Mod 2.5 Flashcards

1
Q

An ICD or IS ICD document the intent to partially or wholly address capability gap(s) w/ what kind of solutions?

A

Material or non-materiel.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

A CDD defines (blank), (blank), and (blank) parameters across one or more increments of a (blank) capability solution. These are (blank)

A

Authoritative, measurable, and testable … materiel… Key Performance Parameters (KPPs) and Key system Attributes (KSAs)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

CPD

A

Capability production document

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

A CPD provides authoritative, testable capability requirements, in terms of KPPs, KSAs and additional performance attributes for what phase of an acquisition program.

A

The Production and Deployment (P&D) phase of an acquisition program.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

A Joint DCR (DOTmLPF-P) Change Recmd) adresses capability gaps through what means of solution?

A

Through a non-materiel solution.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

In areas where a J-DCR is not generated from an ICD, it also serves to what?

A

document the new capability rqmts and assoc. capab gaps being addressed.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What is a UON, JUON and JEON and its purpose?

A

Joint or non-joint Urgent/Emergency Operational Need. They document capability rqmts driven by ongoing or anticipated contingency operations that left unfilled would lead to unacceptable loss of life or critical mission failure.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

This document supports production of a single increment of a materiel capab solution and is an entrance criteria item necessary for each Milestone C acq decision.

A

CPD-capability production document.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly