Which 2 items represent the greatest risks an owner faces on a construction project?
1. Selecting the right partners to design and construct the building
2. Deciding the materials of construction
3. What type of delivery method to use
4. Selecting the right financing
5. Getting the correct zoning
- Selecting the right partners to design and construct the building
- What type of delivery method to use
Which of the following is not one of the main phases of a project?
1. operations
2. planning
3. financing
4. construction
5. design
- financing
Which of the following industries contributes the greatest percentage to the Gross Domestic Product in the USA?
1.steel
2.construction
3.automotive
4.movie
2.construction
Which of the following is true about the Commercial Building Industry sector?
1.Requires technical skills to construct
2.all of these
3.Constitutes approximately 1/3 of all construction
4.Includes government buildings
- All of these
This party has the primary responsibility for safety of the craft workers
1. the owner
2. the general contractor
3. the design architect
4. the design engineer
- the general contractor
over the past 40 years, technology has…
1. improved the efficiency of communication
2. increased both effectiveness and efficiency of communication
3. has not improved communication
4. improved the effectiveness of communication
- improve the efficiency of communication
roads, bridges, and wastewater treatment plants are considered to be in this industry sector
1. commercial
2. residential
3. industrial
4. environmental
5. heavy civil
- heavy civil
Building codes, standards, and specs control this part of a project
1.means and methods
2. quality
3. schedule
4. construction cost
- quality
This project manager is responsible for plans and specifications
1.owner PM
2.trade partner PM
3. builder PM
4. design PM
- Design PM
Over the past 50 years, productivity in construction
1. has kept pace with non-farm manufacturing
2. has increased with technology
3. has decreased
4. is higher than non-farm manufacturing
- has decreased
Research has shown that this delivery method has the lowest increase in overall cost and delivers the project the fastest
1. CM at risk
2. Design-Build
3. Design-Bid-Build
4. Construction Manager Agency
5. Integrated form of delivery
- Design-Build
Which of the following is not considered a primary player in the building process?
1.Engineer
2. Architect
3.Trade contractor
4. general contractor
5. owner
- trade contractor
This delievery method is the most established in courts of law
1. Design-Build
2. CM at Risk
3. Design-Bid-Build
4. Integrated form of delivery
5. CM agency
- Design-Bid-Build
Which of the following is not one of the six dials of project value
1. operations
2. location
3. safety
4. budget
5. quality
- Location
Which of the following delivery methods allows the owner flexibility in selection of team partners through negotiation
1. CM agency
2. Design-Build
3. CM at risk
4. Design-Bid-Build
5. Integrated form of delivery
- CM agency
- Design-Build
- CM at risk
- Integrated form of delivery