronyms

Co-location [Technique]

A

Begins with C: An organizational placement strategy where the project team members are physically located close to one another in order to improve communication, working relationships, and productivity.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
58
Q

Terms and Acronyms

Common Cause

A

Begins with C: A source of variation that is inherent in the system and predictable. On a control chart, it appears as part of the random process variation (i.e., variation from a process that would be considered normal or not unusual), and is indicated by a random pattern of points within the control limits. Also referred to as random cause. Contrast with special cause.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
59
Q

Terms and Acronyms

Communication

A

Begins with C: A process through which information is exchanged among persons using a common system of symbols, signs, or behaviors.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
60
Q

Terms and Acronyms

Communication Management Plan [Output/Input]

A

Begins with C: The document that describes: the communications needs and expectations for the project; how and in what format information will be communicated; when and where each communication will be made; and who is responsible for providing each type of communication. A communication management plan can be formal or informal, highly detailed or broadly framed, based on the requirements of the project stakeholders. The communication management plan is contained in, or is a subsidiary plan of, the project management plan.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
61
Q

Terms and Acronyms

Communications Planning [Process]

A

Begins with C: The process of determining the information and communications needs of the project stakeholders: who they are, what is their level of interest and influence on the project, who needs what information, when will they need it, and how it will be given to them.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
62
Q

Terms and Acronyms

Compensation

A

Begins with C: Something given or received, a payment or recompense, usually something monetary or in kind for products, services, or results provided or received.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
63
Q

Terms and Acronyms

Component

A

Begins with C: A constituent part, element, or piece of a complex whole.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
64
Q

Terms and Acronyms

Configuration Management System [Tool]

A

Begins with C: A subsystem of the overall project management system. It is a collection of formal documented procedures used to apply technical and administrative direction and surveillance to: identify and document the functional and physical characteristics of a product, result, service, or component; control any changes to such characteristics; record and report each change and its implementation status; and support the audit of the products, results, or components to verify conformance to requirements. It includes the documentation, tracking systems, and defined approval levels necessary for authorizing and controlling changes. In most application areas, the configuration management system includes the change control system.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
65
Q

Terms and Acronyms

Constraint [Input]

A

Begins with C: The state, quality, or sense of being restricted to a given course of action or inaction. An applicable restriction or limitation, either internal or external to the project, that will affect the performance of the project or a process. For example. a schedule constraint is any limitation or restraint placed on the project schedule that affects when a schedule activity can be scheduled and is usually in the form of fixed imposed dates. A cost constraint is any limitation or restraint placed on the project budget such as fiends available over time. A project resource constraint is any limitation or restraint placed on resource usage, such as what resource skills or disciplines are available and the amount of a given resource available during a specified time frame.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
66
Q

Terms and Acronyms

Contingency

A

Begins with C: See reserve. Contingency Allowance. See reserve.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
67
Q

Terms and Acronyms

Contingency Reserve [Output/Input]

A

Begins with C: The amount of,junds, budget, or time needed above the estimate to reduce the risk of overruns of project objectives to a level acceptable to the organization.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
68
Q

Terms and Acronyms

Contract [Output/Input]

A

Begins with C: A contract is a mutually binding agreement that obligates the seller to provide the specified product or service or result and obligates the bui’er to pay for it.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
69
Q

Terms and Acronyms

Contract Administration [Process]

A

Begins with C: The process of managing the contract and the relationship between the buyer and seller, reviewing and documenting how a seller is performing or has performed to establish required corrective actions and provide a basis for future relationships with the seller, managing contract related changes and, when appropriate, managing the contractual relationship with the outside buyer of the project.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
70
Q

Terms and Acronyms

Contract Closure [Process]

A

Begins with C: The process of completing and settling the contract, including resolution of any open items and closing each contract.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
71
Q

Terms and Acronyms

Contract Management Plan [Output/Input]

A

Begins with C: The document that describes how a specific contract will be administered and can include items such as required documentation delivery and performance requirements. A contract management plan can be formal or informal, highly detailed or broadly framed, based on the requirements in the contract, Each contract management plan is a subsidiary plan of the project management plan.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
72
Q

Terms and Acronyms

Contract Statement of Work (SOW) [Output/Input]

A

Begins with C: A narrative description of products, services, or results to be supplied under contract.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
73
Q

Terms and Acronyms

Contract Work Breakdown Structure (CWBS) [Output/Input]

A

Begins with C: A portion of the work breakdown structure for the project developed and maintained by a seller contracting to provide a subproject or project component.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
74
Q

Terms and Acronyms

Control [Technique]

A

Begins with C: Comparing actual performance with planned performance, analyzing variances, assessing trends to effect process improvements, evaluating possible alternatives, and recommending appropriate corrective action as needed.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
75
Q

Terms and Acronyms

Control Account (CA) [Tool]

A

Begins with C: A management control point where scope, budget (resource plans), actual cost, and schedule are integrated and compared to earned value for perfomiance measurement. Control accounts are placed at selected management points (specific components at selected levels) of the work breakdown structure. Each control account may include one or more work packages, but each work package may be associated with only one control account. Each control account is associated with a specific single organizational component in the organizational breakdown structure (Ol3S). Previously called a cost account. See also work package.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
76
Q

Terms and Acronyms

Control Account Plan (CAP) [Tool]

A

Begins with C: A plan for all the work and effort to be performed in a control account. Each CAP has a definitive statement of work, schedule, and time-phased budget. Previously called a Cost Account Plan.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
77
Q

Terms and Acronyms

Control Chart [Tool]

A

Begins with C: A graphic display of process data over time and against established control limits, and that has a centerline that assists in detecting a trend of plotted values toward either control limit.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
78
Q

Terms and Acronyms

Control Limits

A

Begins with C: The area composed of three standard deviations on either side of the centerline, or mean, of a normal distribution of data plotted on a control chart that reflects the expected variation in the data. See also specification limits.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
79
Q

Terms and Acronyms

Controlling

A

Begins with C: See control.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
80
Q

Terms and Acronyms

Corrective Action

A

Begins with C: Documented direction for executing the project work to bring expected future performance of the project work in line with the project management plan.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
81
Q

Terms and Acronyms

Cost

A

Begins with C: The monetary value or price of a project activity* or component that includes the monetary worth of the resources required to perform and complete the activity or component, or to produce the component. A specific cost can be composed of a combination of cost components including direct labor hours, other direct costs, indirect labor hours, other indirect costs, and purchased price. (However, in the earned value management methodology, in some instances, the term cost can represent only labor hours without conversion to monetary worth.) See also actual cost and estimate.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
82
Q

Terms and Acronyms

Cost Baseline

A

Begins with C: See baseline.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
83
Q

Terms and Acronyms

Cost Budgeting [Process]

A

Begins with C: The process of aggregating the estimated costs of individual activities or work packages to establish a cost baseline.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
84
Q

Terms and Acronyms

Cost Control [Process]

A

Begins with C: The process of influencing the factors that create variances, and controlling changes to the project budget.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
85
Q

Terms and Acronyms

Cost Estimating [Process]

A

Begins with C: The process of developing an approximation of the cost of the resources needed to complete project activities*.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
86
Q

Terms and Acronyms

Cost Management Plan [Output/Input]

A

Begins with C: The document that sets out the format and establishes the activities and criteria for planning, structuring, and controlling the project costs. A cost management plan can be formal or informal, highly detailed or broadly framed, based on the requirements of the project stakeholders. The cost management plan is contained in, or is a subsidiary plan, of the project management plan.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
87
Q

Terms and Acronyms

Cost of Quality (COQ) [Technique]

A

Begins with C: Determining the costs incurred to ensure qualitt. Prevention and appraisal costs (cost of conformance) include costs for quality planning, quality control (QC), and quality assurance to ensure compliance to requirements (i.e., training, QC systems, etc.). Failure costs (cost of non-conformance) include costs to rework products, components, or processes that are non-compliant, costs of warranty work and waste, and loss of reputation.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
88
Q

Terms and Acronyms

Cost Performance Index (CPI)

A

Begins with C: A measure of cost efficiency on a project. It is the ratio of earned value (EV) to actual costs (AC). CPI = EV divided by AC. A value equal to or greater than one indicates a favorable condition and a value less than one indicates an unfavorable condition.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
89
Q

Terms and Acronyms

Cost-Plus-Fee (CPF)

A

Begins with C: A type of cost reimbursable contract where the buyer reimburses the seller for seller’s allowable costs for performing the contract work and seller also receives a fee calculated as an agreed upon percentage of the costs. The fee varies with the actual cost.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
90
Q

Terms and Acronyms

Cost-Plus-Fixed-Fee (CPFF) Contract

A

Begins with C: A type of cost-reimbursable contract where the buyer reimburses the seller for the seller’s allowable costs (allowable costs are defined by the contract) plus a fixed amount of profit (fee).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
91
Q

Terms and Acronyms

Cost-Plus-Incentive-Fee (CPIF) Contract

A

Begins with C: A type of cost-reimbursable contract where the barer reimburses the seller for the seller’s allowable costs (allowable costs are defined by the contract), and the seller earns its profit if it meets defined performance criteria.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
92
Q

Terms and Acronyms

Cost-Plus-Percentage of Cost (CPPC)

A

Begins with C: See cost-plus-fee.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
93
Q

Terms and Acronyms

Cost-Reimbursable Contract

A

Begins with C: A type of contract involving payment (reimbursement) by the buyer to the seller for the seller’s actual costs, plus a fee typically representing seller’s profit. Costs are usually classified as direct costs or indirect costs. Direct costs are costs incurred for the exclusive benefit of the project, such as salaries of firll-time project staff. Indirect costs, also called overhead and general and administrative cost, are costs allocated to the project by the performing organization as a cost of doing business, such as salaries of management indirectly involved in the project, and cost of electric utilities for the office. Indirect costs are usually calculated as a percentage of direct costs. Cost-reimbursable contracts often include incentive clauses where, if the seller meets or exceeds selected project objectives, such as schedule targets or total cost, then the seller receives from the buyer an incentive or bonus payment.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
94
Q

Terms and Acronyms

Cost Variance (CV)

A

Begins with C: A measure of cost performance on a project. It is the algebraic difference between earned value (EV) and actual cost (AC). CV = EV minus AC. A positive value indicates a favorable condition and a negative value indicates an unfavorable condition.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
95
Q

Terms and Acronyms

Crashing [Technique]

A

Begins with C: A specific type of project schedule compression technique performed by taking action to decrease the total project schedule duration* after analyzing a number of alternatives to determine how to get the maximum schedule duration compression for the least additional cost. Typical approaches for crashing a schedule include reducing schedule activity durations and increasing the assignment of resources on schedule activities. See schedule compression and see also fast tracking.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
96
Q

Terms and Acronyms

Create WBS (Work Breakdown Structure) [Process]

A

Begins with C: The process of subdividing the major project deliverables and project work into smaller, more manageable components

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
97
Q

Terms and Acronyms

Criteria

A

Begins with C: Standards, rules, or tests on which a judgment or decision can be based, or by which a product, service, result, or process can be evaluated.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
98
Q

Terms and Acronyms

Critical Activity

A

Begins with C: Any schedule activity on a critical path in a project schedule. Most commonly determined by using the critical path method. Although some activities are “critical,” in the dictionary sense, without being on the critical path, this meaning is seldom used in the project context.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
99
Q

