MPD Flashcards

1
Q

MPD Sources % split

A

70% MRB - Maintenance Review Board
20% Type Certification Process - ALS
10% other, AD, CMP (Configuration Maintenance Procedure - applies for ETOPS), SB’s, ISB, OIT, AOT, ISI

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

MRB Process history

A

Responsibility of Scheduled Maintenance definition in aviation:
Early years of aviation: Mechanics
1950: Aircraft Manufacturer
1960: Industry formed task force to investigate in capabilities of preventive maintenance
1970: Development of Maintenance Steering Group for 747
1980: Industry applies in majority MSG-3 approach

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

National regulations

A

ICAO convention Annex 8: Airworthiness of Aircraft: it is the manufacturers responsibility to identify scheduled maintenance tasks that form part of the Instructions for Continued Airworthiness (ICA) of the aircraft. CS/FAR25.1529

CS-25 certification specification for large aircrafts

The MRB process plus MSG-3 method arr ‘acceptable means of compliance’ with CS/FAR25.1529

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

ATA MSG-3 Document - 4 sections?

A
  1. Aircraft Systems, APU and Powerplant Analysis Procedure
  2. Aircraft Structural Analysis Procedure
  3. Zonal Analysis Procedure
  4. Lightning/High Intensity Radiated Field (L/HIRF) Analysis Procedure
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Type Certification Process

A

Demonstration of compliance to certification requirements leads to the identification of limitations to prevent or detect unsafe conditions:
ALS is a repository of stand-alone documents

Regulation requirements lead to different ALs documents: EASA/FAR

25-571 | Fatigue Analysis
Safe Life: ALS Part 1
Damage Tolerant Airworthiness = ALI: ALS Part 2

25-1309
System Safety Analysis & MSG-3
CMR - Certification Maintenance Requirements
ALS Part 3
System Aging Analysis post DSG + MSG-3 + System Life Limits
Aging System Maintenance (ASM): ALS Part 4

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Soft Time

A

Additional preventivr actions incl in your MPD in order to reduce cost especially operational interruption cost which outweight the addition maintenance cost of inspection.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Line Maintenance Structure Visual Inspection

A

6 man and 5 hours and with drone only 30min

How well did you know this?
1
Not at all
2
3
4
5
Perfectly