Q

What LEED Rating system has performance periods?

A

LEED O+M: Existing Buildings

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What does every credit category begin within the LEED reference guides?

A

Overview

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What provides legal protection of the ozone layer in the U.S.?

A

U.S. Environmental Protection Agency (EPA)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Off-gassing of contaminants is a major degrader of the indoor air quality of a building. What products need to be analyzed to determine their VOC content?

A

Wall paint

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Cork ceiling tiles have the ability to be recycled and completely reused for flooring at the end of their life. Which term describes this approach?

A

Cradle to cradle

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What does not affect a project’s certification fees?

A

The amount of LEED credits pursued

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

The most significant difference between a conventional linear design process and an Integrative Process is?

A

The Integrative Process is iterative

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

When does commissioning take place?

A

Substantial completion phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What contributes to Heat Island Effect?

A

Reduced airflow due to tall buildings and narrow streets

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

The Location and Transportation credit category awards points for selecting a site within a walkable proximity to a number of “diverse uses”. Which is not a “diverse use”?

A

An automated teller machine

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

LeadingGreen’s enormous parking lot utilizes constructed shading towers equipped with PV panels to generate electricity for vehicle recharging stations. Which credits would be impacted by this? (CHOOSE 2)

A

Green Vehicles & Heat island Reduction

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

The Water Efficiency prerequisite requires an indoor water usage reduction of 20% from a baseline calculated from what?

A

The number of occupants , and their usage

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Which type of water is permitted as an alternative water source for indoor water use?

A

Used process water

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

The Integrative Process was previously just a principle of sustainability, but with LEED V4, it is now actually worth a point. Which of the following demonstrates a team using the Integrative Process concept of the Systems Thinking approach?

A

Establishing water saving metrics for measuring success

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What is the overarching goal of the Materials and Resources credit category?

A

Minimize the embodied life-cycle impacts of the building materials

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Who is the stakeholder on a project team responsible for verifying the performance and testing of building systems?

A

Commissioning Authority

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

A project is located in northern Ontario and wants to take advantage of the area’s environmental assets. Which credit category addresses the needs of this unique location?

A

Regional Priority credits

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

A team is not sure how to set its baseline for outdoor water consumption. Which of the following techniques would not help earn the outdoor water use reduction credit? (CHOOSE 2)

A
  • Use turf grass for groundcover
  • Install a vegetative roof
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

Where would it be appropriate to use the USGBC member logo for LeadingGreen, a member company of the USGBC?

A

On company letterhead

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

LEED is developed through a consensus-based approach and evolves every few years. What is each LEED rating system composed of?

A

Credit categories

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

A company is looking at passive and mechanical methods of lowering the building’s energy load, such as:

A

Configuring the building to minimize solar gain in summer and maximize it in winter

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

Conventionally which of the following has been primary used to replace CFC-11?

A

HCFC-123

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

The USGBC is a not for profit organization that promotes the triple bottom line through its:

A

Guiding Principles

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

The Integrative Process is used to identify synergies, which result in short and long term cost savings. What is also true about the IP? (CHOOSE 2)

A
  • It reduces change orders during construction
  • It can decrease the likelihood of delays and costs resulting from design changes during the construction documents phase
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
Q

A facility manager is looking for information on how to improve IAQ throughout the life of the building. Which of the following strategies will support this goal?

A

Outlining green cleaning procedures and goals for custodians

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
26
Q

According to LEED, who defines the site’s open space requirements?

A

The local zoning authority

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
27
Q

LeadingGreen just signed a contract with the City of Toronto that allows the company to work out of an historic building. How can the city achieve carbon neutrality for the building?

A

Purchase carbon offsets

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
28
Q

LeadingGreen wants to establish green building goals across the entire design while using stakeholders’ expertise. What workshop helps achieve this?

A

Charrette

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
29
Q

A project is attempting to meet the EQ credit for enhanced air quality. Which of the following would be well suited for an entryway system?

A

Low VOC rubber mat

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
30
Q

What is TRUE about credit forms submitted via LEED Online?