Terms and Acronyms

Critical Chain Method [Technique]

A

Begins with C: A schedule network analysis technique* that modifies the project schedule to account for limited resources. The critical chain method mixes deterministic and probabilistic approaches to schedule network analysis.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
100
Q

Terms and Acronyms

Critical Path [Output/Input]

A

Begins with C: Generally, but not always, the sequence of schedule activities that determines the duration of the project. Generally, it is the longest path through the project. I-lowever, a critical path can end, as an example, on a schedule milestone that is in the middle of the project schedule and that has a finish-no-later-than imposed date schedule constraint. See also critical path method.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
101
Q

Terms and Acronyms

Critical Path Method (CPM) [Technique]

A

Begins with C: A schedule network analysis technique* used to determine the amount of scheduling flexibility (the amount of float) on various logical network paths in the project schedule network, and to determine the minimum total project duration. Early start and finish dates* are calculated by means of a forward pass, using a specified start date. Late start and finish dates* are calculated by means of a backward pass, starting from a specified completion date, which sometimes is the project earl) finish date determined during the forward pass calculation.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
102
Q

Terms and Acronyms

Current Finish Date

A

Begins with C: The current estimate of the point in time when a schedule activity will be completed, where the estimate reflects any reported work progress. See also scheduled finish date and baseline finish elate.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
103
Q

Terms and Acronyms

Current Start Date

A

Begins with C: The current estimate of the point in time when a schedule activity will begin, where the estimate reflects any reported work progress. See also scheduled start date and baseline start date.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
104
Q

Terms and Acronyms

Customer

A

Begins with C: The person or organization that will use the project’s product or service or result. (See also user).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
105
Q

Terms and Acronyms

Data Date (-DD)

A

Begins with D: The date up to or through which the project’s reporting system has provided actual status and accomplishments. In some reporting systems, the status information for the data date is included in the past and in some systems the status information is in the future. Also called as-of date and time-non’ date.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
106
Q

Terms and Acronyms

Date

A

Begins with D: A term representing the day, month, and year of a calendar, and, in some instances, the time of day.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
107
Q

Terms and Acronyms

Decision Tree Analysis [Technique]

A

Begins with D: The decision tree is a diagram that describes a decision under consideration and the implications of choosing one or another of the available alternatives. It is used when some future scenarios or outcomes of actions are uncertain. It incorporates probabilities and the costs or rewards of each logical path of events and future decisions, and uses expected monetary value analysis to help the organization identify the relative values of alternate actions. See also expected monetary value anal ys i.s.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
108
Q

Terms and Acronyms

Decompose

A

Begins with D: See decomposition.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
109
Q

Terms and Acronyms

Decomposition [Technique]

A

Begins with D: A planning technique that subdivides the project scope and project deliverables into smaller, more manageable components, until the project work associated with accomplishing the project scope and providing the deliverables is defined in sufficient detail to support executing, monitoring, and controlling the work.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
110
Q

Terms and Acronyms

Defect

A

Begins with D: An imperfection or deficiency in a project component where that component does not meet its requirements or specifications and needs to be either repaired or replaced.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
111
Q

Terms and Acronyms

Defect Repair

A

Begins with D: Formally documented identification of a defect in a project component with a recommendation to either repair the defect or completely replace the component.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
112
Q

Terms and Acronyms

Deliverable [Outputllnput]

A

Begins with D: Any unique and verifiable product, result, or capability to perform a service that must be produced to complete a process, phase, or project. Often used more narrowly in reference to an external deliverable, which is a deliverable that is subject to approval by the project sponsor or customer. See also product, service, and result.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
113
Q

Terms and Acronyms

Delphi Technique [Technique]

A

Begins with D: An information gathering technique used as a way to reach a consensus of experts on a subject. Experts on the subject participate in this technique anonymously. A facilitator uses a questionnaire to solicit ideas about the important project points related to the subject. The responses are summarized and are then re-circulated to the experts for further comment. Consensus may be reached in a few rounds of this process. The Delphi technique helps reduce bias in the data and keeps any one person from having undue influence on the outcome.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
114
Q

Terms and Acronyms

Dependency

A

Begins with D: See logical relationship.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
115
Q

Terms and Acronyms

Design Review [Technique]

A

Begins with D: A management technique used for evaluating a proposed design to ensure that the design of the system or product meets the customer requirements, or to assure that the design will perform successfully, can be produced, and can be maintained.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
116
Q

Terms and Acronyms

Develop Project Charter [Process]

A

Begins with D: The process of developing the project charter that formally authorizes a project.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
117
Q

Terms and Acronyms

Develop Project Management Plan [Process]

A

Begins with D: The process of documenting the actions necessary to define, prepare, integrate, and coordinate all subsidiary plans into a project management plan.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
118
Q

Terms and Acronyms

Develop Preliminary Project Scope Statement [Process]

A

Begins with D: The process of developing the preliminary project scope statement that provides a high level scope narrative.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
119
Q

Terms and Acronyms

Develop Project Team [Process]

A

Begins with D: The process of improving the competencies and interaction of team members to enhance project performance.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
120
Q

Terms and Acronyms

Direct and Manage Project Execution [Process]

A

Begins with D: The process of executing the work defined in the project management plain to achieve the project’s requirements defined in the project scope statement.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
121
Q

Terms and Acronyms

Discipline

A

Begins with D: A field of work requiring specific knowledge and that has a set of rules governing work conduct (e.g., mechanical engineering, computer programming, cost estimating, etc.).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
122
Q

Terms and Acronyms

Discrete Effort

A

Begins with D: Work effort that is separate, distinct, and related to the completion of specific work breakdown structure components and deliverables, and that can be directly planned and measured. Contrast with apportioned effort.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
123
Q

Terms and Acronyms

Document

A

Begins with D: A medium and the information recorded thereon, that generally has permanence and can be read by a person or a machine. Examples include project management plans, specifications, procedures, studies, and manuals.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
124
Q

Terms and Acronyms

Documented Procedure

A

Begins with D: A formalized written description of how to carry out an activity, process, technique, or methodology.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
125
Q

Terms and Acronyms

Dummy Activity

A

Begins with D: A schedule activity of zero duration used to show a logical relationship in the arrow diagramming method. Dummy activities are used when logical relationships cannot be completely or correctly described with schedule activity arrows. Dummy activities are generally shown graphically as a clashed line headed by an arrow.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
126
Q

Terms and Acronyms

Duration (DU or DUR)

A

Begins with D: The total number of work periods (not including holidays or other nonworking periods) required to complete a schedule activity or work breakdown structure component. Usually expressed as workdays or workweeks. Sometimes incorrectly equated with elapsed time. Contrast with effort. See also original duration, remaining duration, and actual duration.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
127
Q

Terms and Acronyms

Early Finish Date (EF)

A

Begins with E: In the critical path method, the earliest possible point in time on which the uncompleted portions of a schedule activity (or the project) can finish, based on the schedule network logic, the data date, and any schedule constraints. Early finish dates can change as the project progresses and as changes are made to the project management plan.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
128
Q

Terms and Acronyms

Early Start Date (ES)

A

Begins with E: In the critical path method, the earliest possible point in time on which the uncompleted portions of a schedule activity (or the project) can start, based on the schedule network logic, the data date, and any schedule constraints. Early start dates can change as the project progresses and as changes are made to the project management plan.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
129
Q

Terms and Acronyms

Earned Value (EV)

A

Begins with E: The value of work performed expressed in terms of the approved budget assigned to that work for a schedule activity or work breakdown structure component. Also referred to as the budgeted cost of work performed (BCWP).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
130
Q

Terms and Acronyms

Earned Value Management (EVM)

A

Begins with E: A management methodology for integrating scope, schedule, and resources, and for objectively measuring project performance and

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
131
Q

Terms and Acronyms

progress

A

Begins with p: Performance is measured by determining the budgeted cost of work performed (i.e., earned value) and comparing it to the actual cost of work performed (i.e., actual cost). Progress is measured by comparing the earned value to the planned value.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
132
Q

Terms and Acronyms

Earned Value Technique (EVT) [Technique]

A

Begins with E: A specific technique for measuring the performance of work and used to establish the pelformcnlce measurement baseline (PMB). Also referred to as the earning rules and crediting method.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
133
Q

Terms and Acronyms

Effort

A

Begins with E: The number of labor units required to complete a schedule activity or work breakdown structure component. Usually expressed as staff hours. staff days, or staff weeks. Contrast with duration,

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
134
Q

Terms and Acronyms

Enterprise

A

Begins with E: A company, business, firm, partnership, corporation, or governmental agency.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
135
Q

Terms and Acronyms

Enterprise Environmental Factors [Output/Input]

A

Begins with E: Any or all external environmental factors and internal organizational environmental factors that surround or influence the project’s success. These factors are from any or all of the enterprises involved in the project, and include organizational culture and structure, infrastructure, existing resources, commercial databases, market conditions, and project management software.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
136
Q

Terms and Acronyms

Estimate [Output/Input]

A

Begins with E: A quantitative assessment of the likely amount or outcome. Usually applied to project costs, resources, effort, and durations and is usually preceded by a modifier (i.e., preliminary, conceptual, feasibility, order-of-magnitude, definitive). It should always include some indication of accuracy (e.g., ±x percent).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
137
Q

Terms and Acronyms

Estimate at Completion (EAC) [OutputlInput]

A

Begins with E: The expected total cost of a schedule activity, a work breakdown structure component, or the project when the defined scope of work will be completed. EAC is equal to the actual cost (AC) plus the estimate to complete (ETC) for all of the remaining work. EAC = AC plus ETC. The EAC may be calculated based on performance to date or estimated by the project team based on other factors, in which case it is often referred to as the latest revised estimate. See also earned value technique and estimate to complete.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
138
Q

Terms and Acronyms

Estimate to Complete (ETC) [Output/Input]

A

Begins with E: The expected cost needed to complete all the remaining work for a schedule activity, }cork breakdown structure component, or the project. See also earned value technique and estimate at completion.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
139
Q

Terms and Acronyms

Event

A

Begins with E: Something that happens, an occurrence, an outcome.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
140
Q

Terms and Acronyms

Exception Report

A

Begins with E: Document that includes only major variations from the plan (rather than all variations).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
141
Q

Terms and Acronyms

Execute

A

Begins with E: Directing. managing, performing, and accomplishing the project work, providing the deliverables, and providing work performance information.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
142
Q

Terms and Acronyms

Executing

A

Begins with E: See execute.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
143
Q

Terms and Acronyms

Executing Processes [Process Group]

A

Begins with E: Those processes performed to complete the work defined in the project management plan to accomplish the project’s objectives defined in the project scope statement.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
144
Q

Terms and Acronyms

Execution

A

Begins with E: See execute.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
145
Q

Terms and Acronyms

Expected Monetary Value (EMV) Analysis

A

Begins with E: A statistical technique that calculates the average outcome when the future includes scenarios that may or may not happen. A common use of this technique is within decision tree analysis. Modeling and simulation are recommended for cost and schedule risk analysis because it is more powerful and less subject to misapplication than expected monetary value analysis.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
146
Q

Terms and Acronyms

Expert Judgment [Technique]

