Pge Flashcards
What voltage are class 2 rubber gloves good for and what are they tested at? Color?
17kv system voltage
20kv tested
Yellow
What voltage are class 3 rubber gloves good for and what are they tested at? Color?
26.5kv system voltage
39,750v tested
Green
What’s the main two voltage’s you’ll see in San Rafael jurisdiction?
12kv delta
4kv delta
Materials required for installing a secondary underground service with wire size 350 kcmils and up?
Paddles for meter side, popsicles and ampacks for top side, 320meter
If I’m putting paddles on some 350 kcmil cable with a 4/0 neutral what press and what set of dies do I need?
12 ton press with 299 dies
Small press with 249 dies
If you are re framing a pole with a transformer what’s the spec for the top of the cut outs to the top of the can?
30inches. Measure from top bolt of primary arm down 30inch for top bolt of the transformer
What way does the plastic rings face on a cutout
In towards the poles
When connecting services to open wire what connectors do you use?
Mini wedge or small amp packs
When doing services what shouldn’t you do with the neutral?
Do not put a drip loop in the neutral
If you don’t know the size of the weather head wire. What connectors should you bring
3, 2 boxes
1, 3 box
2, 4 boxes
O and D die also
When do you have to use pin terminals on underground secondary?
Use pin terminals when you go from covered wire to open wire. Bare to bare is not required. Covered to covered is just aqua seal
Reframe on transformer pole measure down how many inches from top bolt of arm down to top bolt of transformer
36 inches preferably 42inch
Bottom of can down how many inches for center bolt of open wire secondary
10 inches
When checking voltage on a new can what should you put on your hands
Primary gloves
On time cards what overtime code do you use for working through lunch? and for working late?
Work through lunch Emergency overtime
Working late prearranged overtime