A

The forms can be changed until they are submitted for review to the GBCI

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
31
Q

An extermination company is going out of business because building owners are reducing the need for pesticides by:

A

Developing a coordinated program of nonchemical strategies

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
32
Q

Open space can contribute to many credits in multiple credit categories. Select the example of quality open space:

A

A jogging trail around a natural wetland

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
33
Q

Innovert Real Estate Investment Trust is reviewing its current portfolio and notices an immense amount of water being consumed in its older building stock, which is costing a lot due to increasing water prices. It is cost-prohibitive to replace all the plumbing, so the project team suggested alternative approaches to reduce potable water. Which are the most efficient ways to reduce potable water?

A

Installing new low-flow aerators

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
34
Q

A developer has selected to construct their headquarters beside a protected wetland. The goals of the project are to reduce energy consumption, mitigate the Heat Island Effect, ensure the buildings occupants will be healthy, and protect the wetland’s habitat. How can the developer accomplish this?

A

Complete a site assessment in the integrative process

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
35
Q

Which of the following options is not addressed in the minimum program requirement (MPR) in LEED?
a) The LEED boundary
b) Project’s location on existing land
c) Project size
d) A project’s energy efficiency

A

d) A project’s energy efficiency

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
36
Q

A project team has decided to take an integrative approach for the design and construction of their new office project. The success of an integrated project team is reliant on:

A

Commitment to the sustainability goals

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
37
Q

For the Building Disclosure and Optimization credit that looks at the ingredients of materials, which standards would help earn points? (CHOOSE 2)

A
  • Cradle to Cradle Certified
  • GreenScreen
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
38
Q

There is a prerequisite for LEED BD+C projects in Sustainable Sites that ensures the environment is protected by: (CHOOSE 3)

A
  • Soil Erosion
  • Waterway Sedimentation
  • Airborne dust
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
39
Q

Value engineering can result in reduced level of sustainability or just a more cost-effective approach. Which of the following would be an example of one?

A

Replacing an asphalt parking lot with a cheaper, cool-coloured gravel

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
40
Q

The LEED rating systems are updated on a regular development cycle. What are the basic types of improvements that keep the rating systems current? (Choose 3)

A
  • Development of Addendas to supplement the rating systems
  • Maintenance of the current versions of the rating systems
  • Major updates to provide the next versions of the rating systems
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
41
Q

Production of CFCs are banned under the Montreal protocol and HCFCs will be phased out by when?

A

2030

42
Q

Apple Inc. promotes an open-office concept, but also wants to use daylighting for entire floors, which has a number of trade-offs. How can they ensure that everyone receives adequate light?

A

Zoned daylighting controls

43
Q

A major focus in LEED is to ensure that a building is located on a site that is near diverse uses, in a dense area and has developmental constraints. Which credit category specifically encourages that?

A

Location and Transportation

44
Q

Evaluation of the economic performance of a product over its life-cycle is useful in determining using which procedure?

A

Life-cycle costing

45
Q

There are many new alternative compliant paths (ACPs) in LEED v4. Which of the following is an ACP for the International Green Construction Code (IgCC) for an entire building?

A

ASHRAE 189.1

46
Q

What two standards are found in many building codes? (Choose 2)

A

International Plumbing Code (IPC) & Uniform Plumbing Code (UPC)

47
Q

If a manufacturing company recycles used orange juice cartons for flooring, what would this result in? (CHOOSE 2)

A
  • A carpet that contains post-consumer recycled content
  • A reduced need for virgin materials
48
Q

Energy use intensity is metric of how much energy (kWh) a building uses per area (SF). Green buildings generally have how much of a lower energy use intensity than typical buildings?

A

24%

49
Q

LEED v4 has seven Impact Categories to accomplish the goals of the LEED rating system and ensure sustainability. How do the Impact Categories work towards a more sustainable building?

A

They determine which credits are worth more points.

50
Q

A LEED consultant is reviewing project site plans and documentation prior to submitting the project for review. What has the lowest priority in building design?

