1
Q

Ufer is to be #_______.

A

4

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Ufer is to be a minimum of ________ feet in length. Extend ______ feet up out of the footing.

A

25’

5’

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

The ufer should be supported ________ inches up off the soil.

A

1 1/2”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What goes on the end of the ufer (the end out of the slab)?

A

Shepherds hook

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What’s the minimum diameter for a bollard post?

A

3”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What’s the minim height on a bollard post?

A

5’2”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What schedule steel is the bollard post?

A

Schedule 40 steel

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What’s the minimum embedment of the bollard post?

And what is the minimum size footing?

A

18”

16” X 16” X 20”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

The bollard post is to be plumb within _______ of an inch.

A

1/4”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

The bollard post is to be filled with __________, and capped ___________.

A

Concrete

Capped smooth

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What are the two acceptable type/sizes of landscape sleeves used under the driveway?

A

(1) - 3” or (2) - 2” diameter PVC pipe.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Where is the landscape sleeve installed?

A

Under the first tooled joint from the citywalk, extend a minimum of 6” past the edge of the driveway.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Where can you find the location of the courtyard drain pipes?

A

Architectural blueprints

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Courtyard drain pipes are to be a minimum of ________ inch pipe with _________ __________ at each end.

A

3”

Drain caps

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

All toilet and vent stacks should be kept a minimum of _______ inch(s) from the exterior form boards.

A

1”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

The main water service should be kept ________ to _______ inches from the form boards.

A

6” - 8”

17
Q

The STHD hold-downs should be plumb within _______ inch(s).

A

1 1/2”

18
Q

The MASA hold-downs are to be plumb within _________ inch(s).

A

1/2”

19
Q

All slab penetrations should be ________ and ________.

A

Boxed

Wrapped

20
Q

Verify all exterior door openings are marked where? And how?

A

On the form boards with paint or nails.

21
Q

Verify all stakes and vertical rebar have what on the ends?

A

Safety caps or Shepard’s hook

22
Q

What should you verify on your proceed when doing a pre-slab?
1.
2.
3.

A
  1. Room options
  2. Centric (if applicable)
  3. Plumbing options (if not verified at soils)