Plan Making and Implementation Flashcards

1
Q

What population estimation method uses building permits to estimate current population?

A

Symptomatic

Symptomatic approach would give the best estimate.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

How is the official unemployment rate calculated?

A

Individuals unemployed divided by individuals 16 years of age and older in the labor force.

The BLS (Bureau of Labor Statistics: www.bls.gov) does a phone survey of 55,800 households. They ask, “Are you employed?” If yes, you are employed and in the labor force. If no, they ask, “Have you been actively seeking work (ASW) in the last four weeks?” ASW means answering a want ad, contacting an employment agency, or the equivalent. If yes, you are counted as in the labor force and as officially unemployed. If no, and you say you do want to work, you are called a “discouraged worker.”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

A 2.5-acre downtown site is approved with a floor area ratio (FAR) of 6. Approximately how many stories of the building could be built on an acre of the site if 60% of the site will be required for onsite stormwater treatment, parking, sidewalks, and landscaping?

A

15 stories

A floor area ratio of 6 would allow for a six-story building if 100% of the site was occupied. If only 40% of the site is available for development then a 15 story building could be built on the site.

2.5 acres is 108,900 square feet. We have a floor area ratio of 6. 108,900 X 6 = 653,400 is the total developable floor area we can have.

In this case, only 40% of the site is available for development. 1 acre is 40% of 2.5 acres. One acre is 43,560 square feet. Divide 653,400 by 43,560 = 15 stories.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

More open citizen participation and the preparation of environmental impact statements were two significant requirements established by which of the following acts?

A

National Environmental Policy Act

NEPA requires that public involvement is coordinated throughout the NEPA process. Early and ongoing opportunities for public engagement should occur throughout the project. The public should be involved in the identification of social, economic and environmental impacts, as well as impacts associated with the relocation of individuals, groups or institutions. Reasonable notice of any public hearings is required.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What is an analysis of the relationship between two variables called?

A

Regression Analysis

A regression compares the relationship between two or more variables. For example, the volume of traffic is based on land uses and type of roadway.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What is a best practice to engage citizens in a planning process?

A

Neighborhood meetings.

Engagement includes opportunities for interaction.

TV ads, letters in utility bills, and newsletters are options to inform the public, no engage them.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What measures the degree to which two variables are related?

A

Coefficient of Correlation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What methods can be used to preserve agricultural land?

A

I. Agricultural Zoning
II. Transfer of Development Rights
III. Purchase of Development Rights
IV. Right to Farm Ordinance

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What is the probability of an event that is certain to happen?

A

1

Probabilities range from 0 to 1. Zero stands for an event that is impossible, while 1 stands for an event that is certain. A probability of .5 is for an event that has a 50-50 chance of happening.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Which of the following planning figures is associated with the GIS concept of overlay?

A

Ian McHarg

Ian McHarg pioneered the concept of overlay in his book Design with Nature.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What is an effective way to generate citizen participation around a comprehensive planning process?

A

Develop a multi-faceted participation program including neighborhood meetings, an open house, and other opportunities.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

As the director of a non-profit housing advocacy organization that is growing, you realize that your organization needs to transform. You want your staff to work together to discuss the organizational topics that are most relevant to them. Because you want this to be a staff-driven conversation, you choose which participatory method?

A

Open Space

Open Space allows for people to propose topics to discuss and those who are interested choose to participate in that dialogue. The groups prepare summaries of their discussion to share with the entire group.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What is the most important element of a contract for consulting work?

A

List of milestones

This makes it clear the expectations of the consultant.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What elements are included in a contract for consulting work?

A
  1. List of milestones.
  2. Payment schedule.
  3. Consultant name.
  4. Contract price.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What does ZIP Code stand for?

A

Zone Improvement Plan Code

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Which term is used to describe an area with multiple-cities with a combined population of more than 10 million inhabitants?

A

Megalopolis

A megalopolis is defined as an extensive metropolitan area or a long chain of roughly continuous metropolitan areas. The term was first used in the United States by Jean Gottmann in 1957, to describe the huge urban area along the Eastern seaboard of the U.S. from Boston, Massachusetts to Washington, D.C.

17
Q

Upfront purchase costs, operating, and long-term maintenance costs should be considered in which of the following budgeting techniques?

A

Capital Improvement Plan

18
Q

Define Planning Programming Budget System

A

PPBS is about linking planning and budgeting and making the budget reflect objectives, strategies, and plans.

19
Q

What is performance budgeting?

A

Performance budgeting ties budgets to performance objectives.

20
Q

What is zero-based budgeting?

A

Zero-based budgeting starts from a “zero base,” and every function within an organization is analyzed for its needs and costs.

21
Q

What are challenges for planners seeking to undertake a telephone survey?

A

I. They exclude those using only mobile phones
II. They are expensive
III. They leave out those without phone service
IV. It can be difficult to reach people who screen calls

Telephone surveys have become an increasingly difficult form of surveying as people do not consistently use land lines and people often screen their calls.

22
Q

What is the largest tribal land holding in acres?

A

16 million

The Navajo tribe holds 16 million acres across New Mexico, Arizona, and Utah.

23
Q

What is the difference between the lowest and highest score on an exam?

A

Range

24
Q

The city’s floor area ratio requirements are 2.0 in the downtown. If a property owner has a ¼ acre site, what is the maximum building size?

A

21,780 square feet.

To solve this problem first divide 43560 by 4 to get the number of square feet in 1/4 of an acre. Next multiply 10,890 by 2.0 to get the maximum building size.