Performance-Based Navigation Flashcards

1
Q

What are the different navaids used in PBN?

A
  • VOR (limited due to angular error)
  • DME-DME position fixes - accuracy of 0.2 nm
  • GNSS
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What are the three different types of GNSS augmentations?

A
  • Aircraft based (ABAS)
  • Space-based (SBAS)
  • Ground-based (GBAS)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What is the function of Aircraft Autonomous Integrity Monitoring (AAIM) and Receiver Autonomous Integrity Monitoring (RAIM)?

A
  • Compares GNSS position with other sensors e.g. IRS
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What is the difference between RNAV and RNP specifications?

A

C.) RNP specifications have a requirement for on-board performance monitoring and alerting.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

In the PBN specifications, the number included in the specification name refers to:

A

C.) The required accuracy, in Nm, of the navigation system.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Which of the following is NOT a basic function required in all PBN Navigation Specifications?

A

B.) Facility to operate offset parallel tracks.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Which of the following statements regarding the errors in the PBN model is true?

A

A.) Path Definition Error is usually negligible

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

A requirement of PBN is that the total system error :

A

C.) Is equal or less than the required accuracy of the navigation specification for at least 95% of the time.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

The navigation database:

A

B.) Is valid for 28 days and must be confirmed valid prior to operating.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What is PBN comprised of in terms of RNAV?

A
RNAV (GNSS)
RNAV 1 (RNAV SID)
RNAV 2 ( TERMINAL)
RNAV 5 (TERMINAL)
RNP 4 (OCEANIC)
RNP 1 (STAR)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

When considering a notified RAIM outage that affects a planned flight, which of the following is correct?

A

C.) A RAIM outage of more than 5 minutes will require a re-routing or re-timing of the flight.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

When planning for an RNP APCH arrival at destination, it is necessary to ensure:

A

C.) Sufficient means are available to permit landing at either the destination or alternate in the event of a loss of the RNP capability.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

In order to operate on PBN routes and procedures:

A

C.) The aircraft must be certified to the required navigation specification and the pilot must be approved for PBN operations.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

When operating in PBN airspace, if a system failure results in a loss of PBN capability:

A

A.) ATC must be notified using the phrase “unable RNP due…”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

The Radius to Fix Leg is usable ___?

A

C.) Is usable in terminal airspace by aircraft certified specifically to perform RF Legs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Why must a SID or STAR be selected by name from the database rather than created manually by insertion of the waypoints?

A

B.) The database coding of the procedure includes additional information such as the RNP value for alerting

17
Q

What modifications are allowed to a SID or STAR once it has been selected from the database?

A

A.) Direct to.. Actions may be performed, at the request of ATC

18
Q

Approach operations are classified as either 2D or 3D. a 3D approach operation:

A

B.) Is performed to a DA, allowing for height loss after the commencement of a missed approach.

19
Q

Which statement is correct regarding approach operations to LNAV/VNAV?

A

B.) Either Baro-VNAV or SBAS may be used to operate these approaches.

20
Q

Missed approaches based on PBN navigation specifications:

A

A.) May be used, provided the reason for the missed approach was not the loss of PBN capability on the aircraft.

21
Q

Verification of the approach procedure prior to operation:

A

B.) Should be performed by comparison with the appropriate chart.

22
Q

For RNP APCH approaches using Baro-VNAV, the temperature published on the chart

A

B.) Is the minimum temperature at which use of the procedure is authorized.

23
Q

Vertical deviation is displayed to the pilot using a deviation scale. These scales:

A

A.) Will be calibrated such that full scale deflection represents the maximum allowed deviation from the vertical path.

24
Q

Which navigation aids may be used in PBN?

A

B.) GNSS, VOR, DME and INS

25
Q

When completing a flight plan for a flight which is intended to include operations in PBN airspace:

A

Block 18 contains information on the aircraft PBN capabilities relevant to the flight, and is limited to 8 entries