Module 3- Work Breakdown Structure Flashcards
It is a visual project management technique for tracking and aligning a project’s scope of work, budget, and schedule.
Work Breakdown Structure
It is a hierarchical way of organizing a building project in construction. The WBS is a single document that divides the project deliverables into manageable chunks known as work packages.
Work Breakdown Structure
It revolves around tangible deliverables, not processes. The hierarchy for this type of WBS captures what will be built rather than how it will be built.
deliverable-oriented (or product-oriented)
WBS
It divides construction into steps or stages. This type of WBS focuses on the processes required to achieve the deliverables, using verbs rather than nouns.
phase-based WBS