A

LEED rating system

51
Q

A project is located in northern Ontario where no mass transit infrastructure exists. How can this project still earn LEED points? (CHOOSE 2)

A
  • Enforce compressed work week scheduling
  • Encourage carpooling
52
Q

An integrated project team is reliant on:

A

Commitment to the sustainability goals

53
Q

A LEED consultant is reviewing calculations required to manage rainwater and reduce irrigation needs on the site. What information is required?

A

Precipitation data

54
Q

A manufacturing company is trying to determine if its roofing shingles comply with LEED requirements. Which factors help in this? (CHOOSE 2)

A

Reflectivity & Emissivity

55
Q

While minimum program requirements are essential to LEED in order to ensure compliance, prerequisites are also mandatory. What do all buildings pursing LEED BD+C: New Construction have to meet?

A

Must be a permanent structure, use a reasonable site boundary, and have a minimum floor area

56
Q

Which of the following is not from a source of alternative or renewable energy?

A

Demand response

57
Q

Which one of the following does not need to be considered when setting aside a location for the storage and collection of recyclables?

A

Having a separate dumpster for each material

58
Q

Which one of the following does not need to be considered when setting aside a location for the storage and collection of recyclables?

A

Having a separate dumpster for each material

59
Q

What aspect of the Environmental Product Declarations credit is required to know if it leads to LEED points or not?

A

The number of different permanently installed products used from different manufacturers

60
Q

The USGBC requires reporting different building parameters at least every 5 years to increase transparency, as well as to:

A

Contribute to knowledge that will advance research in the future

61
Q

Smart growth is a commonly used term to describe a best practice. Which of the following does not comply with this best management practice?

A

Selecting a site that is far from existing communities

62
Q

A project is under construction in Manhattan and has a near zero lot line, which makes it difficult to manage rainwater. What can this project do?

A

Install a vegetative roof

63
Q

In LEED v4, credits have been streamlined and numerous standards have been introduced in the Materials and Resources Category. Which group of credits is Environmental Product Declarations under?

A

Building Product Disclosure and Optimization

64
Q

How can a civil engineering team properly grade the site and determine the baseline measurement for outdoor water use on a project?

A

Use the EPA WaterSense Water Budget Tool

65
Q

What type of energy is used by products that are powered by means of an ordinary AC plug?

A

Plug load

66
Q

A project has reduced its water consumptions by 65% from EPA’s baseline. The owner can now ensure a healthy work environment by monitoring 2 of the following: (CHOOSE 2)

A
  • Carbon dioxide levels
  • Outdoor airflow
67
Q

How does the USGBC define quality views?

A

Flora, fauna, or sky

68
Q

LEED projects cover a wide range of building types and occupants. How does LEED define visitors (transients)? (Choose 2)

A

Retail customers & Peak outpatients

69
Q

Looking at the economic side of the triple bottom line, what is the most significant savings that results from water efficiency?

A

Reduced maintenance costs

70
Q

A development team bought a brownstone house. What would be the best way to select windows?

A

Consider the embodied energy of windows when purchasing replacements

71
Q

The greatest threat to global warming potential is presented by which group of refrigerants?

A

HFCs (HydroFluoroCarbons)

72
Q

Transportation is the second largest contributor of global greenhouse gases at what percentage?

A

33%

73
Q

Which strategy can the project team suggest if the building owner wants to maintain ongoing energy efficiency and performance?

A

Building automation systems

74
Q

Which of the following is not an example of greywater?

A

Wastewater from urinals

75
Q

Parking footprints are large contributors to the Heat Island Effect. What is an example of a local ordinance?

A

A law usually found in a municipal code

76
Q

How can an infill site positively affect the economic side of the triple bottom line?

A

By reducing infrastructure costs

77
Q

Renewable energy purchased as a carbon offset must meet which of the following criteria?

A

Green-e Climate Certified

78
Q

The integrative process is a crucial part of every credit category and results in environmental protection and money saved. How can the architect work with the contractors to ensure that the contractors purchase the correct materials?

