New SOG pp 41-50 - Sheet1 Flashcards

1
Q

From the New SOG manual:

If the 2nd Due Engine Company has verified that the fire is not in the basement, what shall the 4th Due Company do?

A

contact Operations for an assignment

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

From the New SOG manual:

How far should the 5th Due Engine Company stop from an incident?

A

approximately one (1) block away

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

From the New SOG manual:

On known basement fires, what is the primary purpose of the 1st Due Engine Company’s hoseline?

A

protect the search and rescue operation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

From the New SOG manual:

Where is the best place to contain the basement fire?

A

top of the interior basement stairs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

From the New SOG manual:

Where are the risk assessments of the conditions inside the building located?

A

outside front steps; threshold of the front door; inside front foyer; door to the basement from 1st floor

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

From the New SOG manual:

What will Operations do once everone has evcuated a building?

A

conduct a roll call

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

From the New SOG manual:

Who attacks the fire in a English basement?

A

3rd Due Engine

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

From the New SOG manual:

Who is assigned to back the attack line on a English basement?

A

5th Due Engine

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

From the New SOG manual:

Where should the aerial ladder be placed if no rescues are to be made, or rescues are being covered by portable ground ladders?

A

place aerial ladder for access to the roof for vertical ventilation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

From the New SOG manual:

What doors do the 1st Due Truck Company on a English basement force entry into?

A

exterior doors; front door; English basement door; interior doors

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

From the New SOG manual:

When ventilating a basement fire, what floor has the first priority?

A

Horizontal ventialtion of the first floor rear is a priority

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

From the New SOG manual:

On attic and top floor fires, the 1st Due Truck ventilates the ___ so the Engine Company can gain access to the attic or cockloft.

A

Roof

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

From the New SOG manual:

Buildings of lightweight truss construction experiencing heavy fire conditions should only be conducted if members are supported by and can operate off of ________ or _______.

A

aerial ladders; tower ladder platforms

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

From the New SOG manual:

On fires in buildings of balloon-frame construction, what is the priority of the 1st Due Truck

A

Opening the roof is a priority

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

From the New SOG manual:

On rear porch fires who is responsible for operating in the basement once the fire is extinguished?

A

2nd Due Truck

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

From the New SOG manual:

A High-rise building has how many floors in height?

A

Five or more floors

17
Q

From the New SOG manual:

Where is the Interior Rapid Intervention Group located in a High-Rise building?

A

1 floor below the fire

18
Q

From the New SOG manual:

Where is Interior Staging in a High-Rise building?

A

three floors below the fire

19
Q

From the New SOG manual:

On High-Rise buildings, where should the 1st Due Engine Company give interior size-ups?

A

Lobby; Stairwells; Fire Floor; at the door and inside the fire apartment