A

Begins with E: Judgment provided based upon expertise in an application area, knowledge area, discipline, industry, etc. as appropriate for the activity being performed. Such expertise may be provided by any group or person with specialized education. knowledge, skill, experience, or training, and is available from many sources, including: other units within the performing organization; consultants; stakeholders. including customers; professional and technical associations; and industry groups.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
147
Q

Terms and Acronyms

Failure Mode and Effect Analysis (FMEA) [Technique]

A

Begins with F: An analytical procedure in which each potential failure mode in every component of a product is analyzed to determine its effect on the reliability of that component and, by itself or in combination with other possible failure modes, on the reliability of the product or system and on the required function of the component; or the examination of a product (at the system andlor- lower levels) for all ways that a failure may occur. For each potential failure, an estimate is made of its effect on the total system and of its impact. In addition, a review is undertaken of the action planned to minimize the probability of failure and to minimize its effects.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
148
Q

Terms and Acronyms

Fast Tracking [Technique]

A

Begins with F: A specific project schedule compression technique that changes network logic to overlap phases that would normally be done in sequence, such as the design phase and construction phase, or to perform schedule activities in parallel. See schedule compression and see also crashing.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
149
Q

Terms and Acronyms

Finish Date

A

Begins with F: A point in time associated with a schedule activity’s completion. Usually qualified by one of the following: actual, planned, estimated, scheduled, early, late, baseline, target, or current.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
150
Q

Terms and Acronyms

Finish-to-Finish (FF)

A

Begins with F: The logical relationship where completion of work of the successor activity cannot finish until the completion of work of the predecessor activity. See also logical relationship.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
151
Q

Terms and Acronyms

Finish-to-Start (FS)

A

Begins with F: The logical relationship where initiation of work of the successor activity depends upon the completion of work of the predecessor activity. See also logical relationship.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
152
Q

Terms and Acronyms

Firm-Fixed-Price (FFP) Contract

A

Begins with F: A type of fixed price contract where the hover pays the seller a set amount (as defined by the contract), regardless of the seller’s costs.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
153
Q

Terms and Acronyms

Fixed-Price-Incentive-Fee (FPIF) Contract

A

Begins with F: A type of’ contract where the buyer pays the seller a set amount (as defined by the contract), and the seller can earn an additional amount if the seller meets defined performance criteria.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
154
Q

Terms and Acronyms

Fixed-Price or Lump-Sum Contract

A

Begins with F: A type of contract involving a fixed total price for a well-defined product. Fixed-price contracts may also include incentives for meeting or exceeding selected project objectives, such as schedule targets. The simplest form of a fixed price contract is a purchase order.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
155
Q

Terms and Acronyms

Float

A

Begins with F: Also called slack. See total float and see also free float.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
156
Q

Terms and Acronyms

Flowcharting [Technique]

A

Begins with F: The depiction in a diagram format of the inputs, process actions, and outputs of one or more processes within a system.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
157
Q

Terms and Acronyms

Forecasts

A

Begins with F: Estimates or predictions of conditions and events in the project s future based on information and knowledge available at the time of the forecast. Forecasts are updated and reissued based on work performance information provided as the project is executed. The information is based on the project’s past performance and expected future performance, and includes information that could impact the project in the future, such as estimate at completion and estimate to complete.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
158
Q

Terms and Acronyms

Forward Pass

A

Begins with F: The calculation of the early start and early finish dates for the uncompleted portions of all network activities. See also schedule network analysis and backward pass.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
159
Q

Terms and Acronyms

Free Float (FF)

A

Begins with F: The amount of time that a schedule activity can be delayed without delaying the early start of any immediately following schedule activities. See also total float.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
160
Q

Terms and Acronyms

Functional Manager

A

Begins with F: Someone with management authority over an organizational unit within a frntctional organization. The manager of any group that actually makes a product or performs a service. Sometimes called a line manager.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
161
Q

Terms and Acronyms

Functional Organization

A

Begins with F: A hierarchical organization where each employee has one clear superior, staff are grouped by areas of specialization, and managed by a person with expertise in that area.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
162
Q

Terms and Acronyms

Funds

A

Begins with F: A supply of money or pecuniary resources immediately available. Gantt Chart. See bar chart.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
163
Q

Terms and Acronyms

Goods

A

Begins with G: Commodities, wares, merchandise.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
164
Q

Terms and Acronyms

Grade

A

Begins with G: A category or rank used to distinguish items that have the same functional use (e.g., “hammer”), but do not share the sane requirements for quality (e.g., different hammers may need to withstand different amounts of force).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
165
Q

Terms and Acronyms

Ground Rules [Tool]

A

Begins with G: A list of acceptable and unacceptable behaviors adopted by a project team to improve working relationships, effectiveness, and commwiication.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
166
Q

Terms and Acronyms

Hammock Activity

A

Begins with H: See sw marv activity.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
167
Q

Terms and Acronyms

Historical Information

A

Begins with H: Documents and data on prior projects including project files, records, correspondence, closed contracts, and closed projects.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
168
Q

Terms and Acronyms

Iluman Resource Planning [Process]

A

Begins with I: The process of identifying and documenting project roles, responsibilities and reporting relationships, as well as creating the staffing m anagentent plan.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
169
Q

Terms and Acronyms

Imposed Date

A

Begins with I: A fixed elate imposed on a schedule activity or schedule milestone, usually in the form of a “start no earlier than” and “finish no later than” date.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
170
Q

Terms and Acronyms

Influence Diagram [Tool]

A

Begins with I: Graphical representation of situations showing causal influences, time ordering of events, and other relationships among variables and outcomes.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
171
Q

Terms and Acronyms

Influencer

A

Begins with I: Persons or groups that are not directly related to the acquisition or use of the project’s product, but, due to their position in the customer organization*, can influence, positively or negatively, the course of the project.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
172
Q

Terms and Acronyms

Information Distribution [Process]

A

Begins with I: The process of making needed information available to project stakeholders in a timely manner.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
173
Q

Terms and Acronyms

Initiating Processes [Process Group]

A

Begins with I: Those processes performed to authorize and define the scope of a new phase or project or that can result in the continuation of halted project work. A large number of the initiating processes are typically done outside the project’s scope of control by the organization, program, or portfolio processes and those processes provide input to the project’s initiating processes group.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
174
Q

Terms and Acronyms

Initiator

A

Begins with I: A person or organization that has both the ability and authority to start a project.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
175
Q

Terms and Acronyms

Input [Process Input]

A

Begins with I: Any item, whether internal or external to the project that is required by a process before that process proceeds. May be an output from a predecessor process.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
176
Q

Terms and Acronyms

Inspection [Technique]

A

Begins with I: Examining or measuring to verify whether an activity, component, product, result or service conforms to specified requirements.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
177
Q

Terms and Acronyms

Integral

A

Begins with I: Essential to completeness: requisite; constituent with; formed as a unit with another component.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
178
Q

Terms and Acronyms

Integrated

A

Begins with I: Interrelated, interconnected, interlocked, or meshed components blended and unified into a functioning or unified whole.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
179
Q

Terms and Acronyms

Integrated Change Control [Process]

A

Begins with I: The process of reviewing all change requests, approving changes and controlling changes to deliverables and organizational process assets.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
180
Q

Terms and Acronyms

Invitation for Bid (IFB)

A

Begins with I: Generally, this term is equivalent to request jor proposal. However, in some application areas, it may have a narrower or more specific meaning.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
181
Q

Terms and Acronyms

Issue

A

Begins with I: A point or matter in question or in dispute, or a point or matter that is not settled and is under discussion or over which there are opposing views or disagreements.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
182
Q

Terms and Acronyms

Knowledge

A

Begins with K: Knowing something with the familiarity gained through experience, education, observation, or investigation, it is understanding a process, practice, or technique, or how to use a tool.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
183
Q

Terms and Acronyms

Knowledge Area Process

A

Begins with K: An identifiable project management process within a knowledge area.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
184
Q

Terms and Acronyms

Knowledge Area, Project Management

A

Begins with K: See Project Management Knowledge Area.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
185
Q

Terms and Acronyms

Lag [Technique]

A

Begins with L: A modification of a logical relationship that directs a delay in the successor activity. For example, in a finish-to-start dependency with a ten-day lag, the successor activity cannot start until ten days alter the predecessor activity has finished. See also lead.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
186
Q

Terms and Acronyms

Late Finish Date (LF)

A

Begins with L: In the critical path method, the latest possible point in time that a schedule activity may be completed based upon the schedule network logic, the project completion date, and any constraints assigned to the schedule activities without violating a schedule constraint or delaying the project completion date. The late finish dates are determined (luring the backward pass calculation of the project schedule network.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
187
Q

Terms and Acronyms

Late Start Date (LS)

A

Begins with L: In the critical path method, the latest possible point in time that a schedule activity may begin based upon the schedule network logic, the project completion date, and any constraints assigned to the schedule activities without violating a schedule constraint or delaying the project completion date. The late start dates are determined during the backward pass calculation of the project schedule network.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
188
Q

Terms and Acronyms

Latest Revised Estimate

A

Begins with L: See estimate at completion.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
189
Q

Terms and Acronyms

Lead [‘technique]

A

Begins with L: A modification of a logical relationship that allows an acceleration of the successor activity. For example, in a finish-to-start dependency with a ten-day lead, the successor activity can start ten days before the predecessor activity has finished. See also lag. A negative lead is equivalent to a positive lag.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
190
Q

Terms and Acronyms

Lessons Learned [Output/Input]

A

Begins with L: The learning gained from the process of performing the project. Lessons learned may be identified at any point. Also considered a project record, to be included in the lessons learned knowledge base.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
191
Q

Terms and Acronyms

Lessons Learned Knowledge Base

A

Begins with L: A store of historical information and lessons learned about both the outcomes of previous project selection decisions and previous project performance.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
192
Q

Terms and Acronyms

Level of Effort (LOE)

A

Begins with L: Support-type activity (e.g., seller or customer liaison, project cost accounting, project management, etc.), which does not produce definitive end products. It is generally characterized by a uniform rate of work performance over a period of time determined by the activities supported.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
193
Q

Terms and Acronyms

Leveling

A

Begins with L: See resource leveling. Life Cycle. See project life cycle.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
194
Q

Terms and Acronyms

Log

A

Begins with L: A document used to record and describe or denote selected items identified during execution of a process or activity. Usually used with a modifier, such as issue, quality control, action, or defect.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
195
Q

Terms and Acronyms

Logic

A

Begins with L: See network logic.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
196
Q

Terms and Acronyms

Logic Diagram

A

Begins with L: See project schedule network diagram.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
197
Q

Terms and Acronyms

Logical Relationship

A

Begins with L: A dependency between two project schedule activities, or between a project schedule activity and a schedule milestone. See also precedence relationship. The four possible types of logical relationships are: Finish-to-Start: Finish-to-Finish; Start­to-Start; and Start-lo-Finish.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
198
Q

Terms and Acronyms

Manage Project Team [Process]

A

Begins with M: The process of tracking team member performance, providing feedback, resolving issues, and coordinating changes to enhance project performance.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
199
Q

Terms and Acronyms

Manage Stakeholders [Process]

A

Begins with M: The process of managing communications to satisfy the requirements of, and resolve issues with, project stakeholders.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
200
Q

Terms and Acronyms

Master Schedule [Tool]

A

Begins with M: A summary-level project schedule that identifies the major deliverables and work breakdown structure components and key schedule milestones. See also milestone schedule.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
201
Q

Terms and Acronyms

Materiel

A

Begins with M: The aggregate of things used by an organization in any undertaking, such as equipment, apparatus, tools, machinery, gear, material, and supplies.