A

Include the specifications in the purchasing policy

79
Q

A project development team just purchased an entire city on the coast of Oregon. Which of the following is one way that the project developer could successfully complete ‘adaptive reuse’?

A

Renovating an old steel mill into an apartment complex

80
Q

How does open space help promote sustainability? (CHOOSE 2)

A
  • Fosters social interaction
  • Links habitat corridors in urban areas
81
Q

Northeastern University is attempting to create a LEED Platinum® laboratory for its engineering department. What task must the integrative project team complete?

A

Identify opportunities for synergy

82
Q

The facility manager has installed permanent submeters for a few systems. What will this not help with?

A

Measuring the quality of reused stormwater

83
Q

Which of the following decreases as a project’s timeline progresses?

A

Ability to control costs

84
Q

A municipality has been losing a lot of tourism due to its coal power plant and the detrimental environmental effects associated with it. What can the city use to financially incentivize a developer to develop green buildings? (CHOOSE 3)

A
  • Revolving loan funds
  • Tax credits
  • Fee waivers
85
Q

In November 2016, LEED v4 was released after being delayed a year and was renamed from LEED 2012 after an open consensus process. Which of the following ensures this process stays intact?

A

The balloting process with USGBC membership

86
Q

Which of the following statements is TRUE regarding occupant surveys?

A

Surveys identify areas that need improvement

87
Q

In the site selection credit, which 2 governing bodies discourage developing on sensitive habitats? (CHOOSE 2)

A
  • The NatureServe Natural Heritage Program
  • State/local fish and wildlife agencies
88
Q

During the integrative process, a team is trying to find the best strategy to protect and/or restore the habitat on a previously developed site. What is one common strategy that helps lead to this credit?

A

Restore soils and revegetate the site

89
Q

The EPACT of 1992 states that the baseline water use of an apartment’s bathroom faucet is:

A

2.2 gpm

90
Q

The LEED rating systems must continue to push the envelope and to ensure that it keeps improving over time. Who develops the ongoing improvements?

A

USGBC member-based volunteer committees

91
Q

Which of the following LEED Impact Categories aims at supporting local economies and strengthening the green building industry through supply chain support?

A

Build a Greener Economy

92
Q

The existing TD office towers in downtown Toronto, which were constructed with single-pane windows, is retrofitted to include double-pane glass. This can lead to:

A

Decreased energy demand

93
Q

Looking at the economic side of the triple bottom line, which of the following factors impact the cost of LEED certification?

A

The square footage of the building

94
Q

Employee health is addressed in two categories, EQ and LT. Which of the following would earn LEED point(s)?

A

Select a site within walking distance of a bicycle network

95
Q

A new building is being constructed in the hot climate of Mexico City. The green building design includes a vegetative roof and an air-tight envelope to reduce air changes per hour and increase building efficiency. What will need to be considered due to this design?

A

Bringing in additional fresh air for indoor air quality

96
Q

Adaptive reuse, selecting to build infill, and regenerative design are all items encouraged in LEED and green building in general. What is an example of regenerative design?

A

A building that generates electricity and sends the excess to the grid

97
Q

Which of the following sustainable strategies would not assist with the outdoor water use reduction strategy?

A

Low-flow water closets

98
Q

How can satisfying the credit for High Priority Site benefit the community?

A

Help to revitalize the neighbourhood

99
Q

How would a larger parking lot impact the Water Efficiency Category?

A

Reduced need for irrigation

100
Q

Which LEED rating system has precertification?

A

LEED BD+C: Core and Shell

101
Q

Quadrel Development Inc. is beginning their first LEED project and has contacted LeadingGreen for some consulting services. What obstacles will Quadrel face?

A

The additional time for the integrative process

102
Q

The date is January 1 2025. LEED® v4 is outdated and will be replaced by LEED v5. What is the committee that is responsible for overseeing a consensus based approach in accordance with LEED protocols?

A

LEED Steering Committee