ops and seamanship 7 Flashcards

1
Q

A cockle can reduce line strength by as much as a _______________.

A

third

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Fake down double-braided line in __________________ patterns

A

figure-eight

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

It is recommended that three-strand synthetic lines be faked down on deck and allowed to relax for ___________________.

A

Twenty four hours

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Lengths less than _________________ feet will relax in one hour when laid out straight.

A

50

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

The towing rig should be inspected _____________________. If doubt exists on the reliability, replace the tow line components.

A

Before and after every use

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Detachable link parts are ________________ interchangeable. Keep each link’s parts together and separate from the others.

A

not

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Measure wire rope diameter at _______________ or more places with __________________ calipers

A

six/vernier

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Replace if Wear of _________________ of the original diameter of the outside individual wires

A

1/3

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

replace if _____________ broken wires in one rope lay length, or ______________ broken wires in one strand lay length

A

Six/three

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

replace if ______________ broken wire within one rope lay length of any end fitting.

A

one

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

The zinc anodes in the hydraulic drive unit saltwater cooler are inspected weekly or every ______________ when the towing machine is operating.

A

24 hours

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

The tow rollers are inspected and lubricated _____________ and prior to each towing operation.

A

Monthly

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

The towing machine is lubricated and test operated _____________.

A

Monthly

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

The brakes and controller are inspected _______________.

A

Semiannual

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

The towing gear accessories, winch control components, clutch brake compressor, and motor are inspected _________________-.

A

annually

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

When a rope is used in towing operations without a towing engine, the towing hawser must have a scope of at least ______________________ especially for long tows and in heavy weather.

A

200 fathoms (1200 feet)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

who conducts the ORM and tow brief and debrief

A

CO

18
Q

Who chooses the course and speed of the approach

A

CO

19
Q

Who establishes comms with tow and determines procedures

A

OPS

20
Q

Who confirms stations are manned and ready

A

OPS

21
Q

Who works with 1lt to determine tow rig configuration

A

CO

22
Q

Who prepares the tow on deck and makes small boat ready for sea.

A

1LT

23
Q

who gives safety brief on deck

A

1LT

24
Q

Who assigns tow safety officer

A

OOD

25
Q

Who maintains oversight and make sure ORM practices are in use.

A

Tow Safety Officer

26
Q

Who sets and operates under the RMD

A

CO

27
Q

Who reports to 1LT

A

Tow Deck Captain

28
Q

Who supervises tow deck riggers

A

Tow Deck Captain

29
Q

To avoid confusion the ____________________ does not handle lines

A

Tow deck Captain

30
Q

Who handles lines

A

Tow Deck Rigger

31
Q

who walks the tow rig together prior to the approach

A

CO/1LT/OOD tow captain

32
Q

What are the 4 towing approaches

A

Crossing the T/parallel/backing/45 degree

33
Q

BOLO a toggle is tied into the nylon line _________ to ______________ feet from the weight

A

4 to 5

34
Q

A line throwing gun can deliver a line up to ________________ away

A

550ft

35
Q

screw pin shackles are not used for cutters over ______________ tons

A

600

36
Q

A weak link shackle has a WLL of about _______________ of the bollard pull of the ship towing

A

1/5

37
Q

Wire bridles are ____________ of the cutters beam

A

150%

38
Q

The angle of spread shall not exceed _____________ Degrees at the connecting towing hardware. ___________ is prefered

A

100/ 60

39
Q

The rule of thumb is to keep_______________ of the towline in the water at all times

A

1/4

40
Q

Turn in increments of ___________ degrees at a time

A

10