202
Q

Terms and Acronyms

Matrix Organization

A

Begins with M: Any organizational structure in which the project manager shares responsibility with the fimctional managers for assigning priorities and for directing the work of persons assigned to the project.

203
Q

Terms and Acronyms

Methodology

A

Begins with M: A system of practices, techniques. procedures, and rules used by those who work in a discipline.

204
Q

Terms and Acronyms

Milestone

A

Begins with M: A significant point or event in the project. See also schedule milestone.

205
Q

Terms and Acronyms

Milestone Schedule [Tool]

A

Begins with M: A summary-level schedule that identifies the major schedule milestones. See also master schedule.

206
Q

Terms and Acronyms

Monitor

A

Begins with M: Collect project performance data with respect to a plan, produce performance measures, and report and disseminate performance information.

207
Q

Terms and Acronyms

Monitor and Control Project Work [Process]

A

Begins with M: The process of monitoring and controlling the processes required to initiate, plan, execute, and close a project to meet the performance objectives defined in the project management plan and project scope statement.

208
Q

Terms and Acronyms

Monitoring

A

Begins with M: See monitor.

209
Q

Terms and Acronyms

Monitoring and Controlling Processes [Process Group]

A

Begins with M: Those processes performed to measure and monitor project execution* so that corrective action can be taken when necessary to control the execution of the phase or project.

210
Q

Terms and Acronyms

Monte Carlo Analysis

A

Begins with M: A technique that computes, or iterates, the project cost or project schedule many times using input values selected at random from probability distributions of possible costs or durations, to calculate a distribution of possible total project cost or completion dates.

211
Q

Terms and Acronyms

Near-Critical Activity

A

Begins with N: A schedule activity that has low total float. The concept of near-critical is equally applicable to a schedule activity or schedule network path. The limit below which total float is considered near critical is subject to expert judgment and varies from project to project.

212
Q

Terms and Acronyms

Network

A

Begins with N: See project schedule network diagram.

213
Q

Terms and Acronyms

Network Analysis

A

Begins with N: See schedule network anal sis.

214
Q

Terms and Acronyms

Network Logic

A

Begins with N: The collection of schedule activit}:’ dependencies that makes up a project schedule network diagram.

215
Q

Terms and Acronyms

Network Loop

A

Begins with N: A schedule network path that passes the same node twice. Network loops cannot be analyzed using traditional schedule network analysis techniques such as critical path method.

216
Q

Terms and Acronyms

Network Open End

A

Begins with N: A schedule activity without any predecessor activities or successor activities creating an unintended break in a schedule network path. Network open ends are usually caused by missing logical relationships.

217
Q

Terms and Acronyms

Network Path

A

Begins with N: Any continuous series of schedule activities connected with logical relationships in a project schedule network diagram.

218
Q

Terms and Acronyms

Networking [Technique]

A

Begins with N: Developing relationships with persons who may be able to assist in the achievement of objectives and responsibilities.

219
Q

Terms and Acronyms

Node

A

Begins with N: One of the defining points of a schedule network; a junction point joined to some or all of the other dependency lines. See also arrow diagramming method and precedence diagramming method.

220
Q

Terms and Acronyms

Objective

A

Begins with O: Something toward which work is to be directed, a strategic position to be attained, or a purpose to be achieved, a result to be obtained, a product to be produced, or a service to be performed.

221
Q

Terms and Acronyms

Operations

A

Begins with O: An organizational function performing the ongoing execution of activities that produce the same product or provide a repetitive service. Examples are: production operations, manufacturing operations, and accounting operations.

222
Q

Terms and Acronyms

Opportunity

A

Begins with O: A condition or situation favorable to the project, a positive set of circumstances, a positive set of events, a risk that will have a positive impact on project objectives, or a possibility for positive changes. Contrast with threat.

223
Q

Terms and Acronyms

Organization

A

Begins with O: A group of persons organized for some purpose or to perform some type of ‘t’o’k within an enterprise.

224
Q

Terms and Acronyms

Organization Chart [Tool]

A

Begins with O: A method for depicting interrelationships among a group of persons working together toward a common objective.

225
Q

Terms and Acronyms

Organizational Breakdown Structure (OHS) [Tool]

A

Begins with O: A hierarchically organized depiction of the project organization arranged so as to relate the work packages to the perfor fining organizational units, (Sometimes OBS is written as Organization Breakdown Structure with the same definition.)

226
Q

Terms and Acronyms

Organizational Process Assets [Outputllnput]

A

Begins with O: Any or all process related assets, from any or all of the organizations involved iii the project that are or can be used to influence the project’s success. These process assets include formal and informal plans, policies, procedures, and guidelines. The process assets also include the organizations’ knowledge bases such as lessons learned and historical irrfirrrrrcrtiorr.

227
Q

Terms and Acronyms

Original Duration (OD)

A

Begins with O: The activity duration originally assigned to a schedule activity and not updated as progress is reported on the activity. Typically used for comparison with actual duration and remaining duration when reporting schedule progress.

228
Q

Terms and Acronyms

Output [Process Output]

A

Begins with O: A product, result, or service generated by a process. May be an input to a successor process.

229
Q

Terms and Acronyms

Parametric Estimating [Technique]

A

Begins with P: An estimating technique that uses a statistical relationship between historical data and other variables (e.g.. square footage in construction, lines of code in software development) to calculate an estimate for activityparameters, such as scope. cost, budget, and duration. This technique can produce higher levels of accuracy depending upon the sophistication and the underlying data built into the model. An example for the cost parameter is multiplying the planned quantity of work to be performed by the historical cost per unit to obtain the estimated cost.

230
Q

Terms and Acronyms

Pareto Chart [Tool]

A

Begins with P: A histogram, ordered by frequency of occurrence, that shows how many results were generated by each identified cause.

231
Q

Terms and Acronyms

Path Convergence

A

Begins with P: The merging or joining of parallel schedule network paths into the same node in a project schedule network diagram. Path convergence is characterized by a schedule activity with more than one predecessor activity.

232
Q

Terms and Acronyms

Path Divergence

A

Begins with P: Extending or generating parallel schedule network paths from the same node in a project schedule network diagram. Path divergence is characterized by a schedule activity with more than one successor activity.

233
Q

Terms and Acronyms

Percent Complete (PC or PCl’)

A

Begins with P: An estimate, expressed as a percent, of the amount of work that has been completed on an activity or a stork breakdown structure component.

234
Q

Terms and Acronyms

Perform Quality Assurance (QA) [Process]

A

Begins with P: The process of applying the planned, systematic quality activities (such as audits or peer reviews) to ensure that the project employs all processes needed to meet requirements

235
Q

Terms and Acronyms

Perform Quality Control (QC) [Process]

A

Begins with P: The process of monitoring specific project results* to determine whether they comply with relevant quality standards and identifying ways to eliminate causes of unsatisfactory performance.

236
Q

Terms and Acronyms

Performance Measurement Baseline

A

Begins with P: An approved integrated scope-schedule-cost* plan for the project work against which project execution is compared to measure and manage performance. Technical and quality parameters may also be included.

237
Q

Terms and Acronyms

Performance Reporting [Process]

A

Begins with P: The process of collecting and distributing performance information. This includes status reporting, progress measurement, and forecasting.

238
Q

Terms and Acronyms

Performance Reports [Output/Input]

A

Begins with P: Documents and presentations that provide organized and summarized work performance information, earned value management parameters and calculations, and analyses of project work progress and status. Common formats for performance reports include bar charts, S-curves, histograms, tables, and project schedule network diagram showing current schedule status.

239
Q

Terms and Acronyms

Performing Organization

A

Begins with P: The enterprise whose personnel are most directly involved in doing the work of the project.

240
Q

Terms and Acronyms

Phase

A

Begins with P: See project phase.

241
Q

Terms and Acronyms

Plan Contracting [Process]

A

Begins with P: The process of documenting the products, services, and results requirements and identifying potential sellers.

242
Q

Terms and Acronyms

Plan Purchases and Acquisitions [Process]

A

Begins with P: The process of determining what to purchase or acquire, and determining when and how to do so.

243
Q

Terms and Acronyms

Planned Finish Date (PF)

A

Begins with P: See scheduled finish date. Planned Start Date (PS). See scheduled start date.

244
Q

Terms and Acronyms

Planned Value (PV)

A

Begins with P: The authorized budget assigned to the scheduled work to be accomplished for a schedule activity or work breakdown structure component. Also referred to as the budgeted cost of work scheduled (BCWS).

245
Q

Terms and Acronyms

Planning Package

A

Begins with P: A WBS component below the control account with known work content but without detailed schedule activities. See also control account.

246
Q

Terms and Acronyms

Planning Processes [Process Group]

A

Begins with P: Those processes performed to define and mature the project scope, develop the project management plan. and identify and schedule the project activities* that occur within the project.

247
Q

Terms and Acronyms

Portfolio

A

Begins with P: A collection of projects or programs and other work that are grouped together to facilitate effective management of that work to meet strategic business objectives. The projects or programs of the portfolio may not necessarily be interdependent or directly related.

248
Q

Terms and Acronyms

Portfolio Management [Technique]

A

Begins with P: The centralized management of one or more portfolios, which includes identifying, prioritizing, authorizing, managing, and controlling projects, programs, and other related work, to achieve specific strategic business objectives,

249
Q

Terms and Acronyms

Position Description [Tool]

A

Begins with P: An explanation of a project team member’s roles and responsibilities.

250
Q

Terms and Acronyms

Practice

A

Begins with P: A specific type of professional or management activity that contributes to the execution of a process and that may employ one or more techniques and tools.

251
Q

Terms and Acronyms

Precedence Diagramming Method (PDM) [Technique]

A

Begins with P: A schedule network diagramming technique in which schedule activities are represented by boxes (or nodes). Schedule activities are graphically linked by one or more logical relationships to show the sequence in which the activities are to be performed.

252
Q

Terms and Acronyms

Precedence Relationship

A

Begins with P: The term used in the precedence diagramming method for a logical relationship. In cut-rent usage, however, precedence relationship, logical relationship, and dependency are widely used interchangeably, regardless of the diagramming method used.

253
Q

Terms and Acronyms

Predecessor Activity

A

Begins with P: The schedule activity that determines when the logical successor activity can begin or end.

254
Q

Terms and Acronyms

Preventive Action

A

Begins with P: Documented direction to perform an activity that can reduce the probability of negative consequences associated with project risks*.

255
Q

Terms and Acronyms

Probability and Impact Matrix [fool]

A

Begins with P: A common way to determine whether a risk is considered low, moderate, or high by combining the two dimensions of a risk: its probability of occurrence, and its impact on objectives if it occurs.

256
Q

Terms and Acronyms

Procedure

A

Begins with P: A series of steps followed in a regular definitive order to accomplish something.

257
Q

Terms and Acronyms

Process

A

Begins with P: A set of interrelated actions and activities performed to achieve a specified set of products, results, or services.

258
Q

Terms and Acronyms

Process Group

A

Begins with P: See Project ]Management Process Groups.

