Nabcep Prep / PV Mastery Final Exam Flashcards

1
Q

A PV array receives an average of 900 W/m2 for 5 hours a day. What is the total amount of solar energy the PV array receives during a 7-day period?

A
  1. 00 kWh/m2
  2. 15 kWh/m2
  3. 50 kWh/m2
  4. 50 kWh/m2
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What is the initial necessary step to ensure code compliance for a PV system installation?

A

Perform a shading analysis

Analyze the client’s electric usage

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

At what time of year during solar noon will an object cast the longest shadow in the Northern Hemisphere?

A

⦁ June 21st, Summer Solstice
⦁ March 21st, Spring Equinox
⦁ December 21st, Winter Solstice
⦁ September 21st, Fall Equinox

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Rooftop mounting systems transfer the weight of the PV system and its associated wind, snow and seismic loads to the roof’s tissues or rafters through which component?

A

26 watts
260 watts
120 watts
144 watts

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

The grounding electrode conductor of a PV system should be what color?

A

Black
Green
White
Red

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What is the primary power source for a grid tied inverter?

A

The PV array
The battery bank
The main service panel
The utility

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What parameter on a PV module’s IV curve is used to calculate the minimum number of modules to be configured in a series string?

A

Imp
VMP
Isc
Voc

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What is the reason for grounding PV systems?

A

To establish a connection to the earth
Provides a path for fault currents and lighting induced surges to dissipate safely
It improves power output from the array
It establishes resistance levels for the PV system

How well did you know this?
1
Not at all
2
3
4
5
Perfectly