MSTE Flashcards

1
Q

It is the basic unit of travel behavior. It is also involves movement from a single origin involves to ta single destination and are described in terms of origins, destinations, purpose, time of occurrence, travel modes and routes.

A

trip

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

The time for sensations to be transmitted to the brain.

A

Perception

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

The time for understanding the situation

A

Intellection

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

The time elapsed during emotional sensations

A

Emotion

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

The time elapsed to make the final decision

A

Volition

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Progressive disintegration of the surface between the wheel paths caused by dripping of gasoline or oil from vehicles

A

Drip track raveling

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

The extruding of bitumen onto the pavement surface, causing a reduction in skid resistance. it is generally caused by excessive amount of asphalt in the mix or low air voids content. it occurs when asphalt fills the voids in the mix during hot weather and then exudes out onto the surface of the pavement

A

bleeding or flushing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Elevation differences between adhacenbt slabs at transverse hoints. it is usually the result of pumping and is a major source of portland concrete pavement structure

A

faulting

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Localized upward buickling and shattering of slabs t transverse joint or cracks. They can occur when transverse jkoints are filled with incompressible solid materials

A

blowups

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

a series of interconnected or interlaced cracks caused by fatigue failure of the asphalt concrete surface under repeated traffic loading

A

alligator cracking

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

cracks forming large interconnected polygons, usually with sharp corners or angle. These cracks are generally caused by hardening and shrinkage of the asphalt and or reflection cracking from underlying layers such as cement treated base

A

block cracking

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

The type of surveying in which the curvature of the earth is taken into account is called________________ curveying

A

geodetic

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Which of the following survey is used to define the property line.

A

cadastral survey

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

The survey carried out to delineate natural features such as hills, rivers, forests and man-made features such as town, villages building, roads, transmission lines and canals is classified as _______________ survey

A

topography

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

A plane, which is perpendicular to the plumb line through a point and is tangential to the level surface at that point is called a _____________ plane

A

horizontal

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

When a path traveled along the road surface is more than the circumferential movement of the tires due to rotation, what is the resulting motion of the tires.

17
Q

This occurs when the heel revolves more than the corresponding longitudinal movement along the road.

18
Q

It is the cross slope provided to raise the middle of the road surface in the transverse direction to drain off rain water from road surface

19
Q

It is dividing line between carriageway and foothpath

20
Q

Construction workers who are working from unguarded surfaced ________________ or more above grade, temporary or permanent floor platform, scaffold or where they are exposed to the possibility of falls hazardous to life or limb, must be provided with safety harnesses and lifelines.

21
Q

Every construction project shall have a suitable ________________________, which must be in accordance with these rules, and other orders and issuances issued by the department of labor and employment.

A

Construction safety and healtyh program

22
Q

This refers to a method of protecting employees from cave-ins, from material that could fall or roll from an excavation face or into and excavation, and from the collapse of adjacent structures.

A

Protective system