259
Q

Terms and Acronyms

Procurement Documents [Output/Input]

A

Begins with P: Those documents utilized in bid and proposal activities, which include buyer’s Invitation for Bid. Invitation for Negotiations, Request for Information, Request for Quotation, Request for Proposal and seller’s responses.

260
Q

Terms and Acronyms

Procurement Management Plan [Output/Input]

A

Begins with P: The document that describes how procurement processes from developing procurement documentation through contract closure will be managed.

261
Q

Terms and Acronyms

Product

A

Begins with P: An artifact that is produced, is quantifiable, and can be either an end item in itself or a component item. Additional words for products are materiel and goods. Contrast with result and service. See also deliverable.

262
Q

Terms and Acronyms

Product Life Cycle

A

Begins with P: A collection of generally sequential, non-overlapping product phases* whose name and number are determined by the manufacturing and control needs of the organ/eat/on. The last product life cycle phase for a product is generally the product’s deterioration and death. Generally, a project life cycle is contained within one or more product life cycles

263
Q

Terms and Acronyms

Product Scope

A

Begins with P: The features and functions that characterize a product, service or result. Product Scope Description. The documented narrative description of the product scope.

264
Q

Terms and Acronyms

Program

A

Begins with P: A group of related projects managed in a coordinated way to obtain benefits and control not available from managing them individually. Programs may include elements of related work outside of the scope of the discrete projects in the program.

265
Q

Terms and Acronyms

Program Management

A

Begins with P: The centralized coordinated management of a program to achieve the program’s strategic objectives and benefits.

266
Q

Terms and Acronyms

Program Management Office (PMO)

A

Begins with P: The centralized management of a particular program or programs such that corporate benefit is realized by the sharing of resources, methodologies, tools, and techniques, and related high-level project management focus.See also project management office.

267
Q

Terms and Acronyms

Progressive Elaboration [Technique]

A

Begins with P: Continuously improving and detailing a plan as more detailed and specific information and more accurate estimates become available as the project progresses, and thereby producing more accurate and complete plans that result from the successive iterations of the planning process.

268
Q

Terms and Acronyms

Project

A

Begins with P: A temporary endeavor undertaken to create a unique product, service, or result.

269
Q

Terms and Acronyms

Project Calendar

A

Begins with P: A calendar of working days or shifts that establishes those dates on which schedule activities are worked and nonworking days that determine those dates on which schedule activities are idle. Typically defines holidays, weekends and shift hours. See also resource calendar.

270
Q

Terms and Acronyms

Project Charter [Output/Input]

A

Begins with P: A document issued by the project initiator or sponsor that formally authorizes the existence of a project, and provides the project manager with the authority to apply organizational resources to project activities.

271
Q

Terms and Acronyms

Project Communications Management [Knowledge Area]

A

Begins with P: See Appendix F. Project Cost Management [Knowledge Areal. See Appendix F.

272
Q

Terms and Acronyms

Project Human Resource Management [Knowledge Areal

A

Begins with P: See Appendix F.

273
Q

Terms and Acronyms

Project Initiation

A

Begins with P: Launching a process that can result in the authorization and scope definition of a new project.

274
Q

Terms and Acronyms

Project Integration Management [Knowledge Area]

A

Begins with P: See Appendix F.

275
Q

Terms and Acronyms

Project Life Cycle

A

Begins with P: A collection of generally sequential project phases whose name and number are determined by the control needs of the organization or organizations involved in the project. A life cycle can be documented with a methodology-.

276
Q

Terms and Acronyms

Project Management (PM)

A

Begins with P: The application of knowledge, skills, tools, and techniques to project activities* to meet the project requirements.

277
Q

Terms and Acronyms

Project Management Body of Knowledge (PMBOKR`)

A

Begins with P: An inclusive term that describes the sum of knowledge within the profession of project management. As with other professions such as law, medicine, and accounting, the body of knowledge rests with the practitioners and academics that apply and advance it. The complete project management body of knowledge includes proven traditional practices that are widely applied and innovative practices that are emerging in the profession. The body of knowledge includes both published and unpublished material. The PMBOK is constantly evolving.

278
Q

Terms and Acronyms

Project Management Information System (Pil’IIS) [Tool]

A

Begins with P: An information system consisting of the tools and techniques used to gather, integrate, and disseminate the outputs of project management processes. It is used to support all aspects of the project from initiating through closing, and can include both manual and automated

279
Q

Terms and Acronyms

Project Management Knowledge Area

A

Begins with P: An identified area of project management defined by its knowledge requirements and described in terms of its component processes, practices, inputs, outputs, tools, and techniques.

280
Q

Terms and Acronyms

Project Management Office (PMO)

A

Begins with P: An organizational body or entity assigned various responsibilities related to the centralized and coordinated management of those projects under its domain. The responsibilities of a PMO can range from providing project management support functions to actually being responsible for the direct management of a project. See also program management office.

281
Q

Terms and Acronyms

Project Management Plan [Outputllnput]

A

Begins with P: A formal, approved document that defines how the projected is executed, monitored and controlled. It may be summary or detailed and may be composed of’ one or more subsidiary management plans and other planning documents.

282
Q

Terms and Acronyms

Project Management Process

A

Begins with P: One of the 44 processes, unique to project management and described in the PPIBOK” Guide.

283
Q

Terms and Acronyms

Project Management Process Group

A

Begins with P: A logical grouping of the project management processes described in the .PMI3OK” Guide. The project management process groups include initiating processes, planning processes, executing processes, monitoring and controlling processes, and closing processes. Collectively, these five groups are required for any project, have clear internal dependencies, and must be performed in the same sequence on each project, independent of the application area or the specifics of the applied project life cycle. Project management process groups are not project phases.

284
Q

Terms and Acronyms

Project Management Professional (PM”)

A

Begins with P: A person certified as a PMP7 by the Project Management Institute (PMI).

285
Q

Terms and Acronyms

Project Management Sofhvarc [Wool]

A

Begins with P: A class of computer software applications specifically designed to aid the project management teen with planning, monitoring, and controlling the project, including: cost estimating, scheduling, communications, collaboration. configuration management, document control. records management, and risk analysis.

286
Q

Terms and Acronyms

Project Management System [Tool]

A

Begins with P: The aggregation of the processes, tools, techniques, methodologies, resources, and procedures to manage a project. The system is documented in the project management plan and its content will vary depending upon the application area, organizational influence, complexity of the project, and the availability of existing systems. A project management system, which can be formal or informal, aids a project manager in effectively guiding a project to completion. A project management system is a set of processes and the related monitoring and control functions that are consolidated and combined into a functioning, unified whole.

287
Q

Terms and Acronyms

Project Management Team

A

Begins with P: The members of the project team who are directly involved in project management activities. On some smaller projects, the project management team may include virtually all of the project team members.

288
Q

Terms and Acronyms

Project Manager (PM)

A

Begins with P: The person assigned by the petfornring organization to achieve the project objectives*.

289
Q

Terms and Acronyms

Project Organization Chart [Output/Input]

A

Begins with P: A document that graphically depicts the project team members and their interrelationships for a specific project.

290
Q

Terms and Acronyms

Project Phase

A

Begins with P: A collection of logically related project activities, usually culminating in the completion of a major deliverable. Project phases (also called phases) are mainly completed sequentially, but can overlap in some project situations. Phases can be subdivided into subphases and then components, this hierarchy. if the project or portions of the project are divided into phases, is contained in the work breakdown structure. A project phase is a component of a project life cycle. A project phase is not a project management process group.

291
Q

Terms and Acronyms

Project Process Groups

A

Begins with P: The five process groups required for any project that have clear dependencies and that are required to be performed in the same sequence on each project, independent of the application area or the specifics of the applied project Ii i’ cycle. The process groups are initiating, planning, executing, monitoring and controlling, and closing.

292
Q

Terms and Acronyms

Project Procurement Management [Knowledge Area]

A

Begins with P: See Appendix F.

293
Q

Terms and Acronyms

Project Quality Management [Knowledge Area]

A

Begins with P: See Appendix F. Project Risk Management [Knowledge Area]. See Appendix F.

294
Q

Terms and Acronyms

Project Schedule [Output/Input]

A

Begins with P: The planned dates for performing schedule activities and the planned dates for meeting schedule milestones.

295
Q

Terms and Acronyms

Project Schedule Network Diagram [Output/Input]

A

Begins with P: Any schematic display of the logical relationships among the project schedule activities. Always drawn from left to right to reflect project work chronology.

296
Q

Terms and Acronyms

Project Scope

A

Begins with P: The work that must be performed to deliver a product, service, or result with the specified features and functions.

297
Q

Terms and Acronyms

Project Scope Management [Knowledge Area]

A

Begins with P: See Appendix F.

298
Q

Terms and Acronyms

Project Scope Management Plan [Output/Input]

A

Begins with P: The document that describes how the project scope will be defined, developed, and verified and how the work breakdown structure will be created and defined, and that provides guidance on how the project snipe will be managed and controlled by the project management team. It is contained in or is a subsidiary plan of the project management plan. The project scope management plan can be informal and broadly framed, or formal and highly detailed, based on the needs of the project.

299
Q

Terms and Acronyms

Project Scope Statement [Outputllnput]

A

Begins with P: The narrative description of the project scope, including major deliverables, project objectives, project assumptions, project constraints, and a statement of work. that provides a documented basis for making future project decisions and for confirming or developing a common understanding of project scope among the stakeholders. The definition of the project scope - what needs to be accomplished.

300
Q

Terms and Acronyms

Project Sponsor

A

Begins with P: See .sponsor.

301
Q

Terms and Acronyms

Project Stakeholder

A

Begins with P: See stakeholder.

302
Q

Terms and Acronyms

Project Summary Work Breakdown Structure (PSWBS) [Tool]

A

Begins with P: A work breakdown structure for the project that is only developed down to the subproject level of detail within some legs of the WBS, and where the detail of those subprojects are provided by use of contract work breakdown structures.

303
Q

Terms and Acronyms

Project Team

A

Begins with P: All the project team members, including the project management team, the project manager and, for some projects, the project sponsor.

304
Q

Terms and Acronyms

Project Team Directory

A

Begins with P: A documented list of project team members, their project roles and communication information.

305
Q

Terms and Acronyms

Project Team Members

A

Begins with P: The persons who report either directly or indirectly to the project manager, and who are responsible for perforating project work as a regular part of their assigned duties.

306
Q

Terms and Acronyms

Project Time Management [Knowledge Area]

A

Begins with P: See Appendix F. Project Work. See work.

307
Q

Terms and Acronyms

Projectized Organization

A

Begins with P: Any organizational structure in which the project manager has full authority to assign priorities, apply resources, and direct the work of persons assigned to the project.

308
Q

Terms and Acronyms

Qualitative Risk Analysis [Process]

A

Begins with Q: The process of prioritizing risks for subsequent further analysis or action by assessing and combining their probability of occurrence and impact.

309
Q

Terms and Acronyms

Quality

A

Begins with Q: The degree to which a set of inherent characteristics fulfills requirements.

310
Q

Terms and Acronyms

Quality Management Plan [Outputllnput]

A

Begins with Q: The quality management plan describes how the project management team will implement the performing organization’s quality policy. The quality management plan is a component or a subsidiary plan of the project management plan. The quality management plan may be formal or informal, highly detailed, or broadly framed, based on the requirements of the project.

