Mod A Flashcards
Which staff section is responsible for building the UAP? How long is the UAP planning timeline?
ADAM/BAE; 24 hrs
FSE; 24 hours
ADAM/BAE; 72hours
ALO; 72 hours
ADAM/BAE 72 hrs
FM 3-52 (2016) defines brigade responsibility as:
Controlling airspace users above the coordinating altitude
^ Management of army airspace users within the Brigade area of operation
Controlling unmanned aerial vehicles in the brigade area of operations
Management of joint airspace users above the coordinating altitude
Management of army airspace users within the Brigade area of operation
an ADAM/BAE tactical data system that provides air defense sensor, weapons, and threat analysis during mission planning
AMDWS
What is a D670?
Q Air Support Request (ASR)
Airspace Coordinating Measure Request (ACMREQ)
Request for Clearance of Fires (RCF)
Airspace Control Order (ACO)
Air support request
ACM used to separate users and as they transition between airspace control elements
Coordinating altitude
Facilitate the rapid engagement of targets and simultaneously provide safeguards for friendly forces
FSCM
ACM used to separate fixed wings and rotary wings by determining an altitude below which fw normally will not fly
Coordinate level
An ADAM/BAE tactical data system that is the primary TDL interface for the BCT.
ADSI
A compilation of ACMREQs from each echelon
UAP
Three methods of airspace control
Positive procedural and both
Provides fire mission processing target collaboration, and management of weapon locating radars
AFATDS
Receives an air picture directly from the sentinel radar and I the primary interface for RAM Warn
FAAD
FM 3-52
Management of army airspace
Five data systems in a BCT fires cell
AFATDS, ADSI, AMDWS, FAAD, TAIS
Faat
Where does the ATS company reside in the combat aviation brigade
GSAB