pc lecture 2 Flashcards
Are a single unit which is made up of steel
Wires
Two, three or seven wires
Strands
A group of strands or wires
Tendon
A group of tendons
Cable
A tendon can be made up of a single steel bar
Bars
When there is adequate bond between the prestressing tendon and concrete
Bonded tendon
Pre-tensioned and grouted post-tensioned
Bonded tendon
When there is no bond between the prestressing tendon and concrete
Unbonded tendon
Initial stage
(a) during tensioning of steel
(b) at transfer of prestress to concrete.
Intermediate stage
This includes the loads during transportation of the prestressed members
Final stage
(a) at service (during operation}
(b)at ultimate stage (during extreme events)
This is the simplest type of prestressing producing large prestressing forces
Hydraulic prestressing
Used for the tensioning of tendons comprises of calibrated pressure gauges, which directly indicate the magnitude of force developed during the tensioning.
Hydraulic jack
Four sources of prestressing force
Mechanical, hydraulic, electrical and
chemical.
Based on the location of the prestressing tendon with respect to the
concrete section.
External or internal prestressing