311
Q

Terms and Acronyms

Quality Planning [Process]

A

Begins with Q: The process of identifying which quality standards are relevant to the project and determining how to satisfy them.

312
Q

Terms and Acronyms

Quantitative Risk Analysis [Process]

A

Begins with Q: The process of numerically analyzing the effect on overall project objectives of identified risks.

313
Q

Terms and Acronyms

Regulation

A

Begins with R: Requirements imposed by a governmental body. These requirements can establish product, process or service characteristics

314
Q

Terms and Acronyms

Reliability

A

Begins with R: The probability of a product performing its intended function under specific conditions for a given period of time

315
Q

Terms and Acronyms

Remaining Duration (RD)

A

Begins with R: The time in calendar units, between the data date of the project schedule and the finish date of a schedule activity that has an actual start date. This represents the time needed to complete a schedule activity where the work is in progress.

316
Q

Terms and Acronyms

Request for Information

A

Begins with R: A type of procurement document whereby the buyer requests a potential seller to provide various pieces of information related to a product or service or seller capability.

317
Q

Terms and Acronyms

Request for Proposal (REP)

A

Begins with R: A type of procurement document used to request proposals from prospective sellers of products or services. In some application areas, it may have a narrower or more specific meaning.

318
Q

Terms and Acronyms

Request for Quotation (RFQ)

A

Begins with R: A type of procurement document used to request price quotations from prospective sellers of common or standard products or services. Sometimes used in place of request for proposal and in some application areas, it may have a narrower or more specific meaning.

319
Q

Terms and Acronyms

Request Seller Responses [Process]

A

Begins with R: The process of obtaining information, quotations, bids, offers, or proposals, as appropriate.

320
Q

Terms and Acronyms

Requested Change [Output/Input]

A

Begins with R: A formally documented change request that is submitted for approval to the integrated change control process. Contrast with approved change request.

321
Q

Terms and Acronyms

Requirement

A

Begins with R: A condition or capability that must be met or possessed by a sti.stem, product, service, result, or component to satisfy a contract, standard, specification, or other

322
Q

Terms and Acronyms

formally imposed documents

A

Begins with f: Requirements include the quantified and documented needs, wants, and expectations of the sponsor, customer, and other stakeholders.

323
Q

Terms and Acronyms

Reserve

A

Begins with R: A provision in the project management pkm to mitigate cost and/or schedule risk. Often used with a modifier (e.g., management reserve, contingency reserve) to provide further detail on what types of risk are meant to be mitigated. The specific meaning of the modified term varies by application area.

324
Q

Terms and Acronyms

Reserve Analysis [Technique]

A

Begins with R: An analytical technique to determine the essential features and relationships of components in the project management plan to establish a reserve for the schedule duration. budget, estimated cost, or,ftmds for a project.

325
Q

Terms and Acronyms

Residual Risk

A

Begins with R: A risk that remains after risk responses have been implemented.

326
Q

Terms and Acronyms

Resource

A

Begins with R: Skilled human resources (specific disciplines either individually or in crews or teams), equipment, services, supplies, commodities, materiel, budgets, or funds.

327
Q

Terms and Acronyms

Resource Breakdown Structure (RBS)

A

Begins with R: A hierarchical structure of resources by resource category and resource type used in resource leveling schedules and to develop resource-limited schedules, and which may be used to identify and analyze project human resource assignments.

328
Q

Terms and Acronyms

Resource Calendar

A

Begins with R: A calendar of working days and nonworking days that determines those dates on which each specific resource is idle or can be active, Typically defines resource specific holidays and resource availability periods. See also project calendar.

329
Q

Terms and Acronyms

Resource-Constrained Schedule

A

Begins with R: See resource-limited schedule.

330
Q

Terms and Acronyms

Resource Histogram

A

Begins with R: A bar chart showing the amount of time that a resource is scheduled to work over a series of time periods. Resource availability may be depicted as a line for comparison purposes. Contrasting bars may show actual amounts of resource used as the project progresses.

331
Q

Terms and Acronyms

Resource Leveling [Technique]

A

Begins with R: Any form of schedule network analysis in which scheduling decisions (start and finish dates) are driven by resource constraints (e.g., limited resource availability or difficult-to-manage changes in resource availability levels).

332
Q

Terms and Acronyms

Resource-Limited Schedule

A

Begins with R: A project schedule whose schedule activity, scheduled start dates and scheduled finish dates reflect expected resource availability. A resource-limited schedule does not have any early or late start or finish dates. The resource-limited schedule total float is determined by calculating the difference between the critical path method late finish date` and the resource-limited scheduled finish date. Sometimes called resource-constrained schedule. See also resource leveling.

333
Q

Terms and Acronyms

Resource Planning

A

Begins with R: See activity resource estimating.

334
Q

Terms and Acronyms

Responsibility Assignment Matrix (RAM) [Tool]

A

Begins with R: A structure that relates the project organizational breakdown structure to the work breakdown structure to help ensure that each component of the project’s scope of work is assigned to a responsible person/team.

335
Q

Terms and Acronyms

Result

A

Begins with R: An output from performing project management processes and activities. Results include outcomes (e.g., integrated systems, revised process, restructured organi_ation, tests, trained personnel, etc.) and documents (e.g., policies, plans, studies, procedures, specifications, reports, etc.). Contrast with product and service. See also deliverable.

336
Q

Terms and Acronyms

Retainage

A

Begins with R: A portion of a contract payment that is withheld until contract completion to ensure full performance of the contract terms.

337
Q

Terms and Acronyms

Rework

A

Begins with R: Action taken to bring a defective or nonconforming component into compliance with requirements or specifications.

338
Q

Terms and Acronyms

Risk

A

Begins with R: An uncertain event or condition that, if it occurs, has a positive or negative effect on a project’s objectives. See also risk category and risk breakdown structure.

339
Q

Terms and Acronyms

Risk Acceptance [Technique]

A

Begins with R: A risk response planning teclnniquue* that indicates that the project team has decided not to change the project management plan to deal with a risk. or is unable to identify any other suitable response strategy.

340
Q

Terms and Acronyms

Risk Avoidance [Technique]

A

Begins with R: A risk response planning technique* for a threat that creates changes to the project management plan that are meant to either eliminate the risk or to protect the project objectives from its impact. Generally, risk avoidance involves relaxing the time, cost, scope, or quality objectives.

341
Q

Terms and Acronyms

Risk Breakdown Structure (RBS) [Tool]

A

Begins with R: A hierarchically organized depiction of the identified project risks* arranged by risk category and subcategory that identifies the various areas and causes of potential risks. The risk breakdown structure is often tailored to specific project types.

342
Q

Terms and Acronyms

Risk Category

A

Begins with R: A group of potential causes of risk. Risk causes may be grouped into categories such as technical, external, organizational, environmental. or project management. A category may include subcategories such as technical maturity, weather, or aggressive estimating. See also risk breakdown structure.

343
Q

Terms and Acronyms

Risk Database

A

Begins with R: A repository that provides for collection, maintenance, and analysis of data gathered and used in the risk management processes.

344
Q

Terms and Acronyms

Risk Identification [Process]

A

Begins with R: The process of determining which risks might affect the project and documenting their characteristics.

345
Q

Terms and Acronyms

Risk Management Plan [Output/Input]

A

Begins with R: The document describing how project risk management will be structured and performed on the project. It is contained in or is a subsidiary plan of the project management plan. The risk management plan can be informal and broadly framed, or formal and highly detailed, based on the needs of the project. Information in the risk management plan varies by application area and project size. The risk management plan is different from the risk register that contains the list of project risks, the results of risk analysis, and the risk responses.

346
Q

Terms and Acronyms

Risk Management Planning [Process]

A

Begins with R: The process of deciding how to approach, plan, and execute risk management activities for a project.

347
Q

Terms and Acronyms

Risk Mitigation [Technique]

A

Begins with R: A risk response planning technique* associated with threats that seeks to reduce the probability of occurrence or impact of a risk to below an acceptable threshold.

348
Q

Terms and Acronyms

Risk Monitoring and Control [Process]

A

Begins with R: The process of tracking identified risks, monitoring residual risks’, identifying new risks, executing risk response plans, and evaluating their effectiveness throughout the project life cycle.

349
Q

Terms and Acronyms

Risk Register [Output/Input]

A

Begins with R: The document containing the results of’ the qualitative risk analysis, quantitative risk analysis, and risk response planning. The risk register details all identified risks, including description, category, cause, probability of occurring, impact(s) on objectives, proposed responses, owners, and current status. The risk register is a component of the project management plan.

350
Q

Terms and Acronyms

Risk Response Planning [Process]

A

Begins with R: The process of developing options and actions to enhance opportunities and to reduce threats to project objectives.

351
Q

Terms and Acronyms

Risk Transference [Technique]

A

Begins with R: A risk response planning technique* that shifts the impact of a threat to a third party, together with ownership of the response.

352
Q

Terms and Acronyms

Role

A

Begins with R: A defined function to be performed by a project team member, such as testing, filing, inspecting, coding.

353
Q

Terms and Acronyms

Rolling Wave Planning [Technique]

A

Begins with R: A form of progressive elaboration planning where the work to be accomplished in the near term is planned in detail at a low level of the work breakdown structure, while the work far in the future is planned at a relatively high level of the work breakdown structure, but the detailed planning of the work to be performed within another one or two periods in the near future is done as work is being completed during the current period.

354
Q

Terms and Acronyms

Root Cause Analysis [Technique]

A

Begins with R: An analytical technique used to determine the basic underlying reason that causes a variance or a defect or a risk. A root cause may underlie more than one variance or defect or risk.

355
Q

Terms and Acronyms

Schedule

A

Begins with S: See project schedule and see also schedule model.

356
Q

Terms and Acronyms

Schedule Activity

A

Begins with S: A discrete scheduled component of work performed during the course of a project. A schedule activity normally has an estimated duration, an estimated cost, and estimated resource requirements. Schedule activities are connected to other schedule activities or schedule milestones with logical relationships, and are decomposed from work packages.

357
Q

Terms and Acronyms

Schedule Analysis

A

Begins with S: See schedule network analysis.

358
Q

Terms and Acronyms

Schedule Compression [Technique

A

Begins with S: Shortening the project schedule duration without reducing the project scope. See also crashing and first tracking.

359
Q

Terms and Acronyms

Schedule Control [Process]

A

Begins with S: The process of controlling changes to the project schedule.

360
Q

Terms and Acronyms

Schedule Development [Process]

A

Begins with S: The process of analyzing schedule activity sequences, schedule activity durations, resource requirements, and schedule constraints to create the project schedule.

361
Q

Terms and Acronyms

Schedule Management Plan [Output/Input]

A

Begins with S: The document that establishes criteria and the activities for developing and controlling the project schedule. It is contained in, or is a subsidiary plan of, the project management plan. The schedule management plan may be formal or informal, highly detailed or broadly framed. based on the needs of the project.

362
Q

Terms and Acronyms

Schedule Milestone

A

Begins with S: A significant event in the project schedule, such as an event restraining future work or marking the completion of a major deliverable. A schedule milestone has zero duration. Sometimes called a milestone activity. See also milestone.

363
Q

Terms and Acronyms

Schedule Model [Tool]

A

Begins with S: A model used in conjunction with manual methods or project management softurare to perform schedule network analysis to generate the project schedule for use in managing the execution of a project. See also project schedule.

