Mid Term Flashcards

1
Q

What are some advantages of automation?

A
  • human operators replaced
  • tasks can be performed that are beyond human capability
  • higher production speed
  • better quality production
  • improved safety
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

When a controller is auto, what is the only thing a person can change?

A

Set point

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Define a standard.

A

An accepted norm or requirement.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Define regulation.

A

A governmental order that has more power than an act.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Put in order of legal power.

  • Code
  • Act
  • Regulation
  • Rule
A
  • Act
  • Regulation
  • Code
  • Rule (doesnt have any legal power)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q
OH&S 
Part 2
Part 4
Part 15
Part 18
A

2-Hazard assessment, control, elimination
4-Chemical Hazards
15-Managing hazardous energy
18-PPE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

CEC
Section 0
Section 10
Section 18

A

0-Object, scope, definitions
10-Grounding and bonding
18-Hazardous locations

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

ASCA (I think this is Alberta Boilers Branch from the quiz)

Section 38, 39

A

Pressure Equipment Safety Regulations

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

ISA

  1. 1
  2. 4
A
  1. 1-Instrument symbols and identification

5. 4-Instrument Loop Diagrams

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

O&HS part 18

A

PPE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Where would you find the laws around type of electrical box for an area around a live gas well?

A

CEC section 18

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Where would you find information about the laws around PSV on a boiler?

A

ASCA section 38, 39

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What are the 4 industrial drawings?

A

PFD, P&ID Loop, Pictorial

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What is documentation?

A

Any material which provides info or serves as a record.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What are the types of documents we cover?

A

Schedule, work breakdown structure, budget, responsibility chart, instrumentation index, instrumentation diagrams, spec sheets

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What type of documentation is a Gantt Chart?

A

Schedule

17
Q

How does a work breakdown structure work?

A
  • compartmentalizes like tasts
  • helps get an idea of the timeline
  • not a schedule
  • itemizing like tasks
18
Q

Name the drawing this passage describes.

Instructions of the installation requirements and often based on the equipment location and piping arrangements.

A

Installation Drawing