Ufer is to be #_______.
4
Ufer is to be a minimum of ________ feet in length. Extend ______ feet up out of the footing.
25’
5’
The ufer should be supported ________ inches up off the soil.
1 1/2”
What goes on the end of the ufer (the end out of the slab)?
Shepherds hook
What’s the minimum diameter for a bollard post?
3”
What’s the minim height on a bollard post?
5’2”
What schedule steel is the bollard post?
Schedule 40 steel
What’s the minimum embedment of the bollard post?
And what is the minimum size footing?
18”
16” X 16” X 20”
The bollard post is to be plumb within _______ of an inch.
1/4”
The bollard post is to be filled with __________, and capped ___________.
Concrete
Capped smooth
What are the two acceptable type/sizes of landscape sleeves used under the driveway?
(1) - 3” or (2) - 2” diameter PVC pipe.
Where is the landscape sleeve installed?
Under the first tooled joint from the citywalk, extend a minimum of 6” past the edge of the driveway.
Where can you find the location of the courtyard drain pipes?
Architectural blueprints
Courtyard drain pipes are to be a minimum of ________ inch pipe with _________ __________ at each end.
3”
Drain caps
All toilet and vent stacks should be kept a minimum of _______ inch(s) from the exterior form boards.
1”