364
Q

Terms and Acronyms

Schedule Network Analysis [Technique]

A

Begins with S: The technique of identifying early and late start dates, as well as early and late finish dates, for the uncompleted portions of project schedule activities. See also critical path method, critical chain method what-if analysis, and resource leveling.

365
Q

Terms and Acronyms

Schedule Performance Index (SPI)

A

Begins with S: A measure of schedule efficiency on a project. It is the ratio of earned value (EV) to planned value (PV). The SPI = EV divided by PV. An SPI equal to or greater than one indicates a favorable condition and a value of less than one indicates an unfavorable condition. See also earned value management.

366
Q

Terms and Acronyms

Schedule Variance (SV)

A

Begins with S: A measure of schedule performance on a project. It is the algebraic difference between the earned value (EV) and the planned value (PV). SV = EV minus PV. See also earned value management.

367
Q

Terms and Acronyms

Scheduled Finish Date (SF)

A

Begins with S: The point in time that work was scheduled to finish on a schedule activity. The scheduled finish date is normally within the range of dates delimited by the early finish date and the late finish date. it may reflect resource leveling of scarce resources. Sometimes called planned finish date.

368
Q

Terms and Acronyms

Scheduled Start Date (SS)

A

Begins with S: The point in time that work was scheduled to start on a schedule activity. The scheduled start date is normally within the range of dates delimited by the early start date and the late start date. It may reflect resource leveling of scarce resources. Sometimes called planned start date.

369
Q

Terms and Acronyms

Scope

A

Begins with S: The sum of the products, services, and results to be provided as a project. See also project scope and product scope.

370
Q

Terms and Acronyms

Scope Baseline

A

Begins with S: See baseline.

371
Q

Terms and Acronyms

Scope Change

A

Begins with S: Any change to the project scope. A scope change almost always requires an adjustment to the project cost or schedule.

372
Q

Terms and Acronyms

Scope Control [Process]

A

Begins with S: The process of controlling changes to the project scope.

373
Q

Terms and Acronyms

Scope Creep

A

Begins with S: Adding features and functionality (project scope) without addressing the effects on time, costs, and resources, or without customer approval.

374
Q

Terms and Acronyms

Scope Definition [Process]

A

Begins with S: The process of developing a detailed project scope statement as the basis for future project decisions.

375
Q

Terms and Acronyms

Scope Planning [Process

A

Begins with S: The process of creating a project scope management plan.

376
Q

Terms and Acronyms

Scope Verification [Process]

A

Begins with S: The process of formalizing acceptance of the completed project deliverables.

377
Q

Terms and Acronyms

S-Curve

A

Begins with S: Graphic display of cumulative costs, labor hours, percentage of work, or other quantities, plotted against time. Used to depict planned value, earned value, and actual cost of project work. The name derives from the S-like shape of the curve (flatter at the beginning and end, steeper in the middle) produced on a project that starts slowly, accelerates, and then tails off. Also a term for the cumulative likelihood distribution that is a result of a sunu/ation, a tool of quantitative risk analysis.

378
Q

Terms and Acronyms

Secondary Risk

A

Begins with S: A risk that arises as a direct result of implementing a risk response.

379
Q

Terms and Acronyms

Select Sellers [Process]

A

Begins with S: The process of reviewing offers, choosing from among potential sellers, and negotiating a written contract with a seller.

380
Q

Terms and Acronyms

Seller

A

Begins with S: A provider or supplier of products, services, or results to an organization.

381
Q

Terms and Acronyms

Sensitivity Analysis

A

Begins with S: A quantitative risk analysis and modeling technique used to help determine which risks have the most potential impact on the project. It examines the extent to which the uncertainty of each project element affects the objective being examined when all other uncertain elements are held at their baseline values. The typical display of results is in the form of a tornado diagram.

382
Q

Terms and Acronyms

Service

A

Begins with S: Useful work performed that does not produce a tangible product or result, such as performing any of the business functions supporting production or distribution. Contrast with product and result. See also deliverable.

383
Q

Terms and Acronyms

Should-Cost Estimate

A

Begins with S: An estimate of the cost of a product or service used to provide an assessment of the reasonableness of a prospective seller’s proposed cost.

384
Q

Terms and Acronyms

Simulation

A

Begins with S: A simulation uses a project model that translates the uncertainties specified at a detailed level into their potential impact on objectives that are expressed at the level of the total project. Project simulations use computer models and estimates of risk, usually expressed as a probability distribution of possible costs or durations at a detailed work level, and are typically performed using Monte Carlo analysis.

385
Q

Terms and Acronyms

Skill

A

Begins with S: Ability to use kno’irledge, a developed aptitude, and/or a capability to effectively and readily execute or perform an activity%.

386
Q

Terms and Acronyms

Slack

A

Begins with S: See total float and f •ee float.

387
Q

Terms and Acronyms

Special Cause

A

Begins with S: A source of variation that is not inherent in the system, is not predictable, and is intermittent. It can be assigned to a defect in the system. On a control chart, points beyond the control limits, or non-random patterns within the control limits, indicate it. Also referred to as assignable cause. Contrast with common cause.

388
Q

Terms and Acronyms

Specification

A

Begins with S: A document that specifies, in a complete, precise, verifiable manner, the requirements, design, behavior, or other characteristics of a system, component, product, result, or service and. often, the procedures for determining whether these provisions have been satisfied. Examples are: requirement specification, design specification, product specification, and test specification.

389
Q

Terms and Acronyms

Specification Limits

A

Begins with S: The area, on either side of the centerline, or mean, of data plotted on a control chart that meets the customer’s requirements for a product or service. This area may be greater than or less than the area defined by the control limits. See also control limits.

390
Q

Terms and Acronyms

Sponsor

A

Begins with S: The person or group that provides the financial resources, in cash or in kind, for the project.

391
Q

Terms and Acronyms

Staffing Management Plan [Process]

A

Begins with S: The document that describes when and how human resource requirements will be met. It is contained in, or is a subsidiary plan of, the project management plan. The staffing management plan can be informal and broadly framed, or formal and highly detailed, based on the needs of the project. Information in the staffing management plan varies by application area and project size.

392
Q

Terms and Acronyms

Stakeholder

A

Begins with S: Person or organization (e.g., customer, sponsor, peiforming organization, or the public) that is actively involved in the project, or whose interests may be positively or negatively affected by execution or completion of the project. A stakeholder may also exert influence over the project and its deliverables.

393
Q

Terms and Acronyms

Standard

A

Begins with S: A document established by consensus and approved by a recognized body that provides, for common and repeated use, rules, guidelines or characteristics for activities or their results, aimed at the achievement of the optimum degree of order in a given context.

394
Q

Terms and Acronyms

Start Date

A

Begins with S: A point in time associated with a schedule activity’s start, usually qualified by one of the following: actual, planned, estimated, scheduled, early, late, target, baseline. or current.

395
Q

Terms and Acronyms

Start-to-Finish (SF)

A

Begins with S: The logical relationship where completion of the successor schedule activity is dependent upon the initiation of the predecessor schedule activity. See also logical relationship.

396
Q

Terms and Acronyms

Start-to-Start (SS)

A

Begins with S: The logical relationship where initiation of the work of the successor schedule activity depends upon the initiation of the work of the predecessor schedule activity. See also logical relationship.

397
Q

Terms and Acronyms

Statement of Work (SOW)

A

Begins with S: A narrative description of products, services, or results to be supplied.

398
Q

Terms and Acronyms

Strengths, Weaknesses, Opportunities, and Threats (SWOT) Analysis

A

Begins with S: This information gathering technique examines the project from the perspective of each project’s strengths, weaknesses, opportunities, and threats to increase the breadth of the risks considered by risk management.

399
Q

Terms and Acronyms

Subnetwork

A

Begins with S: A subdivision (fragment) of a project schedule network diagram, usually representing a subproject or a work package. Often used to illustrate or study some potential or proposed schedule condition, such as changes in preferential schedule logic or project scope.

400
Q

Terms and Acronyms

Subphase

A

Begins with S: A subdivision of a phase.

401
Q

Terms and Acronyms

Subproject

A

Begins with S: A smaller portion of the overall project created when a project is subdivided into more manageable components or pieces. Subprojects are usually represented in the work breakdown structure. A subproject can be referred to as a project, managed as a project, and acquired from a seller. May be referred to as a subnetwork in a project schedule network diagram.

402
Q

Terms and Acronyms

Successor

A

Begins with S: See successor activity.

403
Q

Terms and Acronyms

Successor Activity

A

Begins with S: The schedule activity that follows a predecessor activity, as determined by their logical relationship.

404
Q

Terms and Acronyms

Summary Activity

A

Begins with S: A group of related schedule activities aggregated at some summary level. and displayed/reported as a single activity at that summary level. See also subproject and subnetwork.

405
Q

Terms and Acronyms

System

A

Begins with S: An integrated set of regularly interacting or interdependent components created to accomplish a defined objective, with defined and maintained relationships among its components, and the whole producing or operating better than the simple sum of its components. Systems may be either physically process based or management process based, or more commonly a combination of both. Systems for project mcmagenrent are composed of project management processes, techniques, methodologies, and tools operated by the project management team.

406
Q

Terms and Acronyms

Target Completion Date (TC)

A

Begins with T: An imposed date that constrains or otherwise modifies the schedule network analysis.

407
Q

Terms and Acronyms

Target Finish Date (TF)

A

Begins with T: The date that work is planned (targeted) to finish on a schedule activity.

408
Q

Terms and Acronyms

Target Schedule

A

Begins with T: A schedule adopted for comparison purposes during schedule network analysis, which can be different from the baseline schedule. See also baseline.

409
Q

Terms and Acronyms

Target Start Date (TS)

A

Begins with T: The date that work is planned (targeted) to start on a schedule activity.

410
Q

Terms and Acronyms

Task

A

Begins with T: A term for work whose meaning and placement within a structured plan for project work varies by the application area, industry, and brand of project management software.

411
Q

Terms and Acronyms

Team Members

A

Begins with T: See project team members.

412
Q

Terms and Acronyms

Technical Performance Measurement [Technique]

A

Begins with T: A performance measurement technique that compares technical accomplishments during project execution to the project management plan’s schedule of planned technical achievements. It may use key technical parameters of the product produced by the project as a quality metric. The achieved metric values are part of the work perfbrmance information.

413
Q

Terms and Acronyms

Technique

A

Begins with T: A defined systematic procedure employed by a human resource to perform an activity to produce a product or result or deliver a service, and that may employ one or more tools.

414
Q

Terms and Acronyms

Template

A

Begins with T: A partially complete document in a predefined format that provides a defined structure for collecting, organizing and presenting information and data. Templates are often based upon documents created during prior projects. Templates can reduce the effort needed to perform work and increase the consistency of results.

415
Q

Terms and Acronyms

Threat

A

Begins with T: A condition or situation unfavorable to the project, a negative set of circumstances, a negative set of events, a risk that Nvill have a negative impact on a project objective if it occurs, or a possibility for negative changes. Contrast with opporvunity.

416
Q

Terms and Acronyms

Three-Point Estimate [Technique]

A

Begins with T: An analytical technique that uses three cost or duration estimates to represent the optimistic. most likely, and pessimistic scenarios. This technique is applied to improve the accuracy of the estimates of cost or duration when the underlying activity or cost component is uncertain.

