My Own Cards Flashcards
FNC B
Base molding, 2 1/4in, paint grade
FNC CWN
Crown molding, 3 1/4in, paint grade
FNC CWN>+
Crown molding, 4 1/4 in, stain grade
FNC C
Casing, 2 1/4 in, paint grade
PNT BS
Stain and finish base mold
FNC B3
Base molding, 3 1/4 in, paint grade
CLN TRIM
Clean trim
CLN HR
Clean handrail
FRM TR6
Truss, 6/12 slope, need to know length, span (do not include eaves) and centers
FRM RFTR10
Common rafter, 10/12 pitch, need to know the rafter size, length, centers and length of system
FRM H6
Hip rafter, 6/12 pitch, need to know the hip rafter length, will include the jack rafters
FRM RFA4L
Add’l labor for 5/12 to 9/12 pitch for 2x4 - 2x6
FRM 4SF
Frame stud wall, 2x4, 16 in centers per SF
FRM SH3/4
3/4 in CDX sheathing
FRM SHSTP
Add’l labor for steep (7/12-9/12 pitch) roof
FRM JST10
Ceiling or floor joist, 2x10 system, need joist length, centers and system length
FRM 4LF
2x4 stud wall, 16 in centers per LF
EQU CRANE
Crane and operator, 14 ton capacity, 65’ boom extension.
FRM TRA8
Attic truss (per LF), 8/12 slope
FRM FLTR
Floor truss system, need length, width and centers
FEN CL5
Chain link fence, 5 ft high
FEN CLV5
Chain link fence, vinyl coated, 5 ft high
FEN WDF6T
Treated wood privacy fence, 6 ft high
FEN WDF6
Cedar privacy fence, 6 ft high
FEN WDFBB6T
Board on board wood fence, 6 ft high, treated
FEN VNLS6
Vinyl slat fence, 6 ft high
FEN PRS3
Post and rail (3 rail) fence
SCF LJ
Ladder jack scaffolding
SCF RENTW
Rent pump jack scaffolding by the week (used if SDG on over 20 ft high)
SCF SECT
Set up and take down scaffolding
EQU SLIFT
Scissor lift rental
EQU BLIFT
Boom lift rental
WDS RT10
Reflective tube skylight (10” tube)
DOR XSL
Exterior door side light
GLS LEAD
Leaded door glass additional cost
DOR WDP6A
Patio door, 6 ft aluminum
SPE MBXR
Mailbox, rural
RFG COPS
Copper standing seam (often as window awnings)
FRM DKV
Vinyl deck planking
PNT DKRL
Paint deck rail
FCW LAMTD
Engineered wood floor
FCW LAM
Laminated faux wood floor
FCW FINDS
Dustless sanding of wood floor
FCW BARRV
Vapor barrier for laminate flooring
FCW AV
Average grade of carpet
FCC NFCP
carpet priced by independent analysis (ITEL)
FCW GADDC
Add for glue down of wood floor on concrete slab.
FCW GADDW
Add for glue down of wood floor on wood subfloor.
FCW NFCPENF
Engineered wood floor, floating priced by independent analysis (ITEL)
FCW NFCPENG
Engineered wood floor, glue-down priced by independent anaylsyis (ITEL)
RFG MTL
26 gauge, Ribbed up to 1”
RFG MTL+
26 gauge standing seam, baked on color finish
RFG MTLC-
29 gauge, Corrugated
RFG MTLR
26 gauge, ribbed metal roofing
RFG MTLR>
26 gauge, ribbed metal roofing - 1 1/8 to 1 1/2
RFG RIDGM
Ridge metal
RFG MTLCS
Closure strips for metal roofing, per linear ft
RFG MTLRV
Metal roofing ridge vent, Consider MTLRV-
RFG MTLRV-
Common metal roof Ridge vent
RFG MTLET
Formed eave trim for metal roof
RFG MTLGT
Gable trim for metal roof
MTL PNLCR
Metal building corner trim
RFG MTLVF
Valley metal for metal roof
RFG MTRJK
Pipe Jack for metal roof
MTL REC
Gable cap set end of ridge on metal building
MTL PNLJ
J trim installed around doors and openings for metal buildings