Plane Handing Flashcards
Initial tie down
Minimum 6 chains required immediately fore tween and after flight
Up to 45 knots
Normal weather 9 chains
46-60
Mod weather
14 chains
Above 60
Heavy weather 20 chains
What are chock and stat
Nwc-4
35 lbs
45 “
Ployurethane shell
What’s model of chain and stats
Td-1a
Td-1b
12lbs
10000 lbs capacity
How to ground plane
Attach to deck then to plane
When does plane get tied down
Must be tied when not in use and maintenance
How many volts can be collected in a windshield during flight
100 000 volts
How many ppl take to move plane
6-10 Move director Brake rider Chock walker Safety observer Tractor driver
Job of move director
Overall resp for assembling crew and safe movement
Job of bake rider
Conduct pre move inspection of brake system and plane and make sure it’s good to move
Chock walker
Resp for removing carry and insta chocks always ready to chock
Safety observer
Resp for ample clearance for plane position on wing tip and tail
Tractor driver
Resp for safe and slow movement of plane from hook to parking spot