417
Q

Terms and Acronyms

Threshold

A

Begins with T: A cost, time, quality, technical, or resource value used as a parameter, and which may be included in product specifications. Crossing the threshold should trigger some action, such as generating an exception report.

418
Q

Terms and Acronyms

Time and Material (T&M) Contract

A

Begins with T: A type of contract that is a hybrid contractual arrangement containing aspects of both cost-reimbursable and fixed price contracts. Time and material contracts resemble cost-reimbursable type arrangements in that they have no definitive end, because the full value of the arrangement is not defined at the time of the award. Thus, time and material contracts can grow in contract value as if they were cost-reimbursable-type arrangements. Conversely, time and material arrangements can also resemble fixed-price arrangements. For example, the unit rates are preset by the buyer and seller, when both parties agree on the rates for the category of senior engineers.

419
Q

Terms and Acronyms

Time-Now Date

A

Begins with T: See data date.

420
Q

Terms and Acronyms

Time-Scaled Schedule Network Diagram [Tool]

A

Begins with T: Any project schedule network diagram drawn in such a way that the positioning and length of the schedule activity represents its duration. Essentially, it is a har chart that includes schedule network logic.

421
Q

Terms and Acronyms

Tool

A

Begins with T: Something tangible, such as a template or software program. used in performing an activity to produce a product or result.

422
Q

Terms and Acronyms

Total Float (TF)

A

Begins with T: The total amount of time that a schedule activity may be delayed from its early start date without delaying the project finish (cite, or violating a schedule constraint. Calculated using the critical path method technique and determining the difference between the early finish dates and late finish dates. See also free float.

423
Q

Terms and Acronyms

Total Quality Management (TQNT) [Technique]

A

Begins with T: A common approach to implementing a quality improvement program within an organization.

424
Q

Terms and Acronyms

Trend Analysis [Technique]

A

Begins with T: An analytical technique that uses mathematical models to forecast future outcomes based on historical results. It is a method of determining the variance from a baseline of a budget, cost, schedule, or scope parameter by using prior progress reporting periods’ data and projecting how much that parameter’s variance from baseline might be at some future point in the project if no changes are made in executing the project.

425
Q

Terms and Acronyms

Triggers

A

Begins with T: Indications that a risk has occurred or is about to occur. Triggers may be discovered in the risk identification process and watched in the risk monitoring and control process. Triggers are sometimes called risk symptoms or warning signs.

426
Q

Terms and Acronyms

Triple Constraint

A

Begins with T: A framework for evaluating competing demands. The triple constraint is often depicted as a triangle where one of the sides or one of the corners represent one of the parameters being managed by the project team.

427
Q

Terms and Acronyms

User

A

Begins with U: The person or organization that will use the project’s product or service. See also customer.

428
Q

Terms and Acronyms

Validation [Technique]

A

Begins with V: The technique of evaluating a component or product during or at the end of a phase or project to ensure it complies with the specified requirements. Contrast with verification.

429
Q

Terms and Acronyms

Value Engineering (ATE)

A

Begins with V: A creative approach used to optimize project life cycle costs, save time, increase profits, improve quality. expand market share, solve problems. and/or use resources more effectively.

430
Q

Terms and Acronyms

Variance

A

Begins with V: A quantifiable deviation, departure, or divergence away from a known baseline or expected value.

431
Q

Terms and Acronyms

Variance Analysis [Technique]

A

Begins with V: A method for resolving the total variance in the set of scope, cost, and schedule variables into specific component variances that are associated with defined factors affecting the scope, cost, and schedule variables.

432
Q

Terms and Acronyms

Verification [Technique]

A

Begins with V: The technique of evaluating a component or product at the end of a phase or project to assure or confirm it satisfies the conditions imposed. Contrast with validation.

433
Q

Terms and Acronyms

Virtual Team

A

Begins with V: A group of persons with a shared objective who fulfill their roles with little or no time spent meeting face to face. Various forms of technology are often used to facilitate communication among team members. Virtual teams can be comprised of persons separated by great distances.

434
Q

Terms and Acronyms

Voice of the Customer

A

Begins with V: A planning technique used to provide products, services, and results that truly reflect customer requirements by translating those customer requirements into the appropriate technical requirements for each phase of project product development.

435
Q

Terms and Acronyms

War Room

A

Begins with W: A room used for project conferences and planning, often displaying charts of cost, schedule status, and other key project data.

436
Q

Terms and Acronyms

Work

A

Begins with W: Sustained physical or mental effort, exertion, or exercise of skill to overcome obstacles and achieve an objective.

437
Q

Terms and Acronyms

Work Authorization [Technique]

A

Begins with W: A permission and direction, typically written, to begin work on a specific schedule activity or work package or control account. It is a method for sanctioning project work to ensure that the work is done by the identified organization, at the right time, and in the proper sequence.

438
Q

Terms and Acronyms

Work Authorization System [Tool]

A

Begins with W: A subsystem of the overall project management system. It is a collection of formal documented procedures that defines how project work will be authorized (committed) to ensure that the work is done by the identified organization, at the right time, and in the proper sequence. It includes the steps, documents, tracking system, and defined approval levels needed to issue work authorizations.

439
Q

Terms and Acronyms

Work Breakdown Structure (WBS) [Output/Input]

A

Begins with W: A deliverable-oriented hierarchical decomposition of the work to be executed by the project team to accomplish the project objectives and create the required deliverables. It organizes and defines the total scope of the project. Each descending level represents an increasingly detailed definition of the project work. The WBS is decomposed into work packages. The deliverable orientation of the hierarchy includes both internal and external deliverables. See also work package, control account, contract work breakdown structure, and project summary work breakdown structure.

440
Q

Terms and Acronyms

Work Breakdown Structure Component

A

Begins with W: An entry in the work breakdown structure that can be at any level.

441
Q

Terms and Acronyms

Work Breakdown Structure Dictionary [Output/Input]

A

Begins with W: A document that describes each component in the work breakdown structure (WBS). For each WBS component, the WBS dictionary includes a brief definition of the scope or statement of work, defined deliverable(s), a list of associated activities, and a list of milestones. Other information may include: responsible organization, start and end dates, resources required, an estimate of cast, charge number, contract information, quality requirements, and technical references to facilitate performance of the work.

442
Q

Terms and Acronyms

Work Item

A

Begins with W: Term no longer in common usage. See activity and schedule activity.

443
Q

Terms and Acronyms

Work Package

A

Begins with W: A deliverable or project work component at the lowest level of each branch of the work breakdown structure. The work package includes the schedule activities and schedule milestones required to complete the work package deliverable or project work component. See also control account.

444
Q

Terms and Acronyms

Work Performance Information [Output/Input]

A

Begins with W: Information and data, on the status of the project schedule activities being performed to accomplish the project work, collected as part of the direct and numage project execution processes*. Information includes: status of deliverables: implementation status for change requests, corrective actions, preventive actions, and defect repairs; forecasted estimates to complete; reported percent of work physically completed; achieved value of’ technical performance measures; start and finish dates of schedule activities.

445
Q

Terms and Acronyms

Workaround [Technique]

A

Begins with W: A response to a negative risk that has occurred. Distinguished from contingency plan in that a workaround is not planned in advance of the occurrence of the risk event.

446
Q

Terms and Acronyms

AC

A

Actual Cost

447
Q

Terms and Acronyms

ACWP

A

Actual Cost of Work Performed

448
Q

Terms and Acronyms

AD

A

Activity Description

449
Q

Terms and Acronyms

ADM

A

Arrow Diagramming Method

450
Q

Terms and Acronyms

AE

A

Apportioned Effort

451
Q

Terms and Acronyms

AF

A

Actual Finish date

452
Q

Terms and Acronyms

AOA

A

Activity-on-Arrow

453
Q

Terms and Acronyms

AON

A

Activity-on-Node

454
Q

Terms and Acronyms

AS

A

Actual Start date

455
Q

Terms and Acronyms

BAC

A

Budget at Completion

456
Q

Terms and Acronyms

BCWP

A

Budgeted Cost of Work Performed

457
Q

Terms and Acronyms

BCWS

A

Budgeted Cost of Work Scheduled

458
Q

Terms and Acronyms

BOM

A

Bill Of Materials

459
Q

Terms and Acronyms

CA

A

Control Account

460
Q

Terms and Acronyms

CAP

A

Control Account Plan

461
Q

Terms and Acronyms

CCB

A

Change Control Board

462
Q

Terms and Acronyms

COQ

A

Cost of Quality

463
Q

Terms and Acronyms

CPF

A

Cost-Plus-Fee

464
Q

Terms and Acronyms

CPFF

A

Cost-Plus-Fixed-Fee

465
Q

Terms and Acronyms

CPI

A

Cost Performance Index

466
Q

Terms and Acronyms

CPIF

A

Cost-Plus-Incentive-Fee

467
Q

Terms and Acronyms

CPM

A

Critical Path Method

468
Q

Terms and Acronyms

CPPC

A

Cost-Plus-Percentage of Cost

469
Q

Terms and Acronyms

CV

A

Cost Variance

470
Q

Terms and Acronyms

CWBS

A

Contract Work Breakdown Structure

471
Q

Terms and Acronyms

DD

A

Data Date

472
Q

Terms and Acronyms

DU

A

Duration

473
Q

Terms and Acronyms

DUR

A

Duration

474
Q

Terms and Acronyms

EAC

A

Estimate at Completion

475
Q

Terms and Acronyms

EF

A

Early Finish date

476
Q

Terms and Acronyms

EMV

A

Expected Monetary Value

477
Q

Terms and Acronyms

ES

A

Early Start date

478
Q

Terms and Acronyms

ETC

A

Estimate to Complete

479
Q

Terms and Acronyms

EV

A

Earned Value

480
Q

Terms and Acronyms

EVM

A

Earned Value Management

481
Q

Terms and Acronyms

EVT

A

Earned Value Technique

482
Q

Terms and Acronyms

FF

A

Finish-to-Finish

483
Q

Terms and Acronyms

FF

A

Free Float

484
Q

Terms and Acronyms

FFP

A

Firm-Fixed-Price

485
Q

Terms and Acronyms

FMEA

A

Failure Mode and Effect Analysis

486
Q

Terms and Acronyms

FPIF

A

Fixed-Price-Incentive-Fee

487
Q

Terms and Acronyms

FS

A

Finish-to-Start

488
Q

Terms and Acronyms

1FB

A

Invitation for Bid

489
Q

Terms and Acronyms

LF

A

Late Finish date

490
Q

Terms and Acronyms

LOE

A

Level of Effort

491
Q

Terms and Acronyms

LS

A

Late Start date

492
Q

Terms and Acronyms

OBS

A

Organizational Breakdown Structure

493
Q

Terms and Acronyms

OD

A

Original Duration

494
Q

Terms and Acronyms

PC

A

Percent Complete

495
Q

Terms and Acronyms

PCT

A

Percent Complete

496
Q

Terms and Acronyms

PDM

A

Precedence Diagramming Method

497
Q

Terms and Acronyms

PF

A

Planned Finish date

498
Q

Terms and Acronyms

PM

A

Project Management

499
Q

Terms and Acronyms

PM

A

Project Manager

500
Q

Terms and Acronyms

PMBOK

A

Project Management Body of Knowledge