1
Q

Erosion key definition

A

The process–action of water, wind and other weather condition—cause soil particle displaced.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Type of erosion

A
  1. Wind erosion
  2. Raindrop erosion
  3. Sheet erosion
  4. Rill and gully erosion
  5. Stream and channel erosion
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

FACTOR THAT IMPACT WATER EROSION

A
  1. Climate
  2. Soil erodibility
  3. Length of flow
  4. Slope of the land
  5. Erosion control BMP
  6. Sediment control BMP
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

WHAT FACTOR AFFECT SEDIMENTATION?

A
  1. Particle size
  2. Flow velocity
  3. Basis of how sediment containment system function
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

WHAT FACTOR AFFECT SEDIMENTATION?

A
  1. Particle size
  2. Flow velocity
  3. Basis of how sediment containment system function
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

HYDROLGY

A

Study of water of the earth:
1. Occurence
2. Circulation
3. Distribution
4. Chemical and physical properties
5. Reaction with the environment
6. Relation to living thing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

FACTOR AFFECTING RUNOFF AND RATE OF FLOW

A
  1. Soil types and roughness
  2. Storm intensity
  3. Contributing area
  4. Steepness of the terrain
  5. Length of the slopes
  6. Vegetation cover
  7. Storm duration
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

HOW OFTEN WATER QUALITY SAMPLING SHOULD TAKE?

A

Every conducted inspection

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

WHERE TO TAKE WATER QUALITY SAMPLING?

A
  1. Upstream
  2. Site outlet
  3. Downstream
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

WHAT TO SAMPLING DURING WATER QUALITY SAMPLING?

A

1.Nephelometric Turbiduty Units (NTU)–Instantaneous result using portable equipment.
2. Total Suspended Solid (TSS)–Must be analysed in lab

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

WHAT IS BEST MANAGEMENT PRACTICE (BMP)?

A

Measure, Practise, or Device that can:
1. Minimize erosion
2. Minimize the release of sediments from construction sites.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

ABOUT BMP

A
  1. Don’t always consider local site need when selecting BMP
  2. Know limitations
  3. Unlimited types and number
  4. Drainage area
  5. Soil type and sediment size
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Quality of good inspector

A
  1. An unbiased entity
  2. Knowledgeable
  3. Appropriate ESC training and experience.
  4. Consistent and proactive.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Motto of CISEC

A

Observe, inspect and report on what you found. Avoid mandating your requirements (unless you are qualify)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Ultimate goal for CISEC inspector

A

Work with contractor to reduce the amount of pollutant leaving construction site to a maximum practical extent possible.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What is two component of ESC plan?

A
  1. ESC Plan Report
  2. ESC Plan Drawing
17
Q

“MORE” Effective ESC Plan

A
  1. Multi barrier approach
  2. On-going process
  3. Regular Inspection, Monitoring and Maintenance.
  4. Education and training
18
Q

Inspector responsibilities during construction activities.

A
  1. Review ESC Plan to see if it current.
  2. Review BMP on site if it functional
  3. Documents findings
    -Document your finding and communicate it to conractor.
    -Don’t be confrontational to contractor
  4. Ensure that BMP is effective during storm events
  5. Do not redesign ESC report and ESC plan drawing
    -Inspector are not responsible if BMP are not working properly
    -Inspector are not responsible to fix BMP that need to be fix
  6. Be prepare to inspect during shutdown conditions.
  7. Be prepare to require temporary suspension of construction activities.
19
Q

PURPOSE OF INSPECTION-To create snapshot in time

A
  1. Assess BMP on site whether they are effective and understans their limitations.
  2. Ensure ESC Plan are being implemented.
  3. Observe what is happening on site
  4. Determine if additional measure are being warranted.
  5. Accurately document site condition
  6. Maintain communication and work towards the ultimate goal of environmental protection.
20
Q

INSPECTOR BASIC COMMUNICATION SKILL AT SITE

A
  1. Making observation
  2. Verbalize
  3. Write
  4. Listen
  5. Documentation
21
Q

HOW TO HAVE A GOOD RELATIONSHIP WHEN WORKING WITH CONTRACTOR?

A
  1. Build a trusting relationship
  2. Realize that you are both the same team
  3. Show respect
  4. Don’t be bully
  5. Don’t assume you know his job
  6. Work together
22
Q

CISEC CODE OF ETHIC

A
  1. Article 1, General Principles
  2. Article 2, Relation of professional to the public
  3. Article 3, Relation of employer in relation
    4.Art