New SOG pp 41-50 - Sheet1 Flashcards
From the New SOG manual:
If the 2nd Due Engine Company has verified that the fire is not in the basement, what shall the 4th Due Company do?
contact Operations for an assignment
From the New SOG manual:
How far should the 5th Due Engine Company stop from an incident?
approximately one (1) block away
From the New SOG manual:
On known basement fires, what is the primary purpose of the 1st Due Engine Company’s hoseline?
protect the search and rescue operation
From the New SOG manual:
Where is the best place to contain the basement fire?
top of the interior basement stairs
From the New SOG manual:
Where are the risk assessments of the conditions inside the building located?
outside front steps; threshold of the front door; inside front foyer; door to the basement from 1st floor
From the New SOG manual:
What will Operations do once everone has evcuated a building?
conduct a roll call
From the New SOG manual:
Who attacks the fire in a English basement?
3rd Due Engine
From the New SOG manual:
Who is assigned to back the attack line on a English basement?
5th Due Engine
From the New SOG manual:
Where should the aerial ladder be placed if no rescues are to be made, or rescues are being covered by portable ground ladders?
place aerial ladder for access to the roof for vertical ventilation
From the New SOG manual:
What doors do the 1st Due Truck Company on a English basement force entry into?
exterior doors; front door; English basement door; interior doors
From the New SOG manual:
When ventilating a basement fire, what floor has the first priority?
Horizontal ventialtion of the first floor rear is a priority
From the New SOG manual:
On attic and top floor fires, the 1st Due Truck ventilates the ___ so the Engine Company can gain access to the attic or cockloft.
Roof
From the New SOG manual:
Buildings of lightweight truss construction experiencing heavy fire conditions should only be conducted if members are supported by and can operate off of ________ or _______.
aerial ladders; tower ladder platforms
From the New SOG manual:
On fires in buildings of balloon-frame construction, what is the priority of the 1st Due Truck
Opening the roof is a priority
From the New SOG manual:
On rear porch fires who is responsible for operating in the basement once the fire is extinguished?
2nd Due Truck