Module 4 Flashcards
Define Waterfall model
No phase begins until the prior phase is complete.
What is the same for V-model and spiral?
Contains a validation chech of each task.
What are the two diffrent LEAN modules?
BML( Build-Measure-Learn) and The seven wastes.
What is LEAN?
It is a methodology to eliminate wasteful practise.
What is MVP
(LEAN)
Minimum Viable Product
What is TBM?
A list of all the tasks that must be completed during the project’s life cycle.
TASK BASED MODEL
What is WBS?
It helps ypu structure work by the use of hierchy
WORK BREAKDOWN STRUCTURE
What is PBM?
Divides tasks that produce a product from tasks that require another product as an input.
PRODUCT BASED MODEL
Short words are better than Long words, what word is better than short words ?
Precice words
What is better than passive voice?
Active voice
what is better than nouns?
Verbs
Three categories of research
Exploratory, Descriptive and Causal
How to write a Harvard style refrence?
AuthorLastName, AuthorFirstName, Year, Title, Publisher
What is the carrot test?
A test to see if something is a credible source
What does the Carrot test abreviate ?
Correct, Autoritative, Required Range, Objectivity and Timeliness.