Operations Management Flashcards

1
Q

Which of the following is usually included as an inventory holding cost?

A

Breakage

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What is the basic purpose of inventory analysis?

A

To specify when items should be ordered and how large the order should be.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

ABC inventory classification schemes divide inventory items into three groupings. What are these groupings
usually based upon?

A

Dollar Volume

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Under a periodic review system, enough inventory must be carried to protect against stock out for
the ___________.

A

Replenishment lead time plus the review period

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Using the ABC classification system for inventory, which of the following is a true statement?

A

The “A” items are of high dollar volume

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Which of the following is not necessary to compute the order quantity using the fixed-time period model with
safety stock?

A

Ordering cost

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

. Which of the following is not an assumption of the basic fixed-order quantity inventory model?

A

Diminishing returns to scale of holding inventory

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Which of the following is a perpetual system for inventory management?

A

Fixed-order quantity

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

The master production schedule is typically stated as:

A

Specific finished goods

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

The next level down in the planning process after development of the aggregate plan is the ____________.

A

Master production schedule

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

In a level production plan, equipment capacity is set equal to

A

Average demand

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

An advantage of the chase aggregate plan is __________.

A

Minimizes finished goods holding costs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What type of aggregate plan keeps a stable workforce and uses backorders to compensate for
excess demand needs?

A

Level

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Which of the following is not an input to the aggregate planning process?

A

Master production schedule

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Which of the following is an input to the master production schedule (MPS)?

A

The aggregate plan

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Which of the following is one of the main purposes of a MRP system?

A

To determine the amount of materials needed to produce each end item

16
Q

Which of the following is an input file necessary to run an MRP system?

A

Bill of materials (BOM) file

17
Q

MRP systems seek to achieve which of the following?

A

Determine the number of demand dependent items needed

18
Q

Which of the following is considered a primary report in an MRP system?

A

Planned order schedules

19
Q

Under the lot-for-lot (L4L) lot sizing technique as used in MRP, we would expect which of the following?

A

Minimized carrying costs

20
Q

A computer-based information system designed to manage dependent demand inventory is ____________.

A

Material requirements planning

21
Q

The _________ is (are) checked for the materials on hand and those that need to be
procured.

A

Inventory records

22
Q

In MRP, the starting points for each part and material needed to accomplish the master
production schedule are the ____________.

A

Gross requirements

23
Q

The time interval necessary to either manufacture or purchase an item is its _____________.

A

Lead time

24
Q

For any period the beginning inventory, plus any replenishment orders due, less the gross
requirement equals is called the ______________.

A

Projected available quantity

24
Q

For every scheduled receipt in an MRP table, there is also in the organization a(n)

A

Order that has been placed but not received

25
Q

The MRP file that contains data on specific materials used to make final products and their
correct quantities is the ____________.

A

Bill of materials file