PC Port Washington Flashcards

1
Q

Interlockings and # of signals

A

Harold r- PSCC

Wood r-jam(8)

Shea r-jam(5)

Bay r-jam(5)

Neck r-jam(9)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Electric locks

A

2 uncontrolled
Shea yard- no.3 track, TP EB on no. 2 track
1st switch east of Mets Willets Point Station

Shea yard- no.4 track, TP EB on no. 2 track
2nd switch east of Mets Willets Point Station

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

1) tracks other than main with 3rd rail

2) absolute block signals

A

1)
Shea yard-3,4,5,6 tracks
Port Washington-all tracks(1-8 and switching lead)

2)
Neck3-EB freestanding pos. Lite home signal (N2w)on single track
At the entrance to 410 territory
Port Washington-WB pedestal home signal w/ basc cont by Jam.
on single track at the entrance to 410 territory

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

1) Signal to left of track governed

2) Flashing yellow signals

A

1)
Wood-EB freestanding G-head color lite signal(Ww)on no. 1
Track at the east end of Woodside station

Neck- EB freestanding pos. Lite signal(N2w)on no.1 track

2)Mets Willets point stop
EB-PW no.1 and no.2 tracks on the EB signal bridge at Shea(w)

WB- no.1 track on a signal mast 31’ west of Flushing Main Street
WB- no.2 track on a signal mast 39’ west of Flushing Main Street

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

1) White arrows

2) MAS

A

1)
Harold- EB mounted on top of pedestal signals
For ml no.2 track and pw no.2 track
1st home signal east of 12 bridge
(White arrow for ml2 track lit when xing over to PW branch)

            EB on Post Office sig. Bridge for PW1 track

2) 60 psgr 40 frt
2) 60 psgr 40 frt

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Yards

A

Shea yard-tracks 3-6 no. to so. , all 3rd rail, rest 5, ch. 1 or 2

                - platforms between 3,4 and 5,6
                 - Crossties on east end of 4 track
                 - h.o.s. , a.s.s, electric yard sw. and elec. lock switches
                 - no mu or dm equipment on 5 or 6 track

Port Wash. Yard- tracks 1-8 no. to so., all 3rd rail(1-8and switch ld.)
- rest 10 mph, ch 1 or 2
-station platforms between 2,3 and 4,5
-Elec yard switches w/ yd. switch indicators
For facing point moves

How well did you know this?
1
Not at all
2
3
4
5
Perfectly