P Flashcards
What is the purpose of the Ruct in the system?
It takes meter power and inverts it to supply 56 V three-phase power to each motor.
How does the RUC control motor speeds?
By varying the frequency.
What is required if the planter is equipped with an onboard hydraulically driven power generation unit?
Four 12 volt batteries hooked in series connected to the hydraulically driven alternator.
What is the requirement when using a PTO driven generator?
No batteries are required.
What precaution must be taken when performing diagnostics on the electrical system?
Care must be exercised due to the potential for shock if proper procedures are not followed.
Fill in the blank: The two options for power generation are _______ and _______.
On Board (Hydraulic) PowerGen, PTO PowerGen